文件名称:2017美赛优秀论文.zip
文件大小:35.77MB
文件格式:ZIP
更新时间:2022-11-28 13:31:32
2017美赛优秀论文
A Zambezi River Authority conference was held in March 2014, engineers warned that the foundations of the dam had weakened and there was a possibility of dam failure unless repairs were made. On 3 October 2014 the BBC reported that “The Kariba Dam is in a dangerous state. Opened in 1959, it was built on a seemingly solid bed of basalt. However, in the past 50 years, the torrents from the spillway have eroded that bedrock, carving a vast crater that has undercut the dam’s foundations, engineers are now warning that without urgent repairs, the whole dam will collapse. If that happened, a tsunami-like wall of water would rip through the Zambezi valley, reaching the Mozambique border within eight hours. The torrent would overwhelm Mozambique’s Cahora Bassa Dam and knock out 40% of southern Africa’s hydroelectric capacity. Along with the devastation of wildlife in the
【文件预览】:
2017美赛优秀论文
----2017F--72283.pdf(2.15MB)
----2017E--67171.pdf(1.42MB)
----2017F--72197.pdf(2.06MB)
----2017F--64486.pdf(3.01MB)
----2017D--67316.pdf(1.57MB)
----2017A--55069.pdf(2.56MB)
----2017D--68942.pdf(2.43MB)
----2017D--55295.pdf(3.33MB)
----2017B--70174.pdf(1.26MB)
----2017A--66500.pdf(3.62MB)
----2017C--55585.pdf(6.69MB)
----2017A--55280.pdf(1.56MB)
----2017B--69427.pdf(1.72MB)
----2017E--65123.pdf(2.49MB)
----2017B--70545.pdf(1.77MB)
----2017E--68242.pdf(1.54MB)
----2017C--55261.pdf(2.47MB)
----2017A--65448.pdf(2.66MB)
----2017E--61502.pdf(1.06MB)
----2017B--68303.pdf(2.04MB)
----2017C--55583.pdf(2.1MB)
----2017C--55278.pdf(2.11MB)
----2017D--56632.pdf(2.17MB)
----2017F--68940.pdf(2.24MB)
----2017E--71672.pdf(905KB)
----2017B--56731.pdf(2.54MB)