1) Every team member read the work item list from his/her team discussion, or blog, or talk to PM directly.
2) Everyone submit your work item for the 10 scrum days (1 item/day), it has to be real work, not just place-holders. The following style is acceptable:
title: “day #1: design module x”;
description: I will use <some pattern> and <some protocol> to make sure the module X is properly designed, working with backend, and <other modules> in designing this, I will reference similar designs in <reference 1> and <reference 2>.
note: the description is a must-have requirement.
every team member will need to publish his/her 10 day work item list (title + description) in team blog, identifying his/her name. this will be included into the “other-score” in the total score sheet.
Since many students want to have a good time @ “毕联” tonight, the due day of this is postponed oneday, to Wednesday, 5/18 noon.
again, the scoring guideline is similar other assignments:
1) if the submission is in high quality, and on time, full score (10 points); lower quality submission gets lower points.
2) if the submission is late, 0 points
3) if no submission, the student will get negative score (-10 points)