软件工程 - 个人的 beta 计划

时间:2022-02-08 08:53:45

1) Every team member read the work item list from his/her team discussion, or blog, or talk to PM directly. 

2) Everyone submit your work item for the 10 scrum days (1 item/day),  it has to be real work,  not just place-holders.  The following style is acceptable:

title: “day #1: design module x”; 

description: I will use <some pattern> and <some protocol> to make sure the module X is properly designed, working with backend, and <other modules>   in designing this,  I will reference similar designs in <reference 1> and <reference 2>.

note: the description is a must-have requirement.

 

every team member will need to publish his/her 10 day work item list (title + description) in team blog, identifying his/her name.  this will be included into the “other-score” in the total score sheet.   

 

Since many students want to have a good time @ “毕联” tonight,  the due day of this is postponed oneday, to Wednesday, 5/18 noon.

again, the scoring guideline is similar other assignments:

1) if the submission is in high quality, and on time, full score (10 points);  lower quality submission gets lower points.

2) if the submission is late,  0 points

3) if no submission, the student will get negative score (-10 points)