Project Management Process

时间:2021-08-07 08:47:11

Project Management Process
Description .......................................................................................................................................................................................1
STAGE/STEP/TASK SUMMARY LIST......................................................................................................................................2
Project Initiation 2
Project Control 4
Project Closure 5
Project Initiation..............................................................................................................................................................................7
Step 01: Project Kick Off 10
Step 02: Project Objective & Scope 13
Step 03: Project Schedule and Budgeting 15
Step 04: Stage Schedule and Budgeting 20
Step 05: Project Organization 26
Step 06: Project Control Procedures 32
Step 07: Business Case 35
Step 08: Project Initiation Stage Assessment 38
Project Control ..............................................................................................................................................................................43
Step 01: Stage Kick Off 44
Step 02: Project Board Meetings 48
Step 03: Quality Control 55
Step 04: Progress Control 60
Step 05: Change Control 64
Step 06: Issues Management 67
Step 07: Exception Situation 69
Step 08: Stage End Assessment 73
Project Closure..............................................................................................................................................................................81
Step 01: Final Product Evaluation 81
Step 02: Project Completion 83
Step 03: Process Improvement 85
Description
Overview
Project Management provides an integrated framework for project organization,
planning and control which is designed to:
- ensure the timely and cost-effective production of all the end-products,
- maintain acceptable standards of quality,
- achieve for the enterprise the benefit for which the investment in the
project has been made.

Project Initiation
Objective
To
- take the ideas and intentions of a group of people who see the need for a
project in their organization and convert them into a formal, planned,
resourced and funded project,
in a way that
- clearly and explicitly defines the objectives and scope of the project,
- develops an overall schedule of activities and resources (project plan)
required to carry out the whole project,
- develops a detailed schedule of activities and resources (stage plan)
required to carry out the next stage of the project,
- defines a project organization structure which can be used to effectively
manage and carry out the necessary work,
- establishes a convincing business case for the project,
- gains commitment and approval to the project from the appropriate level
of senior management,
so that
- the project is firmly set up for success, and
- the probability of producing a high quality product on budget and on
schedule is maximized.
Overview
At the start of any project, there will be a variety of ideas and opinions about the
purpose and scope of the project, what the final product of the project will be, and
how the project will be carried out. The Project Initiation Stage is concerned with
taking these ideas and intentions and developing them into a formal, planned,
resourced and funded project.
In order to define a project in this way, it is first necessary to clearly and explicitly
define what the project is intended to achieve and what its scope of interest will be.
By defining this first, a benchmark is created for assessing the quality of what is
actually produced at the end of the project.
It is also necessary to develop a process by which the project objectives can be
achieved. This process will typically involve carrying out a number of tasks and
Project Management Process
Project Management Process 8 of 86
producing a number of products during the course of the project. The tasks produce
the products. For clarity of purpose and for control reasons it is useful to arrange
these tasks in a top down structure, which progressively specify the required work
in more detail.
This is called a work breakdown structure. LBMS provides a series of standard
work breakdown structures for strategic planning and applications development.
However, it is important to look for opportunities to customize this for the particular
circumstances of the project and its objectives. The work breakdown structure will
provide a benchmark by which the quality of the project process can be assessed.
The Project Initiation Stage must also define what resources and associated time
commitment are required to carry out the project. The work breakdown structure
provides a basis from which this estimation can be carried out. The resource and
time commitment can be used to calculate an end date for the project and an
estimate of its cost. This information is key input into the establishment of a
business case for the intended project.
The overall project schedule is not at a sufficient level of detail to enable the
allocation of actual resources to tasks, or to control progress. It is necessary to
produce a more detailed plan for these purposes. This detailed plan is only
produced for the next stage of the project, usually covering an elapsed time of two
to four months.
The way the project is managed and executed is the key to its success. The
involvement of the right people for data capture and decision making is also crucial.
It is necessary to identify and recruit these people at the start of the project and to
define the project organization structure. It is also necessary to establish the
procedures that will be used by the people in the Project Organization Structure to
carry out and control the project work.
Finally, in order to establish a resourced and funded project, it is necessary to
establish a clear and convincing business case for the project. This business case
should be reviewed, and hopefully accepted by management. The business case
will identify the projected benefits of meeting the objectives of the project, and
balance these against the costs and risks associated with realizing these benefits.
The business case can also be used as a benchmark to compare against actual
results, costs and benefits in order to assess the ultimate success of the project.
The Project Initiation stage is described here as a sequence of steps. In reality,
once the objective and scope have been defined, many of these steps occur in
parallel, and the step products are developed iteratively, since there are many
dependencies between the steps. It is necessary to plan the Project Initiation
stage, albeit in an informal manner. Therefore it is important to create a Project
Initiation Kick Off Plan scheduling the activities and resources.
At the start of the project it will be necessary to classify the project by size:
- Small (3 to 20 elapsed days)
- Medium (1 to 3 elapsed months)
- Large (4 to 9 months).
Project Management Process
Project Management Process 9 of 86
Projects of greater than 9 months should be organized as a program containing
multiple, but discrete, medium and large projects.
Regardless of size, all projects will need to address the factors described above.
What will vary is how long it takes to execute, and the detail of the product.
Project Initiation should be conducted in a relatively short timeframe when
compared to the rest of the project. Small projects should take one or two days,
whereas medium to large may take two to four elapsed weeks. Small projects will
produce a Project Initiation Checklist. Medium and large projects will produce a
Project Initiation Report.
The Project Initiation Report is an overall plan for carrying out the whole project,
and a more detailed plan for the next stage of the project. It consists of:
- clearly defined objective,
- clearly defined dimensions of scope,
- overall schedule of activities for the project (project plan),
- project organization,
- clearly defined project control procedures to check and confirm quality,
usage of resources, costs and time, manage change and track issues,
- clearly stated business justification for the project,
- project budget.
In addition to the above, the plan for the next stage consists of:
- detailed schedule of activities for the stage (stage plan),
- quality review standards for products to be produced,
- identified resources and associated costs ,
- control tolerances.
By completing the Project Initiation Stage, the chances of a successful conclusion
to the project will significantly increase.
Upon completion of the Project Initiation stage the Project Board will make one of
two decisions:
- Go / No Go for the whole project.
- Go / No Go for the next stage.
The "go / no go" decision for the whole project generally applies to small and
medium projects, where the detailed stage plan will be for the whole project. The
"go / no go" decision for the next stage generally applies to large projects. The
next stage will usually be a detailed analysis of requirements. At the conclusion of
this stage the project plan will be updated and a detailed stage plan for the next
Project Management Process
Project Management Process 10 of 86
stage created. A recommendation to proceed will then be taken to the Capital
Aquisition Committee (CAC) for funding the entire project.
Step 01: Project Kick Off
Description
Objective
To
- produce a plan which defines how to perform the Project Initiation Stage
itself,
in a way that
- ensures the involvement and commitment of the key people who see the
need for the project and also of those who will fund it,
- takes account of the background to the project and of previous and
related initiatives,
- establishes a team to carry out the Project Initiation Stage,
so that
- a clear and explicit plan is available for setting up the project.
Overview
As the Project Initiation Stage is concerned primarily with producing a plan for the
overall project, so the Project Kick Off Step is concerned with producing a plan for
the Project Initiation Stage.
Project Kick Off is therefore concerned with producing a plan of the work required
to produce a plan for the whole project.
The Project Kick Off step is concerned with carrying out a high level review of the
background to the project and of related initiatives, recruiting the involvement of
those senior people who will be the ultimate customers and sponsors of the
project, reviewing and customizing the standard work breakdown structure for the
Project Initiation Stage and setting up a small team to carry out the Project
Initiation Stage. The manager for the Project Initiation stage may be different to the
manager of subsequent stages.
When scheduling the Project Initiation activities, understand that there is great deal
of interdependency between the steps. Project Kick Off should be carried out
quickly. If Project Initiation Stage takes four weeks, Project Kick Off should take
one day. In order to expedite this stage avoid producing a detailed plan based
upon estimates for each task. Review the outline of the Project Initiation Report
and determine the number and sequence of interviews, workshops and
investigations that are required to create the it.
Project Management Process
Project Management Process 11 of 86
The end result of the this step will be a Project Initiation Kick Off Plan listing
deliverables, techniques, committed resources and timescales for the Project
Initiation Stage.
A Project Initiation Kick Off Report is not required for small projects.
Task .010 Recruit Project Sponsor
Recruit a Project Sponsor responsible for the commitment of all resources required
to successfully conduct the Project Initiation Stage and to facilitate compliance
and commitment to all major project decisions.
This Project Sponsor will chair the Project Board which also includes both
Technical and Client representatives. Document the responsibilities to be
performed by the Project Sponsor.
It may only be possible to identify the Project Sponsor at this time, with other
Project Board members being identified later in Project Initiation when the Project
Scope is better understood.
Lack of a Project Sponsor of sufficient seniority is a major risk to the project. It is
recommended that no work continues until this is achieved.
Task .020 Recruit Project Initiation Stage Manager
Recruit a Stage Manager for the Project Initiation Stage who has experience in the
development approach and/or the business area under study and possesses the
level of experience and skill to manage the successful completion of the Stage.
It is likely that the Stage Manager will also fulfill the roles of the Project Coordinators
until later in Project Initiation. Document the responsibilities to be
performed by the Stage Manager.
Task .030 Review Related Studies
Review any previous studies addressing the area of interest. Ensure their content
reflects the current situation.
Examples include Terms of Reference, strategic level plans (Information
Technology and/or Business), and on-going project documentation where there is a
possibility of scope overlap.
Task .040 Prepare Project Initiation Kick Off Plan
There is a great deal of interdependency between the Project Initiation steps and
tasks. However it is important to define the project objective and scope first before
attempting the remaining steps.
Attempts to create a detailed Project Initiation plan with estimates for each and
every task will take far too long. The WBS should be considered more of a
checklist. It is important to apply JAD to gather high quality information in a
reduced time frame.
Review the activities in the Project Initiation stage and the outline of the Project
Initiation Report. The steps equate to the sections of the report. It is recommended
that the work be organized around producing the sections of the report. Determine
Project Management Process
Project Management Process 12 of 86
what information is needed and assess the best means of gathering it. This may
be in the form of research, interviews and workshops.
Identify the number of workshops. For each one, specify the objective, deliverables
and participants.
Identify and recruit additional resources to perform the Project Initiation stage.
Business Analysts will be involved in defining objective and scope, determining
organization, requirements, approach and costs, coordinating other resources,
preparing the recommendation and ensuring the successful completion of the
Project Initiation stage. Clients will be primarily involved in determining
requirements and preparing the business justification. Systems Analysts may be
involved in determining the project approach and selecting the appropriate template.
Identify resources who will be required to review and approve the Project Initiation
Report.
Estimate the effort and elapsed time for the remaining activities.
Create the Project Initiation Kick Off Plan listing deliverables, technique, committed
resources, start and end dates.
Ensure that each team member knows their project commitments.
Document any assumptions made while producing the Kick Off Plan.
Task .050 Brief The Team
Brief the project team on all aspects of the Kick Off Plan. Publish a summary for
absent team members and staff who will be assigned later in the stage.
Task .060 Initiate Stage Control Procedures
Initiate the control procedures that will be used during the stage and ensure that all
members of the Project Organization understand the procedures and know their
individual responsibilities.
Initiate logs for:
- quality reviews and follow-up,
- change control,
- issues.
Create any files that are needed for the stage. These may be in paper or electronic
form.
Task .070 Review Project Kick Off
Review the Project Initiation Kick Off with the Project Sponsor and gain agreement
to execute the Project Initiation stage.
Task .080 Kick Off Project Initiation
Project Management Process
Project Management Process 13 of 86
Arrange a formal Kick Off meeting with all the resources participating in the Project
Initiation.
It is important that the project in formally kicked off by the Project Sponsor in order
to foster a team spirit. It will also raise the profile of the project in the organization.
Step 02: Project Objective & Scope
Description
Objective
To
- clearly define the project boundaries,
in a way that
- identifies the types of boundary (scope dimensions) relevant to the
project,
- takes account of the background to the project,
- explores the variety of objectives and scope that the project could cover,
- clearly and explicitly defines what the project will cover,
- clearly and explicitly defines what the project will not cover,
so that
- a clear and commonly understood target and benchmark is available to
project members and other interested parties by which they can steer
the direction of the project and assess the quality of the final product.
Overview
It is important to establish at the outset of a project, a precise definition of the
purpose and scope of the project to ensure that both Business Partners and
Technical personnel are clear about the field of reference.
Any project carried out by an organization should be addressing one or more of the
Business Objectives of the organization. If it does not, why is the project being
carried out? Therefore to establish the objectives and scope of the project, it is first
necessary to identify the overall reason for the project by relating it to one or more
objectives of the organization. This will put the project into context for the
organization as a whole. It is vital that the project objective be clearly stated and
agreed before proceeding with the rest of Project Initiation. If this is not possible,
then do not continue.
The project objective can then be further defined in terms of scope. There are two
aspects to project scope, the scope of the investigation, and the scope of the
solution. At the start of the project it is unlikely that the problems and
Project Management Process
Project Management Process 14 of 86
requirements will be fully understood. However, in order to avoid wasting time by
analyzing irrelevant areas, the scope of investigation will help focus on those areas
thought most likely to be impacted by the project. Therefore the scope of
investigation may well expand as a better understanding of the problems is
achieved. The problems and requirements must be fully understood before a range
of cost justified solutions can be proposed. This will avoid the risk of focusing on
preconceived solutions, which may well be constrained by current practices, and
facilitate creative solutions. The clients will choose a solution based upon cost
justification criteria which may exclude some of the original requirements. This
scope of solution will be more closely defined and will determine the design and
build stages of the project.
Scope can be expressed in terms of dimensions. These include business
organization, business functions, data, geography, systems, operating
environments, etc. Identify the dimensions appropriate to the project and
determine those components in scope and those out of scope.
Scope will be further defined in terms of problems and requirements.
In effect the move from objective to requirements is a continuum illustrating the
progressive expansion of the project definition.
Task .010 Establish Project Objective
Conduct workshops and/or interviews with clients to identify the project objective.
This must be clearly stated and agreed. The project objective must also relate
back to a business objective, to ensure that the project is aligned with the
business direction of the organization.
Techniques: Objectives Formatting
Task .020 Establish Scope of Investigation
Determine which dimensions of scope to apply to defining the project.
Diagrammatically represent each dimension of scope, explicitly stating as narrative
bullet points what is in scope and what is out of scope.
Identify the constraints, specific limitations or exclusions within which the project
must operate.
Record any assumptions made in defining the scope of the investigation.
Techniques: Scoping Diagram
Data Modelling
Data Flow Diagrams
Task .030 Identify Initial Requirements
Identify the initial requirements. Validate them against the project objective. The
requirements will be fully investigated and described during the next stage.
Requirements express what the application must achieve (a solution is how it will
be achieved).
Project Management Process
Project Management Process 15 of 86
Conversely, problems express the limitations of the current business and system.
Identify the criteria for assessing the success of both the final project product and
the process used to create it (e.g., quality objectives, quantitative requirements,
expected benefits).
Techniques: Critical Requirements Analysis
Task .040 Identify Outline Solution
Where possible, prepare an outline solution to illustrate the feasibility of achieving
the defined business requirements for the project. Outline the likely nature of the
solution, and provide sufficient information for the preparation of a business case.
Techniques: Data Flow Diagrams
Data Modelling
Task .050 Identify Training Requirement
Determine the probable client training and technical writing requirement. This will
give the TDC advanced warning of their involvement in the project.
Task .060 Review Project Scope
Conduct a product review of the Objective statement (To, in a way that, so that...
construct) and Scope definition documents to ensure the scope meets the
business needs and all standards are met.
Step 03: Project Schedule and Budgeting
Description
Objective
To
- develop an overall time schedule for the project,
in a way that
- defines the overall development approach for the project,
- selects the appropriate template,
- produces a customized work breakdown structure (task list) specific to
the project,
- creates a range estimate for the target completion date, and the
associated total cost of the project,
- identifies the major Project Board control points,
- identifies the Client, development and operations resources required to
carry out the project,
Project Management Process
Project Management Process 16 of 86
- identifies hardware, software, contractor and training resources required
to carry out the project,
so that
- a schedule is available to guide the project and to use as a benchmark
by which progress on the project can be monitored and controlled.
Overview
Once the objective and scope are decided, it is necessary to determine what
activities are required to be carried out to meet the objective. The dependencies
between these activities can then be determined, which in turn allows resources
and timescales to be estimated.
This needs to be done for the whole project (project plan), and then in more detail
for the next stage of the project (stage plan). This step is concerned with the
overall project. The project schedule is not intended to direct resources to specific
activities on certain dates.
The ideal situation is to have a proven process on which to base the tasks for the
project. This may be a standard IT process or an outside process. It may be
necessary to build a process from a series of kernels (common steps).
Once a process is chosen, this should then be customized to the particular needs
of the project.
If a proven process is not available, it will be necessary to develop a process for
use on the project which conforms to the stage, step, task construct.
Once this has been done, it is necessary to estimate the resources, both client
and technical, required for the project. This should be expressed by resource type
or role (e.g., Client Accounts Clerk, Systems Analyst, Analyst Programmer) rather
than by individual. It should cover all personnel resources required, both full and
part time.
The requirements for other types of resource, such as office space and equipment,
should also be determined. A time line and cost estimate for the project can then
be developed.
The development of the project schedule is an iterative activity during Project
Initiation. The other steps carried out in Project Initiation will affect the schedule.
The project plan applies to large, multi-stage projects. For medium sized, single
stage projects it is not necessary to create a project plan. The detailed stage plan
will define the whole project from beginning to end.
Task .010 Determine Project Approach
The purpose of the project schedule is to provide an overall structure to the project.
The top-down stage and step estimates will be validated and revised as and when
each stage schedule is produced with detailed bottom-up estimates.
Project Management Process
Project Management Process 17 of 86
Review the Selecting and Adapting Guidelines within the Template section of the
LBMS Process HyperGuide to assist in determining the appropriate template.
Additionally, review the Concepts section for a specific template.
Either;
- Select a process template from the Process Library whose selection
criteria most closely match the project characteristics and risk profile,or
- Select the "Basic Work Breakdown Structure" in the Process Library
and expand by including predefined kernels and creating customized
steps and tasks.
Software Guidelines
Task .020 Determine Project Stages and Steps
Review the stages and steps from the chosen process template.
Based upon the project objective, scope, constraints and assumptions, tune the
project work breakdown structure to:
- Add new stages and/or steps,
- Remove unnecessary stages and/or steps,
- Merge stages and/or steps,
Removing stages and steps will probably increase project risk. Document the
risks and identify proposed countermeasures.
Review, and revise as appropriate, the predefined stage and step objective and
overview statements.
Create objective statements, using the "To, in a way that, so that..." construct, for
each custom built stage and step.
Create stage and step overviews. The stage overview should include a brief
rationale for the proposed stage and step selection and sequencing. Record all
assumptions and issues identified.
Review and revise the products to be produced by each stage. Start at the end of
the project with the final deliverable, and work forwards to the beginning. Describe
the objective, outline and content of each product. Validate the final product
against the project objective. For each stage product, break it down in to interim or
step level products. Again, describe the objective, outline and content of the step
products. This exercise will confirm that the primary project deliverables are clearly
defined and understood.
Software Guidelines
Task .030 Determine Stage and Step Product Workflow
Chart the sequence of stages and steps to reflect the intrinsic and architectural
dependencies inherent in the project.
Project Management Process
Project Management Process 18 of 86
An output of one step will be the input to another. Some inputs may be sourced
from outside the project. These External Inputs (e.g., Standards, Project Initiation
report of another project, etc.) must be identified. The project products and
external inputs will primarily determine the step dependencies.
Define the dependencies, and dependency type, between the steps. Steps within
a stage are not necessarily finish-start, but may be in parallel or phased. Stages
may also run in parallel with one another. Do not specify dependencies at the
stage level.
Ensure that all dependencies with other projects are identified. Examine other
Project Initiation Reports to assess inter-project dependencies.
Record all assumptions and issues identified.
Software Guidelines
Task .040 Estimate Duration
Project schedule estimates will be determined as duration or elapsed time.
Determine the duration for each step. It is recommended that you estimate in units
of a day. Step level estimates are unlikely to be less than one day. When
estimating duration, include expected non-productive and non-effective time.
Alternatively, produce an initial top-down estimate for the each stage and apportion
to the component steps.
It may be desirable to express the stage and step estimates as ranges, namely
best case and worst case. In this case create a single estimate as above and then
extrapolate the best and worst cases. Document with supporting assumptions.
Software Guidelines
Task .050 Establish Resource Requirements
When estimating duration, define an initial requirement for resources. For the
project schedule, it is sufficient to estimate the number of each type of resource
required, rather than specific people, e.g., 2 Programmers. Concentrate on
identifying the resource types who will either be part of the project team or who will
have a significant impact on the project.
Document the initial resource requirements, since if these assumptions are invalid
(e.g., Step 020, duration 30 days, resource requirement 2 Programmers) then the
step estimates will need to be revised. Documenting assumptions also facilitates
recreation of the estimates, and "what if analysis".
Convert the number of resource types in to a chargeable resource equivalent. This
is a function of the number of chargeable resource types and their assigned time
(including overheads of non-productive and non-effective time). Differentiate
between Internal Staff Resource Equivalent and External Staff Resource
Equivalent. For example, a step requiring 1 programmer assigned 50%, 2
contract programmers assigned 100%, and a DBA assigned for 25% of the time
will have an Internal Resource Equivalent of 0.5+0.25 or 0.75, and an External
Project Management Process
Project Management Process 19 of 86
Resource Equivalent of 1.0+1.0, or 2.0. This resource equivalent will be used to
calculate initial project costs.
Also identify other resources required for the project e.g. equipment,
accommodation etc.
The estimating and initial resourcing tasks as interdependent and will be done
interactively.
Software Guidelines
Task .060 Prepare Project Schedule
Develop an initial schedule of project activities.
Determine the proposed project start date and use the scheduler to calculate the
stage and step start and end dates.
Validate these dates against the project constraints. Adjust scope, dependency
and resources until a satisfactory balance is achieved. Revise any assumptions
that have been modified.
Software Guidelines
Task .070 Prepare Project Budget
Estimate the internal and external staff costs by step. Staff costs are a function of
step duration, resource equivalent and chargeable rate.
Estimate non-staff costs by step:
- Hardware
- Software
- Project Training,for the project team to develop the application
- Installation Training, for clients, operations, etc. to use the application
- Miscellaneous, includes supplies, copying and printing, accommodation,
subsistence, travel, or other costs which cannot be classified above.
Aggregate the costs by stage.
Software Guidelines
Task .080 Create Project Schedule Products
Produce and collate the project schedule documents at stage and step level:
- WBS Description Report,
- Products Report,
- Project Costs Report,
Project Management Process
Project Management Process 20 of 86
- Gantt chart,
- PERT chart.
Software Guidelines
Task .090 Document Project Process Success Criteria
Determine how the success of the project process will be measured and record as
a series of success criteria.
These will be used to measure the success of the process used on the project.
Task .100 Review Project Schedule
Conduct a product review of the Project Schedule and Budget to ensure that the
scope meets the business needs and that all technical standards are met.
Step 04: Stage Schedule and Budgeting
Description
Objective
To
- develop a time schedule and budget for the next stage of the project,
In a way that
- defines the tasks necessary to carry out the next stage of the project,
- determines the best approach to completing each activity,
- identifies the tools for performing the project work,
- identifies actual resource requirements,
- determines task and resource dependencies,
- creates an estimate for the cost of the stage,
- creates an estimated completion date for the stage,
So that
- a schedule is available to guide the next stage and to use as a
benchmark by which progress on the project can be monitored and
controlled.
Overview
Project Management Process
Project Management Process 21 of 86
An overall project schedule is required to determine complete project timescale,
resource requirements and costs. A more detailed schedule is required to manage
and control the project. This more detailed schedule is developed progressively
through the project by producing a schedule for the next stage during Project
Initiation and towards the end of subsequent project stages.
The overall project schedule provides a overview of the activities in the stage.
These activities need to be further defined to the point where all necessary tasks
have been identified. This should use the same approach as for developing the
overall project schedule. That is, using a proven process, or developing the
process if one does not exist.
Once this has been done it is necessary to estimate the resources required for the
stage. This should cover all personnel resources required, both full and part time,
and other types of resource such as office space and equipment. A time line and
cost estimate for the stage can then be developed.
The development of the stage schedule is an iterative activity during Project
Initiation. The other steps carried out in Project Initiation will affect the schedule.
For single stage projects, the stage plan is both the project and stage plan.
Task .010 Determine Next Stage Activities
Based upon the project and stage objective, scope, constraints and assumptions,
tune the stage work breakdown structure to:
- Add new steps and/or tasks,
- Remove unnecessary steps and/or tasks,
- Merge steps and/or tasks,
The project plan identified the probable steps within the stage. Now is the
opportunity to reassess the steps and their associated objectives and products.
Removing steps and tasks may increase project risk. Document these risks and
identify proposed countermeasures, which may include additional quality
assurance tasks.
Determine the products to be produced by each step. Start at the end of the stage
with the final deliverable, and work forwards to the beginning. Describe the
objective, outline and content of each product. Validate the final product against
the project and stage objective.
Within each step, identify the tasks or activities required to produce the step
products. A task will have the following characteristics:
- Reference
- Name
- Description
- Input
Project Management Process
Project Management Process 22 of 86
- Output or product
- Technique (optional)
- Tool (optional)
- Role / responsibility assignment
- Resource / responsibility assignment
- Effort estimate
In this task define the Task Reference, Name, Description, Product, Techniques
and Tools.
Record all assumptions and issues identified.
Software Guidelines
Task .020 Determine Product Workflow
Chart the sequence of stages and steps to reflect the intrinsic and architectural
dependencies inherent in the project.
An output or product of one task will usually be the input to another, and this will
be the primary driver in determining the task dependencies and workflow.
Determine whether the successor task references (throughput) or updates (entry
requirement) the input product.
Some inputs may be sourced from outside the project. Identify these External
Inputs (e.g., Long Range System Plan, Standards, Project Initiation report of
another project, etc.).
Review the dependencies determined by the task inputs and outputs. Review the
dependency types between the tasks. Tasks are not necessarily finish-start, but
may be in parallel or phased. Where appropriate, define lags (both positive and
negative) between tasks. Remove any step dependencies. It is recommended that
the dependencies be kept simple and reduced to a minimum, otherwise the
schedule will be very difficult to execute and will probably be abandoned.
Ensure that all dependencies with other projects are identified. Examine other
Project Initiation Reports to assess interproject dependencies.
Record all assumptions and issues identified.
Software Guidelines
Task .030 Estimate Effort
Stage schedule estimates will be determined as effort time (or work). Determine
the total effort per task. Remember to include peer review and revision time if such
activities are not identified as specific tasks. It is recommended that you estimate
Project Management Process
Project Management Process 23 of 86
in units of an hour. Avoid estimating tasks to less than one hour. It is advisable to
estimate in units of 4 hours. No task should be longer than 80 hours.
By combining small tasks and including a detailed description of the task it will be
possible to simplify the schedule merely by reducing the number of tasks in the
Gantt.
The task effort estimates will be apportioned to individual roles and resources in the
next task.
Record all assumptions supporting the estimate in the task description. This is
very important because it will enable you to recreate and substantiate the estimate.
It will also ensure that you have thoroughly thoughout what is to be done, and that
it is communicated clearly to the Team. Estimating takes time, but it will validate
the tasks, products, techniques and assumptions.
Aggregate the task estimates and compare against the original top-down step and
stage estimates. If the detailed estimate is substantially different from the original
top-down estimate it may be necessary to refer to the Project Board and consider
revising both the project and stage plans.
Software Guidelines
Task .040 Allocate Resources
Assign roles and their associated responsibility to each task. In order to avoid
overwhelming the plan with complexity focus on the "produce", "consult" and
"review" responsibilities. The "approve" responsibility will generally apply only to
the Project Board. The responsibilities are defined as follows:
- Produce: to create the product of the task. Usually applies to Project
Team Members like Business Analysts, Systems Analysts and
Programmers. The schedule will be simpler to balance if only a single
role is assigned per task.
- Consult: provide information required to produce the task. Usually
applies Coordinators and Key Resources.
- Review: review the product for correctness, accuracy and completeness.
Usually applies Coordinators and Key Resources.
- Approve: official signoff. Usually applies to the Project Board.
Assign resources to the roles and responsibilities.
Apportion the total task effort estimate to the resources. As a tip, the schedule will
be much easier to balance if the task effort estimate is apportioned entirely to the a
single "produce" resource. Therefore this estimate should include time for the
other "consult" and "review" resources, e.g., Client review, DBA review. Although
this is a simplification, it is still applicable if the non-project team costs are
excluded from the plan, since the estimates are primarily for the Project Team.
The "consult", "review" and "approve" resources still need to be assigned to tasks,
albeit at zero work, in order for them to be included in the schedule.
Project Management Process
Project Management Process 24 of 86
Define by task the resources availability (unit). The scheduler will calculate task
duration as effort / unit.
Software Guidelines
Task .050 Prepare Stage Schedule
Develop an initial schedule of project activities.
Determine the proposed stage start date and use the scheduler to calculate the
step and task start and end dates. Validate these dates against the project
constraints.
Review the project objective, constraints and control factors before attempting to
balance the plan. Deadline, resource utilization and costs can be adjusted as
follows:
- Modify dependencies,
- Modify dependency type (finish-start, lag, etc.),
- Modify tasks and therefore the effort estimate (avoid arbitarily reducing
estimates),
- Assign more resources (task duration will theoretically be reduced if
more resources are applied to the task),
- Reassign more proficient resources,
- Provide productivity enhancing tools,
- Train and coach team members,
- Motivate team members,
- Increase resource availability.
Modify task descriptions and assumptions to record all the adjustments to the
plan. Failure to do this will result in a mismatch between the original plan and the
current schedule, and reduce the probability of project success.
Software Guidelines
Task .060 Prepare Stage Budget
Determine staff costs at the task level. This is a function of the resource work and
chargeable rate. The Process Manager will supply standard hourly rates for both
Internal Staff and External Contractors.
Determine non-staff costs for the stage by category. The categories are:
- Hardware & Network
- Software
Project Management Process
Project Management Process 25 of 86
- Project Training, training the project team to execute the project
- Installation Training, training the clients, operations, etc. to use the
application
- Miscellaneous, includes supplies, copying of training materials,
accommodation, subsistence, travel, or other costs which cannot be
classified above.
Software Guidelines
Task .070 Baseline Stage Schedule
Once a satisfactory balanced stage schedule and budget has been achieved,
baseline it. This will retain a record of the original start and end dates, work and
duration estimates, and staffing costs
Actual progress will be monitored against this baseline.
Software Guidelines
Task .080 Create Stage Schedule Products
Produce and collate the project schedule documents at the step and task level:
- WBS Description Report,
- Products Report,
- Resource Report,
- Baseline Stage Estimates,
- Baseline Resource Work
- Cost Workbook,
- Gantt chart,
- PERT chart,
- Resource Usage
- Project Summary Report
Software Guidelines.
Task .090 Review Stage Schedule Products
Conduct a product review of the Stage Schedule Products with the Process
Management Group to ensure that the scope meets the business needs and that
all technical standards are met.
Project Management Process
Project Management Process 26 of 86
Communicate the plan to the Project Board since it is a "contract" stating what is
to be done, how, when and by whom. If the Project Board accepts the plan, then
they are committed to supply the resources, both client and technical.
The Project Board will assign a project or stage start date for the schedule when
they authorize the project to proceed. This may require some minor adjustments
to the schedule.
Communicate the plan to the Project Team since it defines exactly what is to be
done. Hopefully they will have been heavily involved in producing the plan so there
should be no surprises and they will have already bought in to it.
Step 05: Project Organization
Description
Objective
To
- select and prepare the people whose involvement will be necessary for
the project to succeed,
In a way that
- clearly identifies roles and responsibilities,
- ensures that the best individuals to fulfill roles and responsibilities are
selected,
- identifies training required to enable individuals to fulfill their roles and
responsibilities on the project,
- gains the appropriate allocation of resource time to the project,
- ensures that all major interest groups are appropriately represented,
- updates the project and stage schedules in line with available resources,
so that
- the project benefits from having a group of people who can operate in an
integrated fashion and who understand exactly the roles they must play
in contributing to the success of the project.
Overview
Once the objectives of the project have been identified and a work breakdown
structure developed for how to meet these objectives, it is necessary to plan for the
people involvement on the project.
An important step in this planning is to identify the required roles and
responsibilities. This methodology provides a standard set of roles and
Project Management Process
Project Management Process 27 of 86
responsibilities for a project and it is necessary to review this list and customize it
for the particular project.
The Project Board is the most senior level of Project Organization and has the
responsibility of ensuring the continued integrity of the project from all points of
view. The structure of the Project Board reflects the tripartite responsibility that
exists in any project, namely the Business, Customer, and Technical interests.
The Board should be prepared to recommend termination of the project if
necessary.
The Stage Manager is recruited by the Project Board to ensure the successful
completion of the stage products, on time, within budget and to the specified
quality standards within an agreed tolerance.
The Stage Manager may be recruited from any area concerned with the project, or
may be from outside the immediate organization. The Stage Manager may need
help with the business, customer, or technical aspects of the project. This help is
provided by appointing a co-ordinator for each of these areas. This ensures that
the main interests being served by the project are properly represented at the
working level, e.g. through participation in quality reviews. This also provides
continuity in the day to day coordination of the project especially where there are to
be changes of Stage Manager.
There are likely to be a number of key individuals within the organization that have
an interest in, and can facilitate the project. They will receive regular progress
reports on the project, and will be invited to attend Project Board meetings.
The time commitment required for the project will vary for each role and
responsibility identified. It is important that the individuals selected to carry out the
various roles can devote the time that the project requires.
Once the roles, responsibilities, and time requirements for each activity are
defined, it is possible to assign individuals to perform the activities. It will often be
necessary to assign individuals to the project who do not have all the skills required
to perform their roles. Therefore, it is necessary to identify what additional training
these individuals require.
Individuals then need to be made available for their involvement on the project.
Task .010 Identify Key Personnel
Review the project Scoping Diagram. Identify those business areas that are within
scope or directly interface with the scope boundary and list them in the "Business
Area" column of the Project Assignment Worksheet. Project Organization
members will be selected from these groups. Do not forget to include development
and operations.
- Which areas will be directly impacted by the project?
- Which areas are not impacted today but may be impacted in the future?
- Which areas will the project team have to depend on for information
about the way things are done today?
Project Management Process
Project Management Process 28 of 86
- Upon which groups will the project depend for success?
Identify the key personnel for each area and list them in the "Person" column of the
Project Assignment Worksheet. Do not allocate roles in this task, just list any
personnel you think should be involved in the project.
Task .020 Recruit Project Board
Assemble a senior management team which will direct and be accountable for the
project and gain management commitment. Ensure that those senior Managers
with a significant interest in the successful outcome of the project are properly
represented.
Generally identify the lowest level person for each Project Board role. Work up the
organization chart until a person is found who can make the decisions "stick".
Project Sponsor:
- Which client executive will champion the project and sell it to the rest of
the company?
- Who is responsible for funding?
- Who will be the link between the project and the company strategy
team?
- Who is ultimately responsible for the success or failure of the project?
There may be several candidates, but there is only one Project Sponsor!
Client Representative:
- Who will represent the clients most affected by the delivered project?
- Who will ensure that the project is aligned to the client business need?
- Who will provide client resources for the project?
- Who will remove any barriers present in the client area?
Ideally there should be only one client representative, but there may need to be
more than one because no single person has authority over all the client areas
within project scope. However, the more Project Board members, the more
difficult it is to schedule them and obtain decisions.
Technical Representative:
- Who will provide technical resources for the project?
- Who is ultimately responsible for the technical quality of the project
products?
- Who will remove any barriers in the development and operations area?
Project Management Process
Project Management Process 29 of 86
Ensure that the Project Board members understand their responsibilities and the
time commitment that they are making to the project. Document the
responsibilities to be performed by the Project Board.
Task .030 Recruit Stage Manager
Identify a suitable manager for the next project stage, bearing in mind the nature
and importance of the activities involved.
- Who will manage the project on a day-to-day basis for this stage?
The person selected must be made available for the time required by the project. It
is suggested that it takes up to 15% of a Stage Manager's time to plan, control,
review, coach, etc. each team member. A project team of 6 people is almost a full
time job. There must be a recognition by the Stage Manager and the Project
Board that project management takes time, that it is an investment in project
success, and not a cost. The Stage Manager is not necessarily from development.
Sometimes the best person to manage the Project Initiation and Installation stages
of the project is a client.
Document the responsibilities to be performed by the Stage Manager.
Task .040 Recruit Project Coordinators
Identify the need for coordination and control activities throughout the project.
These are supporting roles to the Stage Manager. They may be filled by the Stage
Manager if the project is relatively small. They may also be filled by Key
resources.
Planning Co-ordinator:
- Who will help the stage manager create the plans, capture actual work
and costs, update plans, etc.
- Who is experienced with using the project scheduling tools?
- Who has strong administrative skills?
- Who has a detailed knowledge of the development project management
standards?
Client Co-ordinator:
- Who will assist in obtaining detailed information about how a client area
works?
- Who knows how the client area is organized?
- Who can assist in identifying the best Key Resource from a particular
client area?
Technical Co-ordinator:
- Who can facilitate the identification of project tasks required to produce
the required products?
Project Management Process
Project Management Process 30 of 86
- Who is skilled in the techniques used to create products?
- Who can ensure the technical quality of products?
- Who can assist in identifying the best Key Resource for a particular
technical issue?
Clearly define these co-ordination and control activities and identify and brief
suitable personnel to carry them out. Document the responsibilities to be
performed by the Coordinators.
Estimate the time required to perform these roles, and ensure that the individuals
selected have the necessary time available.
Task .050 Recruit Key Stakeholders
Identify other people who are critical to the success of the project. They are
management level personnel who will be affected by the project, but are not the
primary decision makers. Clearly define who these people are and what their
responsibilities are to the project.
- Who could slow down the project if they opposed the approach or
project?
- Who might informally assist the Project Board in evaluating objective,
scope, solution and financial viability?
- Who is not on the Project Board, but leads a client area included on the
Project Assignment Worksheet?
- Who has people in their area whose jobs may be impacted by the
implemented project?
- From whom is political buy-in required?
Document the responsibilities to be performed by the Stakeholders.
Estimate the time required to perform these roles, and ensure that the individuals
selected have the necessary time available.
Task .060 Recruit Stage Teams
If there is confidence that the Project Initiation will result in an immediate
authorization to proceed to the next stage then perform this task now. If not, then
it will be performed after the Project Board authorizes the project to proceed as part
of the next stage planning.
There are two types of team members, client and technical. People assigned to
team member roles will usually fulfill the "produce" responsibility for tasks.
Team members may change from stage to stage as different skill sets are required.
Identify appropriate personnel required for the stage, define the team structure and,
if necessary appoint Team Leaders.
Project Management Process
Project Management Process 31 of 86
Ensure that the time commitments required for the project are defined and
understood by team members and their management, if appropriate. Document
the responsibilities to be performed by the Team members.
The appointment of the Team Leaders and Stage Teams completes the process of
delegating responsibility for the work down through the now established Project
Organization structure.
Task .070 Recruit Key Resources
If there is confidence that the Project Initiation will result in an immediate
authorization to proceed to the next stage then perform this task now. If not, then
it will be performed after the Project Board authorizes the project to proceed as part
of the next stage planning.
Identify any additional technical or business specialists required to support the
project. These roles contribute to the creation of products by providing information
about the business and reviewing the products. They generally fulfill the "consult"
and "approve" responsibilities. They will include both client and technical
personnel. Individuals assigned to a Key Resource role may also have project coordinator
responsibilities, but will not be team members. Key Resources may
change during the project depending on the skills required by the WBS.
Business Key Resources:
- Who will use the application?
- Who will provide the client information to create the products?
- Who can ensure that the business requirements are correctly
understood?
- Who can ensure that all the business requirements are captured?
- Who will assist in establishing and confirming the business case?
- Who has specialist skills required at this stage (legal, audit, Health &
Safety, etc.)?
Technical Key Resources:
- Who can ensure that technical products meet the technical standards?
- Who has specialist skills required at this stage (DBA, Communications,
Networks, Back-ups, Security, etc.)?
Clearly define the responsibilities of these resources and estimate the time
required by these Key Resources over the duration of the project. Document the
responsibilities to be performed by the Key Resources.
Task .080 Determine Training Requirements
Assess the capabilities and skills of all those identified as part of the Project
Organization.
Project Management Process
Project Management Process 32 of 86
Based upon this assessment establish a training plan to acquaint the project team
members with the methodologies, technologies, and business areas under study.
It may the first time that some clients have been involved in a development project
so it is important that they are adequately briefed as to the project management
and development process, and especially their roles and responsibilities. The
Project Organization step is intended to ensure that the clients, development and
operations are working as a single team on the project, and that artificial
organizational barriers are removed.
Update the project schedule to incorporate scheduled training activities.
Task .090 Create Project Organization Chart
Using the Project Assignment Worksheet, allocate the identified personnel to one
or more roles.
Ensure all key individuals are assigned an appropriate role, but don't overwhelm the
project with too many people.
Produce a Project Organization Chart defining reporting and communication lines
between all parties involved in the project.
Task .0100 Review Project Organization
Conduct a product review of the Project Organization to ensure that the proposed
organization reflects all participants needed to achieve the project objective.
Step 06: Project Control Procedures
Description
Objective
To
- ensure that all procedures required to carry out and control project work
are established,
In a way that
- identifies all necessary procedures,
- defines appropriate standards,
- defines necessary performance levels and tolerances,
So that
- all project work is carried out as effectively as possible.
Overview
Project Management Process
Project Management Process 33 of 86
There should be clearly established control procedures for any piece of work. A
Project is not an exception to this rule, but due to the nature of projects, these
procedures are often not readily available. It is therefore necessary to identify what
procedures are required and to define these procedures.
Any established project control procedures that an organization has in place
should be incorporated into the project plan. Procedures to consider are:
- Quality Control
- Progress Control
- Change Control
- Version Control
- Issue Resolution
Any existing procedures should be modified if necessary for the project. Additional
procedures may be required, depending on the nature of the project.
The project and stage schedules need to incorporate project control tasks, and
may need to be updated as a result of defining the control procedures.
Step 06: Project Control Procedures
Task .010 Set Up Project Administration
Create an electronic file structure to consistently maintain the administration of
plans, progress, status reports, change control and issue management.
Task .020 Establish Quality Control Procedure
Determine the mechanisms to be used to ensure the quality of products produced
during the project.
Task products may be subject to informal peer review. These task products should
be small and the peer reviews frequent, since defects can be quickly identified and
corrected with minimal rework.
Step products will be subject to formal review, with defects being recorded and
assigned for correction.
Specify for each product the Co-ordinators and Key Resources who will perform the
quality reviews.
See the "Quality Control" process for more details.
Task .030 Establish Progress Control Procedures
Set up the infrastructure to facilitate:
- capture of actual effort and re-estimated effort to complete,
Project Management Process
Project Management Process 34 of 86
- weekly status meetings to discuss achievements, forthcoming work, and
issues,
- production of weekly status reports.
See "Progress Control" process for more details.
Task .040 Establish Project Control Factors
Determine the project Control Factors.
It is important to agree in advance with the Project Board the "elasticity" of the
project, so that the suitable controls are applied in response to deviations from the
plan.
The Project Dimensions are:
- Cost: the total cost of personnel and non-personnel resources,
- Schedule: the stage end dates,
- Performance: the quantity and quality of products.
They can be controlled by the following Management Directives:
- Maximize: the project dimension which will be most tightly controlled,
with the least permitted deviation, to achieve project success,
- Constraint: the next most important dimension which will be optimized
within the constraints of the first,
- Accept: the dimension whose performance (or lack of) will have to be
accepted to achieve the first and second.
A directive can be assigned to only one project dimension.
Example 1: to meet the schedule end date, while constraining costs, we will
accept a lower quality product.
Example 2: to achieve a high quality product, while constraining costs, we will
accept a later finish date.
Quantify the tolerances with respect to schedule, cost and quality before the
Project Board is automatically alerted.
Task .050 Establish Change Control Procedures
Identify the need for change control on the project.
A change request may require rework to both completed products and those under
development, as well as future tasks. If it is not controlled then it will impact the
project schedule and costs, and quality of the final product.
Project Management Process
Project Management Process 35 of 86
Define the levels of change control to be used to control changes to each type of
product for this stage.
Create a Change Control Log.
See "Change Control" process for more details.
Task .060 Establish Issue Resolution Procedure
Create the Issue Log.
See "Issue Resolution" process for more details.
Task .070 Review Project Control Procedures
Conduct a review to ensure that the standard Project Controls are in place.
Step 07: Business Case
Description
Objective
To
- prepare a business case which compares the benefits and costs of the
proposed project,
in a way that
- looks creatively for all possible areas of benefit,
- thoroughly researches all areas of cost,
- quantifies benefits in financial terms wherever possible,
- quantifies cost in financial terms,
- provides an assessment of the risks of the project and ideas on how
they can be reduced,
- draws conclusions about the merits of the case,
- offers alternatives where appropriate,
- revises other sections of the project plan,
so that
- senior management has good quality quantitative information to guide
their decision as to whether to proceed with the project.
Overview
Project Management Process
Project Management Process 36 of 86
One of the objectives of the project initiation stage of a project is to gather sufficient
information to assess whether it is worthwhile to proceed.
Other Project Initiation steps will develop much of this information. This step
extends that information with financial values to provide a business case for the
continuation of the project.
One essential piece of information which has not been addressed in previous steps
is the identification of the benefits of the project. These must be researched and
documented.
The benefits can be compared against the costs which are included in the project
budget.
These two basic sets of information are then compared and analyzed to ensure
that proceeding with the project makes sense from a financial perspective.
This step also examines the risks associated with the project, which need to be
considered by senior management (the Project Board), when making decisions
about the project. Risks associated with the project as it has been defined in the
other Project Initiation steps are examined, and actions to reduce, mitigate, or
eliminate the risks are identified.
The risks of not carrying out the project are the risks associated with not achieving
the benefits identified for the project.
In developing the Business Case, it may be necessary to adjust other parts of the
project plan, including the Scope, Project and Stage schedules, and the Project
Organization.
Task .010 Determine the Project Costs
Review the project budget and determine that all development costs have been
identified.
The project constraints will have stated the maximum project cost. This task is
intended to develop an initial project budget within these constraints.
Develop an initial project level estimate of costs. As with the sliding planning
window, this project level estimate is intended to give an overall cost of the project.
It is a top-down estimate, and will be revised and revalidated at the end of each
stage. Although there will be many assumptions, it is very important that an initial
estimate of project costs is completed. Failure to produce an initial estimate of
project cost, with supporting assumptions and caveats, will tend to suggest that
the project objective, scope, approach and resourcing have not been properly
thought through.
Estimate costs by the following categories:
Development (including Conversion and Installation)
- Staffing, internal and external resources who will chargeable to the
project, e.g., project team, contractors, trainers, technical writers, etc.
Project Management Process
Project Management Process 37 of 86
- Hardware, includes purchases and licences
- Software, includes purchases and licences
- Project Training, for the project team to develop the application
- Installation Training, for clients, operations, etc. to use the application
- Miscellaneous, includes copying and printing, office space,
accommodation, travel, subsistence, supplies or other costs which
cannot be classified above.
Operational & Maintenance
- Staffing, operations, maintenance, support, clients, trainers
- Hardware, includes purchases, licences, machine time,
telecommunications, data storage
- Software, includes purchases and licences
- Miscellaneous, includes copying and printing, office space,
accommodation, travel, subsistence, supplies or other costs which
cannot be classified above.
Aggregate the Development costs by stage.
Task .020 Quantify Benefits
Identify and quantity all benefits associated with the final product of the project.
Attempt to put a financial value on each benefit, so that the benefits are tangible.
During project scoping Critical Requirements Analysis will have identified and
qualified the major requirements. The technique requires that "Performance
Criteria" and "Performance Levels" be identified for each Critical Performance Area
(CPA). The major requirements will be identified and associated with the
corresponding CPAs. It is therefore possible to extrapolate this further and place a
value upon a requirement and quantify the benefits.
For example: The performance criteria for the CPA "Perfect Order" may be the
number of incorrect orders per 1000 orders processed. The current performance
level is 50 per 1000. The required performance level is 10. The clients, in
conjunction with the project team, are expected to be able to translate this
reduction of errors from 50 to 10 into a $ value.
Define for each benefit, when it is expected to be accrued. It is very useful to be
able to map out the expected benefit through time since it will re-enforce the
justification of the project.
Quantifying thebenefits is an excellent way of setting realistic business
expectations of the project.
Document any calculations used to determine tangible benefits since it will be
necessary to repeat the calculation process in subsequent stages of the project.
Project Management Process
Project Management Process 38 of 86
Task .030 Determine Breakeven Point
Establish the breakeven point for the project as a whole
Create a cost worksheet which charts accumulated costs and accumulated
benefits through time. Generally, costs are incurred prior to accruing the benefits.
Where the benefit line crosses the cost line will indicate the expected breakeven
point.
Review whether the projected breakeven point is acceptable. The longer the
breakeven point, the less chance that it will ever be achieved.
Task .040 Analyze Risk
Determine the risks associated with conducting the project. Risks tend to be
factors which are not within the control of the project manager, but which could
nevertheless result in the failure to achieve the project success criteria.
Conduct a Risk Analysis. Risks can be categorized as:
- External Dependencies,
- Organizational,
- Planning,
- Business Case,
- Technical.
Evaluate each risk factor within these categories and determine a value. Aggregate
the risk values by category to determine low, medium and high risk areas.
The real benefit of this exercise is not in detemining a numeric vaule, but in
identifying areas of the project which are exposed to risk.
Identify the medium and high risk factors and determine appropriate
countermeasures to reduce, mitigate or eliminate the risks. Where appropriate
include these countemeasures as steps and tasks in the project and stage plans.
Document the assumptions in the task descriptions and cross reference them
back to the project risk factors.
Task .050 Review Business Case
Conduct a product review of the Business Case to ensure that the Business Case
is complete and accurate.
Step 08: Project Initiation Stage Assessment
Description
Objective
To
Project Management Process
Project Management Process 39 of 86
- document the results of the Project Initiation stage and to have the
results reviewed by management,
In a way that
- provides a comprehensive package of information from which a decision
can be made,
- gains agreement on the scope of project,
- gains agreement on the overall approach and schedule for the project,
- gains agreement on the Business Case for the project,
- gains agreement on the Project Organization,
- gains commitment to making the necessary resources available for the
project,
- gains agreement to the approach and schedule for the next stage of the
project,
- gains agreement to the control procedures defined for the project,
- provides a record of the project and stage plans for use in managing and
controlling the project if it gets authorization to proceed,
- confirms that the Project Initiation stage is complete,
so that
- a decision can be made as to whether to commit to and authorize the
project.
Overview
An Stage End Assessment should be held at the end of every stage in the project.
The Project/Stage Manager and Project Team report their progress and
recommendations to the Project Board to gain the Board's approval to proceed with
the project.
The work carried out in the Project Initiation steps is collated into a single product.
For small projects the document is the Project Initiation Checklist. This single
product comprises objectives and scope, organization, tentative schedule and
estimate, milestone activities and products, business case, and risk analysis.
For medium and large projects the document is the Project Initiation Report. It
consists of:
- Project Objective
- Project Scope
Project Management Process
Project Management Process 40 of 86
- Project & Stage Schedules
- Project Organization
- Project Control Procedures
- Business Case for the project
- Risk Analysis
- Recommendation
For medium projects the Project Initiation Report will include the detailed schedule
(Stage Plan) for the entire project. A "go / no go" decision will be made for the
entire project by the Project Board.
For large projects the Project Initiation Report will include the project level schedule
(Project Plan) and a detailed schedule (Stage Plan) for the next stage only. A "go
/ no go" decision for the next stage will be made by the Project Board. Upon
completion of this next stage, a recommendation to proceed with the entire project
will be made to the Capital Aquisition Committee. The Project Schedule consists
of:
- Project Level WBS Description
- Major Products List
- Overall Project Schedule
The Stage Plan for the next stage consists of:
- WBS Description Report
- Products List
- Resources Requirement (including roles and responsiblities)
- Baselined Stage Schedule
- Cost Worksheet for the next stage
By agreeing to the plans, the Project Board are committing to the provision of
funding and other resources, and understanding and accepting the assumptions,
pre-requisites and risks. They must ensure that appropriate Progress, Quality and
Change Control procedures are being administered effectively.
Task .010 Compile Project Initiation Report
For medium and large projects, collate all the elements of the Project Initiation
Report, and the project and stage plans, into a single product for review by the
Project Board.
Task .020 Prepare Project Initation Stage Assessment
Project Management Process
Project Management Process 41 of 86
Decide what decisions the Project Board must make. These will cover issues that
have arisen during Project Initiation, and the decision on how to proceed with the
project.
Determine the recommendations to be made to the Project Board concerning those
decisions. If the development Stage Manager and the Client Co-ordinator disagree,
then record both with supporting arguments.
Determine the information the Project Board needs to make the decisions.
Determine the best way to provide that information to the Project Board.
Prepare advance material for the Project Board.
Arrange and schedule a Project Board meeting and send out the advance material.
Prepare a structured agenda for the Project Board meeting.
Prepare a brief report covering the work carried out during the stage.
Task .030 Conduct Project Initiation Stage Assessment
Follow the prepared agenda and present the results of the stage to the Project
Board.
Make recommendation.
Task .040 Follow-Up Project Initiation Stage Assessment
Update the Project and Stage Plans based on the decisions made by the Project
Board.
Create a Stage End Approval Report and obtain Project Board signatories. Record
any qualifications.
Task .050 Compile Small Project Initiation Checklist
For small projects, create the Small Project Initiation Checklist. Attach the original
Blue Form.
Task .060 Prepare Small Project Assessment
The Project Initiation Checklist is to be reviewed by the following parties in order to
obtain the "go / no go" decision:
- Client Originator,
- Client Originator's Manager (Department Manager),
- development Project Manager,
- development Manager.
By agreeing to the Project Initiation Checklist the parties are committing to the
provision of funding and other resources, and understanding and accepting the
assumptions, pre-requisites and risks.
Project Management Process
Project Management Process 42 of 86
Determine the best way to obtain this decision. Either distribute the Project
Initiation Checklist to the individuals or organize a meeting.
Task .070 Review Small Project Assessment
Ensure that the parties clearly understand the character of the project, and how it
will be executed. Provide the parties with adequate information to enable them to
make a "go / no go" decision. Assess the urgency of the project relative to other
outstanding projects. Where possible set an expectation of the project Start and
End date.
Task .080 Follow-Up Small Project Assessment
Authorized small projects will be subject to the Small Project prioritization process.
Rejected small projects are removed from the prioritization process.
Project Management Process
Project Management Process 43 of 86
Project Control
Objective
To
- manage project work during a stage and prepare for the next stage,
in a way that
- controls project progress,
- controls the quality of project products,
- controls any changes that occur to previously agreed products,
- manages the configuration of the component products of the stage and
the project,
- resolves any issues identified during the stage,
- provides consistent reports to management as defined in the stage
schedule,
- controls the commitments of the project team and the expectations of
the client,
- provides appropriate decision making information,
so that
- this stage can reach a successful conclusion and the project can
progress to the next stage.
Overview
During a project stage, the focus should be on carrying out the work planned for the
stage. However, there are many project management activities that need to be
carried out in addition to the project work itself. In this methodology, these
activities are arranged into a series of steps. These steps fall into four categories:
- a step to initiate the stage,
- steps that are carried out on an on-going basis throughout the stage,
- steps that are carried out at the end of the stage,
- a step that is only carried out in an exception situation.
Project Management Process
Project Management Process 44 of 86
Most of these activities are planned for in the project and stage planning. The
procedures that are defined during Project Initiation, and are revised during further
stage planning, are followed in these steps.
The Project Management activities include:
- monitoring and controlling project progress, through the use of regular
checkpoints involving the project team and formal reviews with the
Project Board,
- controlling the quality of products,
- controlling the way changes to baselined products are implemented,
- controlling and resolving issues that arise during the course of the
project.
Several of the activities will result in changes to the stage schedule. The Stage
Manager should ensure that these changes are made smoothly, and that these
changes are communicated to all concerned. Any changes made to individual work
assignments should be confirmed in the regular checkpoint meetings.
In the event of a stage tolerance being exceeded, an exception situation will arise.
The Stage Plan will be replaced by an Exception Situation Report which will
explain how the exception arose, the options examined, and the proposed actions.
Step 01: Stage Kick Off
Description
Objective
To
- start the project work on the stage,
in a way that
- gains agreement and commitment to the stage plan from the project
team,
- sets up the project administration,
- initiates the on-going day by day execution of stage activities,
- initiates the stage control procedures,
so that
- the project team members can begin to work as a team for the success
of the stage and project.
Overview
Project Management Process
Project Management Process 45 of 86
Once the Project Board has authorized the project to proceed with the stage, it is
important to make a successful start to the work. Brief the project team on
achievements to date, the more detailed plans for the current stage, and their place
within the context of the overall project. There may be new team members who
need to be briefed on all aspects of the project and existing team members may
need to be brought up to date with any changes to the overall project plan.
Electronic and hardcopy file structures are set up to consistently maintain and
administer project management and development products.
All control and documentation procedures for the stage should be established and
the team should understand what these are for, how they are used, and what their
individual responsibilities are.
It is possible that the stage schedule is not at a sufficient level of detail to manage
and control the project on a day to day basis. This level of control may be
achieved using a commitment calendar, which details each person's work on the
project for a rolling four week window. This is initiated at stage start up and
updated regularly as the project progresses.
Task .010 Setup Stage Administration
The Process Manager will assign each new project a project nmemonic or acronym
which is to be used in all naming conventions.
Set up the project administration. Paperbased and electronic versions will be
maintained concurrently. Establish the Directories and create a master index.
Setup a hardcopy Project Binder with the following sections and contents:
Plans
- Project Initiation Report,
- Baselined Stage Schedule,
- Progress Control Tracking Schedules,
- Summary Cost Worksheet.
Change
- Change Control Requests,
- Change Control Log.
Issues
- Issue Log
Quality
- Quality Review Schedule,
Project Management Process
Project Management Process 46 of 86
- Quality Review Agendas,
- Quality Review Exception Item Lists.
Status
- Status Reports
- Flash Reports
- Stage End Report(s)
- Stage End Approval Report(s)
Create the following Server based PMC directory structure for the project:
Plans
- Project Initiation Report,
- Baselined Stage Schedule,
- Progress Control Tracking Gantts,
- Summary Cost Worksheet.
Change
- Change Control Requests,
- Change Control Log.
Issues
- Issue Log
Status
- Status Reports
- Flash Reports
- Stage End Report(s)
- Stage End Approval Report(s)
Task .020 Establish Checkpoint Cycle
Establish the project checkpoint cycle.
It is recommended that the checkpoint cycle be of one week duration. Determine
the start and end day.
Project Management Process
Project Management Process 47 of 86
For example, Checkpoint Cycle of Thursday thru Wednesday. Progress will be
captured for the period 8.00am Thursday through to 5.00pm the following
Wednesday. The plans will be updated for the Status Meeting on Thursday.
Task .030 Initiate Stage Version Control
Create one or more Development Product Directories, as appropriate, to file either
electronically or on paper where the stage development products will be located.
Update the Process Engineer Project File with the Product path for each
development product. This will support document management and access.
Products which have a Quality Review status of "QR Complete" or "QR Qualified &
Complete" will be require a baseline version number. If a product is made up of
multiple components, establish a version number for each component.
Identify the team member who will exercise configuration control for the
development products. This role will be responsible for controlling the revision of
versioned products.
Task .040 Acquire Stage Resources
Acquire the resources required to carry out the stage.
Task .050 Brief The Team
Brief both the project team and the key resources on the expectations for the
stage.
Walkthrough:
- stage objective,
- planned activities,
- products,
- organization, roles and responsiblities,
- metrics,
- project controls.
Task .060 Initiate Stage Control Procedures
Initiate the control procedures:
- Checkpoint Cycle,
- Progress Controls,
- Status Reporting,
- Change Control Log,
- Issue Log,
Project Management Process
Project Management Process 48 of 86
Step 02: Project Board Meetings
Description
Objective
To
- setup and manage an effective Project Board,
in a way that
- ensures that all Project Board Members understand and accept their
roles and responsibilities,
- ensures the Project Board provides executive direction to the project,
- ensures the Project Board is notified of project status and issues on a
timely basis,
- enables the Project Board to provide guidance to the Project Manager,
- enables the Project Manager to obtain executable decisions,
- guarantees ownership of the project by the Project Board,
so that
- the project is organized for success.
Overview
The Project Board is the executive authority of a project. It authorizes the project
to proceed, change direction or stop. It enters in to a contract with the Project
Manager through the Project Initiation, Project and Stage Plans, to provide the
executive support and resources required to execute a project which will deliver the
specified products to schedule and budget. In effect, the Project Board acts as the
project guardians, enabling the Project Manager and Project Team to do their job
protected "from the arrows of outrageous fortune".
The Project Board is not expected to have a close day to day association with the
project, that after all is the responsibility of the Project Manager. However, they do
need to meet with the Project Manager periodically to review the achievement of
objectives, scope, schedule, budget and quality products, and to resolve
outstanding issues and change requests.
The Project Board should view the project as an investment intended to yield
significant business benefits. Failure to achieve those benefits reflects as much
upon the control exercised by the Project Board as it does on the execution of
responsibilities by the Project Manager and Project Team.
Task .010 Determine Frequency of Project Board Meetings
The frequency of Project Board meetings is a function of:
Project Management Process
Project Management Process 49 of 86
- the experience and expertise of the Project Manager,
- the size and complexity of the project,
- the requirement for senior management direction and support,
- the length of the stage,
- the overall project risk,
- the overall project cost,
- the magnitude of the loss resulting from project failure.
As a minimum the Project Board will meet at the end of each stage, including
Project Initiation, to review the achievements of the concluded stage and authorize
proceeding to the next.
The following table provides some qualitative guidelines for determining the
frequency of Project Board meetings, including those at the end of each stage.
Factor Calculation
Project Manager's experience High = 0, Moderate = 1, Low = 3
Project size No. of major sub-projects
Stage duration <2 months = 0, 2-4 months = 1, 4> months = 3
Overall project risk Low = 0, Moderate = 1, High = 2, Extreme = 3
Project cost <$250K = 0,<$500K = 1,<$750K = 2, $750K> = 3
Mission critical Yes = 3, No = 0
Total
Frequency Value Project Board Frequency
15+ 2 Weeks
11 - 15 4 Weeks
06 - 10 6 Weeks
00 - 05 8 Weeks
Task .020 Schedule Project Board Meetings
Schedule standing Project Board Meetings for the entire stage.
Task .030 Brief Project Board
Following the recruitment of the Project Board at the beginning of the project it is
important to brief all participants to ensure that they completely understand their
roles and responsibilities, and that they accept the commitment.
Generic Project Board responsibilities:
- Responsible for the ultimate success or otherwise of the project.
- Approve project objective, scope, approach, functionality, quality, cost
and schedule.
Project Management Process
Project Management Process 50 of 86
- Set the permitted degree of deviation from planned scope, cost and
deadline before the Project Manager is required to report exceptions to
the Project Board.
- Ensure the project is aligned with strategic business objectives.
- Ensure the business case is viable, and remains viable.
- Provide required resources and funding.
- Resolve issues and mitigate risks in an expeditious and timely manner
when escalated by the Project Manager.
- Authorize progress to next stage.
- Authorize cancellation or suspension of the project.
- Direct their line management to actively support and participate in the
project.
- Inform their line management of project status and progress.
- Attend all Project Board meetings.
Sponsor:
- Champion the project throughout the organization.
- Obtains resolution of major project issues through more senior
management intervention.
Client Representative(s):
- Represent the client business areas most affected by the final results of
the project.
- Authorize the allocation of appropriate and sufficient client resources to
the project team.
- Ensure the delivered system will work in the business organization.
Technical Representative(s):
- Represent the technical interests of development and/or operations.
- Authorize the allocation of adequate and appropriate technical resources
to the project team.
- Ensure the delivered system is consistent with development technical
strategy.
- Monitor the successful application of development standards.
Task .040 Prepare for Project Board Meeting
Project Management Process
Project Management Process 51 of 86
It is the responsibility of the Project Manager to schedule standing Project Board
meetings at the beginning of the project. Confirm the logistics of the next meeting,
namely date, time and conference room.
Create the meeting agenda. It is recommended that you use the Word 6.0 Agenda
Wizard (standard style) to create the agenda. This Wizard also creates the
skeleton meeting minutes. Confirm the agenda with the Project Sponsor.
Assemble any additional documentation that requires reading as preparation for the
Project Board meeting.
Distribute the meeting agenda and additional documentation at least 3 days prior to
the meeting.
Confirm individual Project Board member attendance. Where a Project Board
member is unable to attend, it is that individual's responsiblity to arrange a
substitute, and to notify the Project Manager.
Identify a documenter to take meeting minutes.
Task .050 Conduct Project Board Meeting
The Project Manager will conduct the meeting according to the agenda.
See the tasks below for suggested discussion points for specific types of Project
Board meeting.
Confirm attendance and logistics of the next meeting.
Task .060 Follow-up Project Board Meeting
Create the meeting minutes. It is recommended that you use the Word 6.0
Agenda Wizard (standard style) to create the meeting minutes. Distribute to all
Project Board members. File a copy in the Project Binder.
Task .070 Project Initiation Stage Project Board Meeting
The Project Initiation Report is the contract between the Project Manager and
Project Board concerning the execution of the project. Although this meeting is
not intended as a detailed "line item" review, it is important that the Project Board
fully understand and accept the Project Initiation Report. If the Project Board
authorizes the project to continue they must be prepared to provide unconditional
support to the Project Team.
Topics for discussion include:
Project Initiation
- Project objective statement
- Scope
- Initial requirements
- Constraints
Project Management Process
Project Management Process 52 of 86
- Project approach (stage objectives)
- Project and stage products
- Project organization (project board, key stakeholders and project
coordinators)
- Resource equivalent requirements
- Project costs, benefits and viability
- Risks and issues
- Recommendation
Project Plan
- Project schedule
Stage Plan
- Stage and step objective statements
- Stage and step products
- Stage schedule, including probable start date
- Project team resources
- Key client and technical resources
Task .080 End of Stage Project Board Meeting
Review the Stage End Assessment Report. The objective is identify key learning's
from this stage and apply them to the next stage. It is all a matter of reducing risk
and setting realistic expectations. Consider the following questions:
Objective
- Is the project objective statement still valid?
- How has the objective statement changed?
Scope
- Were all the tasks completed as specified?
- Were any tasks not executed and why?
- Were any additional unplanned tasks executed and why?
- Were the tasks executed in the planned sequence, and if not, why?
Project Management Process
Project Management Process 53 of 86
- Has scope changed without being subject to a formal change request?
- How many change requests were received, analyzed, accepted and or
rejected?
Schedules
- Did the stage exceed schedule, and if so, by how much and why?
- What recovery actions, if any, were taken?
- Was a Tracking Gantt chart maintained?
- How effective were the progress controls?
Cost
- Did you monitor stage costs?
- Did the stage exceed budget, and if so, by how much and why?
- What recovery actions, if any, were taken?
Products
- Were the planned products produced?
- What planned products were not produced and why?
- What additional products were produced and why?
- What additional products should have been produced?
- Did the format and medium of products change from plan?
- Where is the Quality Plan?
- What products failed quality review, or were accepted with qualification?
- How effective was the quality review process?
- Do the products provide an effective baseline for future development and
maintenance?
Client Alignment
- Are client representatives still committed to the project?
- Did the project organization (system and business) present obstacles to
progress?
- Were the clients available when required and for long enough?
- Did the clients effectively participate in the project?
Project Management Process
Project Management Process 54 of 86
- How often did the Project Board meet?
- Did the Project Board meet as scheduled?Issues
- Are there any unresolved business issues?
- Are there any unresolved technical issues?
Risk
- Did the Critical Success Factors correctly identify possible risks?
- What additional factors impacted the project?
Review the Project Plan
- Revised project schedule
- Revised project costs
- Revised project benefits
Review the Next Stage Plan
- Stage and step objective statements
- Stage and step products
- Stage schedule
- Project team resources
- Key client and technical resources
- Recommendation
Task .090 Intra-Stage Project Board Meeting
Agenda items for discussion include:
- Project progress
- Stage progress vs. schedule
- Actual stage costs vs. budgeted stage costs
- Quality Plan
- Issues Log (including specific decisions required of the Project Board)
- Change Requests (awaiting authorization)
- Change Request Log
Project Management Process
Project Management Process 55 of 86
- Risk and mitigation measures
Task .0100 Project Closure Project Board Meeting
Report to the Project Board the results of the Post Implementation Review. This
assesses the performance of the new system against the objectives planned. It
also identifies and captures metrics and factors that will improve the development
process.
Determine whether the project achieved it's objectives and whether it was a
success.
Evaluate team achievements and determine suitability of awards.
Step 03: Quality Control
Description
Objective
To
- confirm that a product is complete,
in a way that
- involves business and technical staff,
- ensures that products meet defined technical standards,
- ensures that products meet business requirements,
- ensures clarity of the product,
- ensures that there is no ambiguity in the product,
- establishes a baseline version of the product,
- continually improves the quality control procedure,
so that
- the related project activities can be signed off as completed and the
project can progress.
Overview
ISO9001 definition of quality; "The totality of features and characteristics of a
product or service which bear on its ability to satisfy a given need".
Work on a product can only be considered complete when the product has been
tested against acceptance criteria, that have been previously established for the
Project Management Process
Project Management Process 56 of 86
product. It is important that those criteria are established in advance, since it is
difficult to produce a product if you do not know what it is you are trying to produce.
When quality control is correctly applied, it can make a project team more
effective, since it prevents situations where work has been carried out based on a
product that is not acceptable.
Establish the degree of quality control to be applied to each product during the
planning work for a stage. This step is used when a product is thought to be
complete, and the product is either confirmed as complete, or corrected until it is
confirmed as complete
The underlying quality principle applied in this methodology is that a quality product
is achieved by using a quality process, and quality control is a final, but necessary
step in that quality process. The quality process itself should be reviewed to
ensure that it is achieving the objectives set for the process.
Project Management Process
Project Management Process 57 of 86
Task Summary
.010 Schedule Quality Review
.020 Prepare for Quality Review
.030 Conduct Quality Review
.040 Follow-up Quality Review
.050 Review Quality Control Procedures
Project Management Process
Project Management Process 58 of 86
Project Control : Step 03: Quality Control
Task .010 Schedule Quality Review
Schedule the Quality Reviews for the current stage.
The WBS identifies the resources fulfilling the "review" responsibilities. The
schedule will determine when the Quality Reviews need to take place. In practice
these dates will need to be adjusted to fit individual's calenders.
Alternatively, Quality Reviews can be explicitly defined as separate milestone
tasks, without successors.
It is recommended that Quality Reviews be scheduled at the beginning of the stage
to occur regularly every two or three weeks. This will ensure that reviewers are
aware well in advance when they are to participate, and it will reduce scheduling
conflicts. It will also motivate the project team to create small products at regular
intervals. Quality Reviews can always be postponed if the products are not ready
for review.
Software Guidelines
Task .020 Prepare for Quality Review
Create a Quality Review Agenda specifying the objective, products, logistics, roles,
responsibilities and agenda of the Quality Review.
Distribute the Quality Review Agenda and the product to the reviewers not less
than 3 working days prior to the review.
The reviewers are required to review the product before the Quality Review meeting.
They will annotate the product with comments and errors.
Clients will review the product to ensure accuracy and completeness of business
content.
Technical reviewers will evaluate the product against specific standards which
define the structure, format and content of the product.
Task .030 Conduct Quality Review
The Quality Review is to be conducted in a structured and formal manner.
Participants will fill the following roles:
Facilitator
- schedules and arrange review logistics,
- chairs the Quality Review,
- ensures successful execution of the Quality Review according to the
agenda,
Project Management Process
Project Management Process 59 of 86
- ensures that the appropriate followup action is taken,
- notifies the Stage Manager of the results,
- files the Quality Review Exception Item List in the Project Binder.
Reviewer
- identifies deficiences in the product in the light of their prepared
comments,
- does not suggest solutions in order to expedite the review.
Author
- presents the deliverable,
- provides clarification, but not to defend the product,
- understand identified deficiences,
- corrects the product after the Quality Review.
Documenter
- record identified deficiencies in the Quality Review Exception Item List
(Item #, Reviewer, Product Section, and a Comment on the deficiency).
At the end of the Quality Review the status of the product will be determined:"QR
Complete", whereby the product is complete and meets the prescribed quality
standard."QR Qualified & Complete", whereby some deficiencies have been
identified to be corrected, but does not require another formal Quality Review."QR
Qualified & In Progress", whereby the deficiencies are sufficiently numerous or
serious to warrant correction and another formal Quality Review.
Task .040 Follow-up Quality Review
For products with a status of:
"QR Complete", the Facilitator will notify the Stage Manager who will update the
product status from "In Progress" to "QR Complete".
"QR Qualified & Complete", the author will correct the product from the Quality
Review Exception Item List and annotated copies of the product. The author may
wish to discuss solutions with other individuals, including the reviewers. The author
will also update the Quality Review Exception Item List with the "Action" taken.
Upon completion the author will notify the Stage Manager who will update the
product status from "In Progress" to "QR Qualified & Complete".
"QR Qualified & In Progress", the Facilitator will notify the Stage Manager who will
update the product status from "In Progress" to "QR Qualified & In Progress". The
author will correct the product from the Quality Review Exception Item List and
Project Management Process
Project Management Process 60 of 86
annotated copies of the product, and schedule another Quality Review. The author
will also update the Quality Review Exception Item List with the "Action" taken.
Software Guidelines
Task .050 Review Quality Control Procedures
Review the Quality Review Procedures undertaken during the Stage. Verify that
the level of control is appropriate, that the quality objectives for each product are
appropriate and that all participants are satisfied both with the process and its
outcome.
Step 04: Progress Control
Description
Objective
To
- monitor and control progress on the project,
in a way that
- collects actual work and cost performance information,
- collects latest estimates to completion,
- compares actual performance with plan,
- determines the causes of the deviation,
- promotes replanning,
- identifies out of tolerance situations,
- involves all parts of the Project Organization,
so that
- the project work can be carried out as scheduled.
Overview
It is very unusual for any undertaking to go exactly to plan. Projects are no
exception. By the nature of a project, more information is being uncovered all the
time which can affect the progress of the project.
It is important to monitor the degree to which the plan is being followed, and to take
appropriate action if the project is deviating significantly from the plan.
The progress control procedures that are defined during the Project Initiation stage
form the basis of the progress control during project stages. These procedures
Project Management Process
Project Management Process 61 of 86
cover day to day progress tracking amongst the team, up to Project Board
reporting.
Checkpoints are held throughout the project at weekly intervals and provide the
mechanism for monitoring and controlling the day to day work on the project.
Performance information is captured and plans are updated prior to the Project
Status meeting. This enables the meeting to concentrate on determining what to
do next.
Defining the control procedures includes the setting of tolerance levels for project
performance.
When the stage tolerance is exceeded, the Stage Manager should carry out the
tasks in the Exception Situation step, to regain control of the project.
Task .010 Capture Performance
Create the timesheets and distribute to the project team members at the beginning
of the checkpoint cycle.
Capture from each team member the following:
- actual start date for tasks started this period,
- actual finish date for tasks finished this period,
- actual work (effort) in hours per task this period,
- latest estimated work in hours to complete the task,
- latest estimated elapsed time (duration) in hours to complete the task.
Capture any non-staff costs incurred this period.
Software Guidelines
Task .020 Update Schedule
Update the schedule by task by resource for the following:
- actual start date for tasks started this period,
- actual finish date for tasks finished this period,
- actual work (effort) in hours per task this period,
- latest estimated work in hours to complete the task.
Manually compare the rescheduled completion dates with the latest estimated
elapsed time to complete. In order to make the scheduler recalculate an end date
compatible with the estimated elapsed time to complete it may be necessary to
revise the resource unit value or resource calender; e.g. A resource is assigned
50% to a task and the estimated work to complete is 3 days. The scheduler will
recalculate the end date to be 6 working days hence. However, the resource has
stated that the elapsed time to complete is 10 days because of a training class.
Project Management Process
Project Management Process 62 of 86
In this example, update the resource calender to remove the 4 days of the class
from the calculation.
Software Guidelines
Task .030 Update Costs
Update the Stage Cost Summary worksheet with:
- actual costs incurred this period,
- estimated remaining costs.
Staff costs will be automatically updated from the scheduler, since they are
calculated from actual work.
Non-staff costs (Hardware & Network, Software, Project Training, Installation
Training and Miscellaneous items) will be updated directly in the Stage Cost
Summary worksheet. In practice it is expected that these non-staff costs will be
maintained at a stage level, rather than by checkpoint.
Software Guidelines
Task .040 Replan Stage Schedule
Review the Tracking Gantt and Cost Workbook and identify any deviation from the
baseline. Establish why the deviation has occurred. Refer back to the Project
Control Factors to help determine the appropriate corrective action and adjust the
schedule accordingly. Actions include:
- do nothing,
- accept a date slippage, within the project tolerance levels,
- adjust staff availablity,
- reassign staff,
- assign additional resources,
- coach and motivate the staff to work more effectively,
- resolve scheduling conflicts,
- expedite fuller client participation
- reduce the number of tasks,
- substitute tasks.
Determine if the stage has exceeded the progress, cost and quality tolerance
levels agreed with the Project Board. If the stage is out of tolerance then execute
the tasks in the Exception Management step to regain control of the project.
Project Management Process
Project Management Process 63 of 86
Review status of open issues and determine any further action required on these
issues.
Review the status of any outstanding quality reviews.
Review any new Change Requests.
Revise the schedule.
Software Guidelines
Task .050 Conduct Team Status Review
Conduct a Status Meeting with the Project Team.
It is beneficial to conduct the Status Meeting according to a formal standard
agenda.
Items for discussion are:
- achievements this period,
- planned activities that are incompleted or overdue,
- activities for the next period,
- new issues identified this period,
- issues closed this period,
- summary of results of quality reviews,
- summary of schedule and cost status,
- suggested revisions to the plan,
The Status Meeting is an opportunity to exchange information between all
members of the Project Team.
Task .060 Create Status Report
The Status Report provides a record of current achievements and immediate
expectations of the project. It provides an accurate history of the project,
effectively communicates to all interested parties the current status of the project,
and integrates progress tracking, change control and issue management.
Create the weekly Status Report. List:
- accomplishments this period,
- items not completed this period,
- proposed activities for the next period,
- reference new issues identified this period from the Project Issues Log,
Project Management Process
Project Management Process 64 of 86
- reference any issues resolved this period from the Project Issues Log,
- identify any predicted slippage to the stage schedule, along with cause
and corrective action,
- identify any predicted cost overrun, along with cause and corrective
action.
Distribute to the Project Team and the development Manager directly responsible
for the Project Manager.
Retain an electronic and paper copy of the Status Report.
Task .070 Update Stage Schedule
Following to the Status Meeting make any additional adjustments to the schedule
and Stage Cost Summary worksheet.
Software Guidelines
Task .080 Create Flash Report
Create the Flash Report at the end of the month.
Summarize the accomplishments for the month, schedule status, upcoming tasks
for the month, and any major issues.
Distribute to the Project Team and Project Board.
Retain an electronic and paper copy of the Flash Report.
Step 05: Change Control
Description
Objective
To
- control the addition of work to the stage activities,
in a way that
- assesses the value of the change request,
- presents alternative solutions,
- assesses the impact of the alternative solutions,
- records all change requests and resulting actions,
- enables changes to completed products,
Project Management Process
Project Management Process 65 of 86
so that
- the Stage Managers and Project Board can make controlled changes to
projectscope, schedule and cost.
Overview
As a project progresses, the people involved with the project develop a better
understanding of what the end product should be and what they need to do to
produce the product. This increased understanding manifests itself as changes to
the stage activities, and changes to the products. This will disrupt:
- project and stage schedules,
- project and stage costs,
- project scope,
Such changes cannot always be avoided, but their impact can be predicted and
controlled.
Change requests may come from a variety of sources but they wil require Project
Board sponsorship to be processed. The originator will describe the change
request and provide a justification.
Alternative solutions, and their respective impacts on the project, will be identified
and a recommendation made.
The recommendation will be presented to the Project Board who will decide
whether to accept it or make an alternative recommendation.
Task .010 Request Change
This is a formal request from either a member of the project team, a client, a
coordinator or Key Stakeholder to make a change to the project scope or
functionality. The originator must obtain sponsorship from a Project Board member
for the proposed change request.
The proposed change request will be submitted on a Change Request Form by the
originator. Before it can be accepted as a proposed change request the originator
must complete the following information:
- Request Title,
- Originator's Name,
- Originator's Phone/Email/Mailstop,
- Sponsor's name,
- Description, of the proposed change,
- Justification, for the change, with quantified benefits,
Project Management Process
Project Management Process 66 of 86
- Originator's priority.
The Stage Manager will review the change request and assign it to someone to
investigate alternative solutions.
The Stage Manager will update the Change Request Form:
- assign a unique Change Request #,
- update the Request Date,
- set status to "Open",
- update "Assigned To" and "Response Date".
The Stage Manager will update the Change Request Log.
Task .020 Identify Alternative Solutions
Evaluate the change request and identify several alternative solutions.
Assess the impact of each solution on:
- Functional Scope, including baselined products, tasks in progress and
future tasks,
- Schedule,
- Effort,
- Cost.
One solution may be to reject the change request.
If a solution will force the stage out of tolerance, explicitly state this on the Change
Request Form.
Make a recommendation.
Update the Change Request Form with the alternative solutions, their respective
impacts, and the recommendation.
Task .030 Decide Change Actions
Present the change request, alternative solutions and recommendation to the
Project Board.
The Project Board is required to either accept the recommendation, chose an
alternative solution, or request further investigation.
Update the Change Request Form:
- update "Action", "Authorized By" and "Authorization Date".
- set status to "Close"
Project Management Process
Project Management Process 67 of 86
Change Log:
- update "Status" and "Close Date".
If the Project Board requests further investigation then the Change Request
remains open.
Notify the originator of action.
If the chosen solution will cause the stage to exceed the tolerance limits then the
Project Board may require the Stage Manager to produce an Exception Situation
Report which will replace the Stage Plan.
Task .040 Implement Change
Make appropriate schedule and other project plan adjustments and communicate
these to team members impacted. Include activities to monitor progress and
execute quality control on the changes.
Step 06: Issues Management
Description
Objective
To
- resolve issues affecting the success of the project,
in a way that
- identifies issues affecting the project,
- assesses the extent to which issues affect the project,
- identifies actions to resolve issues,
- involves the appropriate level of management to make decisions on
issues,
- tracks progress on issues,
so that
- the project can be carried out as planned.
Overview
There will always be issues that arise during the course of a project. Some of
these issues may have a bearing on the project, and some will be of little
consequence.
Project Management Process
Project Management Process 68 of 86
Issues can arise from within the Project Organization and from the environment that
impacts the project.
Any issues that arise should be evaluated and dealt with as efficiently and
effectively as possible.
An issue can often linger on, even after it has supposedly been resolved, so it is
important to track issues to complete resolution.
Task .010 Identify Project Issue
Identify and describe an issue that is thought to affect the project. Determine
whether to pursue the issue and, if any further research is required before
assessing the issue, assign someone to research the issue.
Update Issue Log as follows:
- Assign a unique Issue No.
- Issue Title
- Type
- Internal, where the issue can be resolved by the project team.
- External, which cannot be resolved by the project team, but
requires client or Project Board resolution.
- Priority
- 0 irrelevant, since it does not impact the project in any way,
- 1 low, whereby the unresolved issue will not impact current stage
schedule,
- 2 medium, whereby the issue will impact the stage schedule if
not resolved within four weeks,
- 3 stage stopper, whereby the issue must be resolved for work to
continue on the current stage,
- 4 project stopper, whereby the issue must be resolved by the end
of the stage for work to continue on the project.
- Originator's Name
- Assigned To
- Response Date
- Status (Open or Closed)
Forward the issue to the appropriate team member, client, coordinator or Project
Board member for assessment and recommended resolution.
Project Management Process
Project Management Process 69 of 86
Task .020 Assess Impact of Issue
Consider the potential impact of the issue on the project:
- what happens if the issue is not actioned?
- will it impact project scope?
- will it impact the quality of the final product?
- will it cause the project to go out of tolerance?
- will it impact resource usage?
- will it change the project benefits?
- will it increase project risk?
Determine how the issue might be resolved.
Update the Issue Log with the recommended "Resolution".
Task .030 Resolve Issue
Determine whether the to accept the recommended resolution.
If the recommendation is accepted, and no additional effort is required, execute the
resolution. Set Issue status to "Closed". Update Close Date.
If additional effort is required to execute the recommended resolution, create a
Change Request. Set Issue status to "Closed".
If the recommendation is unacceptable, then determine next steps. Issue status
remains "Open".
Step 07: Exception Situation
Description
Objective
To
- take corrective action when a project is off course,
in a way that
- minimizes impact to the project,
- gains agreement from all parts of the Project Organization,
so that
- the project can still be successfully completed.
Project Management Process
Project Management Process 70 of 86
Overview
The Project Initiation Report defines the project tolerances with respect to:
- cost,
- schedule,
- quality.
During the lifetime of a project it is possible that:
- a stage tolerance set by the Project Board is or will be exceeded,
- a major technical deviation is identified and recorded,
- an important dependency from another project is not available.
Their effect is that the current Stage Plan will not be met and so the Stage must be
replanned in the light of the new situation. This is done by preparing an Exception
Report.
An Exception Report serves the essential purposes of any plan; it must contain all
the information normally given in Stage plans since, after approval, it will replace
the current Stage Plan. In addition it shows the effect on the project of exceptional
situations; for this reason the exception plan includes information on the exception
that has arisen, the options that have been examined and the action that it is
proposed to take.
In addition to the information contained in the Stage Plan, an Exception Report
contains the following:
- an explanation of why a given situation is an exception and the
circumstances that led to the situation,
- a prediction of the schedule, cost, schedule, functional, quality and
technical impact if no action is taken,
- the recommended recovery action (changes to scope, organization,
budget, timescale, etc),
- the consequences of this corrective action on both the Stage Plan and
the Project Plan,
- a recommendation.
The Exception Report is prepared by the Stage Manager and submitted to the
Project Board at a Mid Stage Assessment (MSA). Consideration should be given
to both the project objective statement and the original Control Factors when
considering recovery actions. If approved it becomes the effective plan for the
remainder of the stage.
Project Management Process
Project Management Process 71 of 86
Step 07: Exception Situation
Task .010 Analyze Cause of Exception Situation
Confirm which component of the project is out of tolerance. Ensure that the control
measuring the tolerance is functioning correctly.
Analyze the causes of the Exception Situation. These may include:
- resource utilization and availablity,
- resource productivity and performance,
- external factors,
- under estimating,
- scope creep,
- quality issues requiring the rework of products.
Assess the impact on the project of doing nothing, and continuing with the original
plan, with respect to:
- stage and project schedule,
- stage and project cost,
- scope,
- quality of development products,
- interproject dependencies, both business and technical projects.
Task .020 Create Exception Plan
Review, from the Project Initiation Report, the Project Objective Statement,
Measures of Project Success and the Control Factors. They will help to focus on
identifying the most effective changes.
Consider each aspect of the project, identify appropriate changes and define their
probable impact.
Dimension of Scope
- functional,
- organizational,
- data,
- performance requirements,
Project Management Process
Project Management Process 72 of 86
- implementation environment,
- development products.
Plan
- identify new tasks and products,
- modify original tasks and products,
- remove tasks and products,
- review resourcing,
- review workflow and task dependencies,
- re-estimate.
Organization
- review the effectiveness of the Project Board, Key Stakeholders, and
Project Coordinators.
Schedule
- Recreate the stage and project plans.
Cost
- Recreate the project budget.
Business Case
- Quantify the impact of the proposed changes on each benefit, and the on
the time to break even.
Risk
- Conduct a risk analysis.
- Identify new project risks and appropriate countermeasures.
If there is a single course of action, prepare the Exception Situation Report which
summarizes:
- the causes and impact of the Exception Situation,
- recommends recovery actions,
- assesses the impact of the recovery actions,
- creates an Exception Plan which replaces the original stage and project
plan.
Project Management Process
Project Management Process 73 of 86
If it is not clear what option should be taken, prepare an analysis of the options for
the Project Board together with an outline Exception Report for each option.
Task .030 Prepare for Exception Assessment
Arrange a project assessment meeting of the Project Board to decide what course
of action to take on the project.
Prepare an agenda and any presentation material that will be required to present
the Exception Report to the Project Board in order for them to make a decision.
Task .040 Conduct Exception Assessment
Conduct the Project Assessment meeting. The Project Board should make a
decision on how to proceed with the project, that the Stage Manager and Project
Team can follow.
Task .050 Follow-up Exception Assessment
Record the decision made by the Project Board and take the appropriate action.
In most cases, this will be a series of additional project activities that are required
to address the causes of the Exception Situation.
Execution of the Exception Plan may require invoking the Change Management
process.
Step 08: Stage End Assessment
Description
Objective
To
- document the results of the current stage and prepare for the next stage
and have the results reviewed by management,
in a way that
- provides a summary of the work carried out in the stage,
- identifies the tasks necessary to carry out the next stage of the project,
- develops a schedule for the next stage of the project,
- provides a comprehensive package of information from which a decision
can be made,
- gains agreement on any revisions to the scope of project,
- gains agreement on any revisions to the overall approach and schedule
for the project,
- gains agreement on any revisions to the Business Case for the project,
Project Management Process
Project Management Process 74 of 86
- gains agreement on any revisions to the Project Organization,
- gains commitment to making the necessary resources available for the
project,
- gains agreement to the approach and schedule for the next stage of the
project,
- gains agreement to any changes to the control procedures defined for
the project,
- provides a record of the project and stage plans for use in managing and
controlling the project if it gets authorization to proceed,
- confirms that the stage is complete,
so that
- a decision can be made as to whether to commit to and authorize the
project to proceed.
Overview
An Stage End Assessment should be held at the end of every stage in the project.
The Stage Manager and Project Team report their progress and recommendations
to the Project Board to gain the Board's approval to either to proceed with the next
stage, or to confirm that project has been satisfactorily completed. This
assessment reviews the overall progress of the project and the plan for continuing
the project.
In the same way that a detailed schedule for the next stage of the project is
developed in Project Initiation, a detailed schedule for the next stage of the project
is developed in every other stage, except the last.
The overall project schedule provides an overview of the activities in each stage.
These activities need to be further defined for the next stage to the point where all
necessary tasks have been identified. This should use the same approach as for
developing the overall project schedule. That is, using a proven process, or
developing the process if one does not exist.
Once this has been done it is necessary to estimate the resources required for the
next stage. This should cover all personnel resources required, both full and part
time, and other types of resource such as office space and equipment. A time line
and cost estimate for the stage can then be developed.
The work carried out in the stage is collated into a consistent document that
contains the work completed to date, plans for the Project as a whole, and plans
for the next project stage.
The revised Project Plan consists of an updated version of:
- Project Scope
Project Management Process
Project Management Process 75 of 86
- Overall Project Schedule
- Overall Budget for the Project.
- Project Organization
- Business Case for the project
- Standards and Control Procedures to be used on the project
The Plan for the next stage consists of:
- Stage Schedule
- Quality Review standards for next stage products
- Control Tolerances for the next stage
- Budget for the next stage.
Developing these plans will be an iterative process and may begin early during the
current stage.
A brief Stage End Report should also be produced which summarizes the work
carried out during the stage and contains recommendations to the Project Board.
By agreeing plans for the next stage, the Project Board are committing to the
provision of funding and other resources, and understanding and accepting the
assumptions, pre-requisites and risks. They must ensure that appropriate
Progress, Quality and Change Control procedures are being administered
effectively.
This approval also marks the formal delegation of responsibility to the next Stage
Manager for the achievement of stage products, within the time and budget, subject
to the agreed tolerance levels.
Task .010 Close Stage Administration
Ensure that all project management and development products produced in the
current stage are correctly filed.
Task .020 Determine Next Stage Activities
Based upon the project and stage objective, scope, constraints and assumptions,
tune the stage work breakdown structure to:
- Add new steps and/or tasks,
- Remove unnecessary steps and/or tasks,
- Merge steps and/or tasks,
The project plan identified the probable steps within the stage. Now is the
opportunity to reassess the steps and their associated objectives and products.
Removing steps and tasks may increase project risk. Document these risks and
Project Management Process
Project Management Process 76 of 86
identify proposed countermeasures, which may include additional quality
assurance tasks.
Determine the products to be produced by each step. Start at the end of the stage
with the final deliverable, and work forwards to the beginning. Describe the
objective, outline and content of each product. Validate the final product against
the project and stage objective.
Within each step, identify the tasks or activities required to produce the step
products. A task will have the following characteristics:
- Reference
- Name
- Description
- Input
- Output or product
- Technique (optional)
- Tool (optional)
- Role / responsibility assignment
- Resource / responsibility assignment
- Effort estimate
In this task define the Task Reference, Name, Description, Product, Techniques
and Tools.
Record all assumptions and issues identified.
Task .030 Determine Activity Dependencies
Chart the sequence of stages and steps to reflect the intrinsic and architectural
dependencies inherent in the project.
An output or product of one task will usually be the input to another, and this will
be the primary driver in determining the task dependencies and workflow.
Determine whether the successor task references (throughput) or updates (entry
requirement) the input product.
Some inputs may be sourced from outside the project. Identify these External
Inputs (e.g., Long Range System Plan, Standards, Project Initiation report of
another project, etc.).
Review the dependencies determined by the task inputs and outputs. Review the
dependency types between the tasks. Tasks are not necessarily finish-start, but
may be in parallel or phased. Where appropriate, define lags (both positive and
Project Management Process
Project Management Process 77 of 86
negative) between tasks. Remove any step dependencies. It is recommended that
the dependencies be kept simple and reduced to a minimum, otherwise the
schedule will be very difficult to execute and will probably be abandoned.
Ensure that all dependencies with other projects are identified. Examine other
Project Initiation Reports to assess interproject dependencies.
Record all assumptions and issues identified.
Task .040 Estimate Effort
Stage schedule estimates will be determined as effort time (or work). Determine
the total effort per task. Remember to include peer review and revision time if such
activities are not identified as specific tasks. It is recommended that you estimate
in units of an hour. Avoid estimating tasks to less than one hour. It is advisable to
estimate in units of 4 hours. No task should be longer than 80 hours.
By combining small tasks and including a detailed description of the task it will be
possible to simplify the schedule merely by reducing the number of tasks in the
Gantt.
The task effort estimates will be apportioned to individual roles and resources in the
next task.
Record all assumptions supporting the estimate in the task description. This is
very important because it will enable you to recreate and substantiate the estimate.
It will also ensure that you have thoroughly thoughout what is to be done, and that
it is communicated clearly to the Team. Estimating takes time, but it will validate
the tasks, products, techniques and assumptions.
Aggregate the task estimates and compare against the original top-down step and
stage estimates. If the detailed estimate is substantially different from the original
top-down estimate it may be necessary to refer to the Project Board and consider
revising both the project and stage plans.
Task .050 Allocate Resources
Assign roles and their associated responsibility to each task. In order to avoid
overwhelming the plan with complexity focus on the "produce", "consult" and
"review" responsibilities. The "approve" responsibility will generally apply only to
the Project Board. The responsibilities are defined as follows:
- Produce: to create the product of the task. Usually applies to Project
Team Members like Business Analysts, Systems Analysts and
Programmers. The schedule will be simpler to balance if only a single
role is assigned per task.
- Consult: provide information required to produce the task. Usually
applies Coordinators and Key Resources.
- Review: review the product for correctness, accuracy and completeness.
Usually applies Coordinators and Key Resources.
- Approve: official signoff. Usually applies to the Project Board.
Project Management Process
Project Management Process 78 of 86
Assign resources to the roles and responsibilities.
Apportion the total task effort estimate to the resources. As a tip, the schedule will
be much easier to balance if the task effort estimate is apportioned entirely to the a
single "produce" resource. Therefore this estimate should include time for the
other "consult" and "review" resources, e.g., Client review, DBA review. Although
this is a simplification, it is still applicable if the non-project team costs are
excluded from the plan, since the estimates are primarily for the Project Team.
The "consult", "review" and "approve" resources still need to be assigned to tasks,
albeit at zero work, in order for them to be included in the schedule.
Define by task the resources availability (unit). The scheduler will calculate task
duration as effort / unit.
Task .060 Prepare Next Stage Schedule
Develop an initial schedule of project activities.
Determine the proposed stage start date and use the scheduler to calculate the
step and task start and end dates. Validate these dates against the project
constraints.
Review the project objective, constraints and control factors before attempting to
balance the plan. Deadline, resource utilization and costs can be adjusted as
follows:
- Modify dependencies,
- Modify dependency type (finish-start, lag, etc.),
- Modify tasks and therefore the effort estimate (avoid arbitarily reducing
estimates),
- Assign more resources (task duration will theoretically be reduced if
more resources are applied to the task),
- Reassign more proficient resources,
- Provide productivity enhancing tools,
- Train and coach team members,
- Motivate team members,
- Increase resource availability,
Modify task descriptions and assumptions to record all the adjustments to the
plan. Failure to do this will result in a mismatch between the original plan and the
current schedule, and reduce the probability of project success.
Task .070 Prepare Next Stage Budget
Determine staff costs at the task level. This is a function of the resource work and
chargeable rate. The Process Manager will supply standard hourly rates for both
Internal Staff and External Contractors.
Project Management Process
Project Management Process 79 of 86
Determine non-staff costs for the stage by category. The categories are:
- Hardware & Network
- Software
- Project Training, training the project team to execute the project
- Installation Training, training the clients, operations, etc. to use the
application
- Miscellaneous, includes supplies, copying of training materials,
accommodation, subsistence, travel, or other costs which cannot be
classified above.
Task .080 Baseline Next Stage Schedule
Once a satisfactory balanced stage schedule and budget has been achieved,
baseline it. This will retain a record of the original start and end dates, work and
duration estimates, and staffing costs
Actual progress will be monitored against this baseline.
Task .090 Update Project Schedule
Update the overall Project Schedule to reflect the details of the Next Stage
Schedule.
Task .0100 Review Project Budget
Review the overall Project Budget, and make changes based on the latest Project
Schedule
Task .0110 Review Business Case
Update the Business Case to reflect any changes in Costs, Benefits and Risks for
the project.
Task .0120 Review Project Organization
Review the resource requirements from the Next Stage Schedule and update the
Project Organization accordingly.
Task .0130 Review Project Scope
Review the latest statement of the Project Scope and ensure that it still accurately
reflects the current status and plans for the project.
If the Project Scope is subject to Change Control, it should be up to date.
Task .0140 Compile Stage End Assessment Report
Collate all the elements of the project and next stage plans into a single document
for review by the Project Board.
Project Management Process
Project Management Process 80 of 86
Summarize the achievements of the preceding stage, highlighting any issues
concerning quality, cost, resource utilization, schedule, etc.
Verify that the project objective, scope, approach, products, organization, control
factors, cost justification and risk are still valid. Highlight any changes.
Task .0150 Prepare Stage End Assessment
Decide what decisions the Project Board must make. These will cover issues that
have arisen during the previous stage, and the decision on how to proceed with the
project.
Determine the recommendations to be made to the Project Board concerning those
decisions. If the development Stage Manager and the Client Co-ordinator disagree,
then record both with supporting arguments.
Determine the information the Project Board needs to make the decisions.
Determine the best way to provide that information to the Project Board.
Prepare advance material for the Project Board.
Arrange and schedule a Project Board meeting and send out the advance material.
Prepare a structured agenda for the Project Board meeting.
Prepare a brief report covering the work carried out during the stage.
Task .0160 Conduct Stage End Assessment
Follow the prepared agenda and present the results of the stage to the Project
Board.
Make a recommendation to the Project Board and ensure the Project Board makes
a decision.
Task .0170 Follow-up Stage End Assessment
Update the Project and Stage Plans based on the decisions made by the Project
Board.
Create a Stage End Approval Report and obtain Project Board signatories. Record
any qualifications.
Project Management Process
Project Management Process 81 of 86
Project Closure
Objective
To
- formally close the project,
in a way that
- establishes mechanisms for the continued development or improvement
of the final product of the project,
- improves the standard process for this type of project,
- updates the estimating model for this type of project,
so that
- the project resources can be re-deployed.
Overview
All good things must come to an end. Projects are designed to end at some point,
that is the nature of project work. To gain maximum benefit from a project, the
project should go through a formal close down.
There may be some outstanding work that needs to be carried out on the products
of the project. This work should either be canceled, or mechanisms, such as a
maintenance program, or additional projects, should be established to complete
the work.
The project will have been using several lists and tracking mechanisms, such as
the change request log and the issues log. These need to be formally closed.
The members of the Project Organization will have learnt how to carry out this type
of project better in the future, and will have a better idea of how long the various
activities on this type of project will take to do. These learnings should be captured
for future use.
There will be a lot of information generated during a project, and this will have been
stored with varying degrees of formality by the members of the Project
Organization. This information needs to be formally filed away for possible future
use.
Step 01: Final Product Evaluation
Description
Objective
Project Management Process
Project Management Process 82 of 86
To
- determine the overall quality of the final product and to implement a
mechanism for improving or maintaining that quality,
in a way that
- evaluates the product against the original objectives identifies outages in
the final product determines how to address any outages,
so that
- the overall project objectives can be met.
Overview
By this time in the project, all project work should have been completed, and the
products of the project should have been accepted by the customers. It is possible
however, that the final products do not fully meet the original objectives and
requirements.
Before the project is completely finished, any outages in the products should be
identified and evaluated. If it is decided that the outages need to be fixed, it will be
necessary to set up a mechanism to carry this out. This may be by a new project,
or a maintenance program.
If the product fully meets the original objectives and requirements, it is still
necessary to consider how to maintain the product.
Task .010 Prepare Product Evaluation
Determine what form the final evaluation of the product should take. It could be:
- a meeting
- a quality review
- a questionnaire
Make sure that the evaluation includes an evaluation against the Business
Success Criteria that were defined during the Project Initiation Stage. However, it is
also important to evaluate the overall quality of the final product in respect of its
ability to meet current requirements.
Prepare and distribute material as appropriate.
Task .020 Conduct Product Evaluation
Carry out the evaluation in the chosen way.
Determine if the project has been successful in relation to the original Business
Success Criteria.
Determine if the product does meet all requirements. If the product does not meet
requirements, identify the shortcomings and record them.
Project Management Process
Project Management Process 83 of 86
Determine if any of the shortcomings with the final product need to be addressed. If
there are any items that need action, decide on the best way of addressing the
items. Options include:
- do not close the project
- define a follow-on project
- initiate a maintenance process
Task .030 Initiate Maintenance Process
If there is a need for on-going maintenance of the final product, a maintenance
process should be initiated.
If the organization does not have a maintenance process, this should be
established. This should be a formal defined process, that involves business and
technical staff in the identification, approval for work, carrying out the work and
quality control of work.
There may be some maintenance work already identified, and this work should go
through the defined maintenance process.
Step 02: Project Completion
Description
Objective
To
- complete all outstanding project work,
in a way that
- reviews outstanding project items,
- resolves outstanding project items,
so that
- the project can be formally closed.
Overview
The project will have been using a number of control procedures that produce logs
of change requests and issues.
The logs need to be reviewed for a last time, To make sure that all items have been
closed. If any items have not been closed, they should be evaluated to see if they
still have a bearing on the final product. The items that are still open should then
be closed or resolved. As a last resort, if there is a follow on project or
maintenance program, the outstanding items should be passed on to the person
responsible for the subsequent work.
Project Management Process
Project Management Process 84 of 86
It is possible that some activities were not completed on the project. The final
commitment plan should be reviewed and any items that are still not complete
should be identified. Any uncompleted activities should be treated in the same
way as unresolved change requests or issues.
The best way to carry out this work is to have a final meeting of the project team
and any other members of the Project Organization that are necessary to make
decisions on the outstanding items.
Step 02: Project Completion
Task .010 Close Outstanding Project Work
Review the Change Control log and close any outstanding items.
Review the Issue Log and close any outstanding items.
Review the quality control log and close any outstanding items from completed
quality reviews.
The project logs may be closed by transferring the items to a follow on project or to
the maintenance process.
Produce personal assessments for all project team members.
Close and store project files. This may require forwarding some documents to other
parts of the company (e.g. contracts correspondence).
Prepare a report on the final actions taken, for approval in the Project Closure
Meeting.
Task .020 Prepare for Project Closure Meeting
Determine what needs to be accomplished in the Project Closure Meeting and
decide who should attend.
Arrange and schedule the Project Closure Meeting.
Produce and circulate pre-meeting material (meeting notification, any required
reading).
Produce outline project closure report for review at the closure meeting.
Task .030 Conduct Project Closure Meeting
Carry out the Project Closure Meeting in the agreed way.
Gain approval on closure actions.
Task .040 Follow Up Project Closure Meeting
Revise the closure actions if they were not approved in the Project Closure
Meeting.
Project Management Process
Project Management Process 85 of 86
Step 03: Process Improvement
Description
Objective
To
- review and update the process used by the project,
in a way that
- involves both technical and business staff,
- covers the project process, techniques and organization,
- identifies things that worked well,
- identifies things that didn't work,
- identifies things were not necessary,
- identifies additional things that were necessary,
- improves the estimating model for the process,
so that
- the organization can learn from this project and make similar future
projects more successful.
Overview
This is the final step in any quality process. This step evaluates the process itself
and identifies any learnings from the project. If these learnings are likely to apply
to future projects of the same type, the project process is updated to reflect what
has been learned.
Task .010 Prepare End of Project Review
Determine what form the final review of the project should take. It could be:
- a meeting
- a facilitated workshop
- a questionnaire
The review should involve all parts of the Project Organization. It may also involve
other staff and customers of, and suppliers to, the project.
Prepare and distribute material as appropriate to the people involved in the review.
Task .020 Conduct End of Project Review
Project Management Process
Project Management Process 86 of 86
Carry out the review in the chosen way.
Record recommended changes to the process and estimating model.
Task .030 Update Process Metrics
Review the recommended changes to the estimating model.
Assess each change and decide if it is likely to apply to future projects of this
type. Change the estimating model based on these decisions.
Task .040 Implement Process Improvement
Review the recommended changes to the standard process used on the project.
Assess each change and decide if it is likely to apply to future projects of this
type. Change the standard process based on these decisions.

Project Management Process的更多相关文章

  1. The Simplified Project Management Process

    One of the challenges of explaining project management to people who are unfamiliar with the approac ...

  2. Introduction to Project Management&lpar;II&rpar;

    Introduction The purpose of this paper is to gain an understanding of project management and to give ...

  3. Introduction to Project Management&lpar;I&rpar;

    Project management in the modern sense began in the early 1950s, although it has its roots further b ...

  4. 【转】bug management process

    What is Bug? A bug is the consequence/outcome of a coding fault What is Defect? A defect is a variat ...

  5. 简介 - PMP&lpar;Project Management Professional&rpar;

    PMP(Project Management Professional) 官网(英文报名):https://www.pmi.org/ 中文注册:http://exam.chinapmp.cn/ Boo ...

  6. 10 Rules of Highly Successful Project Management

    I commited the information below to report PDU of PMI. ^_^. In this paper, the author introduces his ...

  7. Software Engineering&colon; 2&period; Project management

    resources:"Software Engineering" Ian Sommerville For most projects, important goals are: D ...

  8. Software Project Management hw1

    I just want to say something about my java project that I did last year. Our task is to finish a lin ...

  9. Linux Process Management &amp&semi;&amp&semi; Process Scheduling Principle

    目录 . 引言 . 进程优先级 . 进程的生命周 . 进程表示 . 进程管理相关的系统调用 . 进程调度 . 完全公平调度类 . 实时调度类 . 调度器增强 . 小结 1. 引言 在多处理器系统中,可 ...

随机推荐

  1. 【原作】关于Dynpro中的红绿灯显示

    问题源自李宁的需求,就不说了. 关于ABAP中的红绿灯网上也有很多资料,不过貌似都是ABAP的程序,没怎么注意.后来根据需求要在Dynpro上也做出那样的效果,所以,研究了一下. 这种红绿灯在ABAP ...

  2. 在ubuntu中安装psutil

    环境:ubuntu 16.04 LTS + python 2.7/3.5共存 + psutil 4.3.0 1.sudo apt-get install python3-dev # 先把python3 ...

  3. nw&period;js如何处理拖放操作

    nw.js如何处理拖放操作 其实拖放(drag-drop)操作是Html5的功能,不是nw.js的内置API,那么我们采用Html5应用一般的处理方法就可以了. 首先我们看一下一个正常的页面,直接拖放 ...

  4. ODI中显示us7ascii字符集的测试

    安装oracle DB时,选择的字符集:美国.英语.US7ASCII. 在不设置nls_lang的情况,插入中文,成功,但存进去的是乱码,select看到也是??(无论后面再怎么设置nls_lang) ...

  5. MySQL表名、列名区分大小写详解

    前言:出现的问题 在本地数据库上执行修改银行卡没有报错 但线上执行报错 发现是表找不到,发现表名不对应该是card_cardinfo,但本地上没有问题,能正常修改,然后在数据库里测试,发现本地库(wi ...

  6. python 实现对象模型

    # -*- coding:utf-8 -*- """ python 实现对象模型 创建 bmicalcpage 类 """ class bm ...

  7. 常用的SQL数据库语句总结

    1as 的用处 as可以对表和列取别名 在开发过程中经常遇到开始给某一个的字段去field1的名称,但后来有感觉field1字段指定不确切,于是又把此字段改成了field2,由于开始认 为field1 ...

  8. PHP 重载 &lowbar;&lowbar;call&lpar;&rpar; &lowbar;callStatic方法

    在C++和java中,可以函数参数的个数或类型来进行重载.但php是弱类型的语言,无法采用传统的方法.若下面这样: class Person{ function fun1($a) { echo 'fu ...

  9. oracle 11g 基于磁盘的备份rman duplicate

    基于磁盘的备份rman duplicate 命令创建standby database 前提条件: 确保原始库数据库的备份.存档standby 结束是完全可见, 这里,如果原始文库和靶 - 侧数据文件, ...

  10. AngularJS进阶&lpar;十二&rpar;AngularJS常用知识汇总&lpar;不断更新中&period;&period;&period;&period;&rpar;

    AngularJS常用知识汇总(不断更新中....) 注:请点击此处进行充电! app.controller('editCtrl',['$http','$location','$rootScope', ...