In C#, how can I calculate the number of business (or weekdays) days between two dates?
在c#中,我如何计算两个日期之间的业务(或工作日)天数?
24 个解决方案
#1
98
I've had such a task before and I've got the solution. I would avoid enumerating all days in between when it's avoidable, which is the case here. I don't even mention creating a bunch of DateTime instances, as I saw in one of the answers above. This is really waste of processing power. Especially in the real world situation, when you have to examine time intervals of several months. See my code, with comments, below.
我以前有过这样的任务,我有解决办法。我要避免在可以避免的情况下列举所有的日子,这就是我要说的。我甚至没有提到创建一些DateTime实例,正如我在上面的一个答案中所看到的。这真是浪费了处理能力。特别是在现实世界中,当你需要检查几个月的时间间隔时。查看我的代码,下面是注释。
/// <summary>
/// Calculates number of business days, taking into account:
/// - weekends (Saturdays and Sundays)
/// - bank holidays in the middle of the week
/// </summary>
/// <param name="firstDay">First day in the time interval</param>
/// <param name="lastDay">Last day in the time interval</param>
/// <param name="bankHolidays">List of bank holidays excluding weekends</param>
/// <returns>Number of business days during the 'span'</returns>
public static int BusinessDaysUntil(this DateTime firstDay, DateTime lastDay, params DateTime[] bankHolidays)
{
firstDay = firstDay.Date;
lastDay = lastDay.Date;
if (firstDay > lastDay)
throw new ArgumentException("Incorrect last day " + lastDay);
TimeSpan span = lastDay - firstDay;
int businessDays = span.Days + 1;
int fullWeekCount = businessDays / 7;
// find out if there are weekends during the time exceedng the full weeks
if (businessDays > fullWeekCount*7)
{
// we are here to find out if there is a 1-day or 2-days weekend
// in the time interval remaining after subtracting the complete weeks
int firstDayOfWeek = (int) firstDay.DayOfWeek;
int lastDayOfWeek = (int) lastDay.DayOfWeek;
if (lastDayOfWeek < firstDayOfWeek)
lastDayOfWeek += 7;
if (firstDayOfWeek <= 6)
{
if (lastDayOfWeek >= 7)// Both Saturday and Sunday are in the remaining time interval
businessDays -= 2;
else if (lastDayOfWeek >= 6)// Only Saturday is in the remaining time interval
businessDays -= 1;
}
else if (firstDayOfWeek <= 7 && lastDayOfWeek >= 7)// Only Sunday is in the remaining time interval
businessDays -= 1;
}
// subtract the weekends during the full weeks in the interval
businessDays -= fullWeekCount + fullWeekCount;
// subtract the number of bank holidays during the time interval
foreach (DateTime bankHoliday in bankHolidays)
{
DateTime bh = bankHoliday.Date;
if (firstDay <= bh && bh <= lastDay)
--businessDays;
}
return businessDays;
}
Edit by Slauma, August 2011
由Slauma编辑,2011年8月。
Great answer! There is little bug though. I take the freedom to edit this answer since the answerer is absent since 2009.
很棒的回答!不过也有小错误。自从2009年以来,我一直没有回答这个问题,所以我可以*地编辑这个答案。
The code above assumes that DayOfWeek.Sunday
has the value 7
which is not the case. The value is actually 0
. It leads to a wrong calculation if for example firstDay
and lastDay
are both the same Sunday. The method returns 1
in this case but it should be 0
.
上面的代码假设是在那天。周日的值是7,而不是这个情况。这个值实际上是0。如果第一天和最后一天都是同一个星期天,那就会导致错误的计算。这个方法返回1,但它应该是0。
Easiest fix for this bug: Replace in the code above the lines where firstDayOfWeek
and lastDayOfWeek
are declared by the following:
最简单的解决方法是:将代码替换为第一天和最后一周的第一天和最后一周的代码:
int firstDayOfWeek = firstDay.DayOfWeek == DayOfWeek.Sunday
? 7 : (int)firstDay.DayOfWeek;
int lastDayOfWeek = lastDay.DayOfWeek == DayOfWeek.Sunday
? 7 : (int)lastDay.DayOfWeek;
Now the result is:
现在的结果是:
- Friday to Friday -> 1
- 周五至周五-> 1。
- Saturday to Saturday -> 0
- 周六到周六-> 0。
- Sunday to Sunday -> 0
- 周日到周日->。
- Friday to Saturday -> 1
- 周五到周六-> 1。
- Friday to Sunday -> 1
- 周五至周日-> 1。
- Friday to Monday -> 2
- 周五到周一-> 2。
- Saturday to Monday -> 1
- 周六至周一-> 1。
- Sunday to Monday -> 1
- 周日至周一-> 1。
- Monday to Monday -> 1
- 周一至周一-> 1。
#2
72
Ok. I think it's time to post the right answer:
好的。我认为是时候公布正确答案了:
public static double GetBusinessDays(DateTime startD, DateTime endD)
{
double calcBusinessDays =
1 + ((endD - startD).TotalDays * 5 -
(startD.DayOfWeek - endD.DayOfWeek) * 2) / 7;
if (endD.DayOfWeek == DayOfWeek.Saturday) calcBusinessDays--;
if (startD.DayOfWeek == DayOfWeek.Sunday) calcBusinessDays--;
return calcBusinessDays;
}
Original Source:
原始资料来源:
http://alecpojidaev.wordpress.com/2009/10/29/work-days-calculation-with-c/
http://alecpojidaev.wordpress.com/2009/10/29/work-days-calculation-with-c/
P.S. Solutions posted above making me sic for some reason.
P.S.的解决方案让我有了一些理由。
#3
33
I know this question is already solved, but I thought I could provide a more straightforward-looking answer that may help other visitors in the future.
我知道这个问题已经解决了,但是我想我可以提供一个更直观的答案,可以帮助未来的其他游客。
Here's my take at it:
这是我的看法:
public int GetWorkingDays(DateTime from, DateTime to)
{
var dayDifference = (int)to.Subtract(from).TotalDays;
return Enumerable
.Range(1, dayDifference)
.Select(x => from.AddDays(x))
.Count(x => x.DayOfWeek != DayOfWeek.Saturday && x.DayOfWeek != DayOfWeek.Sunday);
}
This was my original submission:
这是我最初的作品:
public int GetWorkingDays(DateTime from, DateTime to)
{
var totalDays = 0;
for (var date = from; date < to; date = date.AddDays(1))
{
if (date.DayOfWeek != DayOfWeek.Saturday
&& date.DayOfWeek != DayOfWeek.Sunday)
totalDays++;
}
return totalDays;
}
#4
21
Define an Extension Method on DateTime like so:
在DateTime上定义一个扩展方法:
public static class DateTimeExtensions
{
public static bool IsWorkingDay(this DateTime date)
{
return date.DayOfWeek != DayOfWeek.Saturday
&& date.DayOfWeek != DayOfWeek.Sunday;
}
}
Then, use is within a Where clause to filter a broader list of dates:
然后,使用在Where子句中筛选更广泛的日期列表:
var allDates = GetDates(); // method which returns a list of dates
// filter dates by working day's
var countOfWorkDays = allDates
.Where(day => day.IsWorkingDay())
.Count() ;
#5
9
I used the following code to also take in to account bank holidays:
我用下面的代码也考虑到银行假期:
public class WorkingDays
{
public List<DateTime> GetHolidays()
{
var client = new WebClient();
var json = client.DownloadString("https://www.gov.uk/bank-holidays.json");
var js = new JavaScriptSerializer();
var holidays = js.Deserialize <Dictionary<string, Holidays>>(json);
return holidays["england-and-wales"].events.Select(d => d.date).ToList();
}
public int GetWorkingDays(DateTime from, DateTime to)
{
var totalDays = 0;
var holidays = GetHolidays();
for (var date = from.AddDays(1); date <= to; date = date.AddDays(1))
{
if (date.DayOfWeek != DayOfWeek.Saturday
&& date.DayOfWeek != DayOfWeek.Sunday
&& !holidays.Contains(date))
totalDays++;
}
return totalDays;
}
}
public class Holidays
{
public string division { get; set; }
public List<Event> events { get; set; }
}
public class Event
{
public DateTime date { get; set; }
public string notes { get; set; }
public string title { get; set; }
}
And Unit Tests:
和单元测试:
[TestClass]
public class WorkingDays
{
[TestMethod]
public void SameDayIsZero()
{
var service = new WorkingDays();
var from = new DateTime(2013, 8, 12);
Assert.AreEqual(0, service.GetWorkingDays(from, from));
}
[TestMethod]
public void CalculateDaysInWorkingWeek()
{
var service = new WorkingDays();
var from = new DateTime(2013, 8, 12);
var to = new DateTime(2013, 8, 16);
Assert.AreEqual(4, service.GetWorkingDays(from, to), "Mon - Fri = 4");
Assert.AreEqual(1, service.GetWorkingDays(from, new DateTime(2013, 8, 13)), "Mon - Tues = 1");
}
[TestMethod]
public void NotIncludeWeekends()
{
var service = new WorkingDays();
var from = new DateTime(2013, 8, 9);
var to = new DateTime(2013, 8, 16);
Assert.AreEqual(5, service.GetWorkingDays(from, to), "Fri - Fri = 5");
Assert.AreEqual(2, service.GetWorkingDays(from, new DateTime(2013, 8, 13)), "Fri - Tues = 2");
Assert.AreEqual(1, service.GetWorkingDays(from, new DateTime(2013, 8, 12)), "Fri - Mon = 1");
}
[TestMethod]
public void AccountForHolidays()
{
var service = new WorkingDays();
var from = new DateTime(2013, 8, 23);
Assert.AreEqual(0, service.GetWorkingDays(from, new DateTime(2013, 8, 26)), "Fri - Mon = 0");
Assert.AreEqual(1, service.GetWorkingDays(from, new DateTime(2013, 8, 27)), "Fri - Tues = 1");
}
}
#6
4
Here's some code for that purpose, with swedish holidays but you can adapt what holidays to count. Note that I added a limit you might want to remove, but it was for a web-based system and I didnt want anyone to enter some huge date to hog the process
这里有一些关于这个目的的代码,瑞典的假期,但是你可以适应假期的计算。注意,我添加了一个您可能想要删除的限制,但它是基于一个基于web的系统,我不希望任何人输入某个重要的日期来占用这个过程。
public static int GetWorkdays(DateTime from ,DateTime to)
{
int limit = 9999;
int counter = 0;
DateTime current = from;
int result = 0;
if (from > to)
{
DateTime temp = from;
from = to;
to = temp;
}
if (from >= to)
{
return 0;
}
while (current <= to && counter < limit)
{
if (IsSwedishWorkday(current))
{
result++;
}
current = current.AddDays(1);
counter++;
}
return result;
}
public static bool IsSwedishWorkday(DateTime date)
{
return (!IsSwedishHoliday(date) && date.DayOfWeek != DayOfWeek.Saturday && date.DayOfWeek != DayOfWeek.Sunday);
}
public static bool IsSwedishHoliday(DateTime date)
{
return (
IsSameDay(GetEpiphanyDay(date.Year), date) ||
IsSameDay(GetMayDay(date.Year), date) ||
IsSameDay(GetSwedishNationalDay(date.Year), date) ||
IsSameDay(GetChristmasDay(date.Year), date) ||
IsSameDay(GetBoxingDay(date.Year), date) ||
IsSameDay(GetGoodFriday(date.Year), date) ||
IsSameDay(GetAscensionDay(date.Year), date) ||
IsSameDay(GetAllSaintsDay(date.Year), date) ||
IsSameDay(GetMidsummersDay(date.Year), date) ||
IsSameDay(GetPentecostDay(date.Year), date) ||
IsSameDay(GetEasterMonday(date.Year), date) ||
IsSameDay(GetNewYearsDay(date.Year), date) ||
IsSameDay(GetEasterDay(date.Year), date)
);
}
// Trettondagen
public static DateTime GetEpiphanyDay(int year)
{
return new DateTime(year, 1, 6);
}
// Första maj
public static DateTime GetMayDay(int year)
{
return new DateTime(year,5,1);
}
// Juldagen
public static DateTime GetSwedishNationalDay(int year)
{
return new DateTime(year, 6, 6);
}
// Juldagen
public static DateTime GetNewYearsDay(int year)
{
return new DateTime(year,1,1);
}
// Juldagen
public static DateTime GetChristmasDay(int year)
{
return new DateTime(year,12,25);
}
// Annandag jul
public static DateTime GetBoxingDay(int year)
{
return new DateTime(year, 12, 26);
}
// Långfredagen
public static DateTime GetGoodFriday(int year)
{
return GetEasterDay(year).AddDays(-3);
}
// Kristi himmelsfärdsdag
public static DateTime GetAscensionDay(int year)
{
return GetEasterDay(year).AddDays(5*7+4);
}
// Midsommar
public static DateTime GetAllSaintsDay(int year)
{
DateTime result = new DateTime(year,10,31);
while (result.DayOfWeek != DayOfWeek.Saturday)
{
result = result.AddDays(1);
}
return result;
}
// Midsommar
public static DateTime GetMidsummersDay(int year)
{
DateTime result = new DateTime(year, 6, 20);
while (result.DayOfWeek != DayOfWeek.Saturday)
{
result = result.AddDays(1);
}
return result;
}
// Pingstdagen
public static DateTime GetPentecostDay(int year)
{
return GetEasterDay(year).AddDays(7 * 7);
}
// Annandag påsk
public static DateTime GetEasterMonday(int year)
{
return GetEasterDay(year).AddDays(1);
}
public static DateTime GetEasterDay(int y)
{
double c;
double n;
double k;
double i;
double j;
double l;
double m;
double d;
c = System.Math.Floor(y / 100.0);
n = y - 19 * System.Math.Floor(y / 19.0);
k = System.Math.Floor((c - 17) / 25.0);
i = c - System.Math.Floor(c / 4) - System.Math.Floor((c - k) / 3) + 19 * n + 15;
i = i - 30 * System.Math.Floor(i / 30);
i = i - System.Math.Floor(i / 28) * (1 - System.Math.Floor(i / 28) * System.Math.Floor(29 / (i + 1)) * System.Math.Floor((21 - n) / 11));
j = y + System.Math.Floor(y / 4.0) + i + 2 - c + System.Math.Floor(c / 4);
j = j - 7 * System.Math.Floor(j / 7);
l = i - j;
m = 3 + System.Math.Floor((l + 40) / 44);// month
d = l + 28 - 31 * System.Math.Floor(m / 4);// day
double days = ((m == 3) ? d : d + 31);
DateTime result = new DateTime(y, 3, 1).AddDays(days-1);
return result;
}
#7
4
Well this has been beaten to death. :) However I'm still going to provide another answer because I needed something a bit different. This solution is different in that it returns a Business TimeSpan between the start and end, and you can set the business hours of the day, and add holidays. So you can use it to calculate if it happens within a day, across days, over weekends, and even holidays. And you can get just the business days or not by just getting what you need from the returned TimeSpan object. And the way it uses lists of days, you can see how very easy it would be to add the list of non-work days if it's not the typical Sat and Sun. And I tested for a year, and it seems super fast.
这已经被打死了。但是我还是会提供另一个答案,因为我需要一些不同的东西。这个解决方案不同,它在开始和结束之间返回一个业务时间间隔,您可以设置一天的营业时间,并添加假日。所以你可以用它来计算它是否发生在一天之内,几天,周末,甚至节假日。你只需要从返回的TimeSpan对象中得到你需要的东西就可以得到营业时间。它使用天数列表的方式,你可以看到,如果不是典型的Sat和Sun,就可以很容易地添加非工作日列表。我做了一年的测试,看起来非常快。
I just hope the pasting of the code is accurate. But I know it works.
我只是希望代码的粘贴是准确的。但我知道这行得通。
public static TimeSpan GetBusinessTimespanBetween(
DateTime start, DateTime end,
TimeSpan workdayStartTime, TimeSpan workdayEndTime,
List<DateTime> holidays = null)
{
if (end < start)
throw new ArgumentException("start datetime must be before end datetime.");
// Just create an empty list for easier coding.
if (holidays == null) holidays = new List<DateTime>();
if (holidays.Where(x => x.TimeOfDay.Ticks > 0).Any())
throw new ArgumentException("holidays can not have a TimeOfDay, only the Date.");
var nonWorkDays = new List<DayOfWeek>() { DayOfWeek.Saturday, DayOfWeek.Sunday };
var startTime = start.TimeOfDay;
// If the start time is before the starting hours, set it to the starting hour.
if (startTime < workdayStartTime) startTime = workdayStartTime;
var timeBeforeEndOfWorkDay = workdayEndTime - startTime;
// If it's after the end of the day, then this time lapse doesn't count.
if (timeBeforeEndOfWorkDay.TotalSeconds < 0) timeBeforeEndOfWorkDay = new TimeSpan();
// If start is during a non work day, it doesn't count.
if (nonWorkDays.Contains(start.DayOfWeek)) timeBeforeEndOfWorkDay = new TimeSpan();
else if (holidays.Contains(start.Date)) timeBeforeEndOfWorkDay = new TimeSpan();
var endTime = end.TimeOfDay;
// If the end time is after the ending hours, set it to the ending hour.
if (endTime > workdayEndTime) endTime = workdayEndTime;
var timeAfterStartOfWorkDay = endTime - workdayStartTime;
// If it's before the start of the day, then this time lapse doesn't count.
if (timeAfterStartOfWorkDay.TotalSeconds < 0) timeAfterStartOfWorkDay = new TimeSpan();
// If end is during a non work day, it doesn't count.
if (nonWorkDays.Contains(end.DayOfWeek)) timeAfterStartOfWorkDay = new TimeSpan();
else if (holidays.Contains(end.Date)) timeAfterStartOfWorkDay = new TimeSpan();
// Easy scenario if the times are during the day day.
if (start.Date.CompareTo(end.Date) == 0)
{
if (nonWorkDays.Contains(start.DayOfWeek)) return new TimeSpan();
else if (holidays.Contains(start.Date)) return new TimeSpan();
return endTime - startTime;
}
else
{
var timeBetween = end - start;
var daysBetween = (int)Math.Floor(timeBetween.TotalDays);
var dailyWorkSeconds = (int)Math.Floor((workdayEndTime - workdayStartTime).TotalSeconds);
var businessDaysBetween = 0;
// Now the fun begins with calculating the actual Business days.
if (daysBetween > 0)
{
var nextStartDay = start.AddDays(1).Date;
var dayBeforeEnd = end.AddDays(-1).Date;
for (DateTime d = nextStartDay; d <= dayBeforeEnd; d = d.AddDays(1))
{
if (nonWorkDays.Contains(d.DayOfWeek)) continue;
else if (holidays.Contains(d.Date)) continue;
businessDaysBetween++;
}
}
var dailyWorkSecondsToAdd = dailyWorkSeconds * businessDaysBetween;
var output = timeBeforeEndOfWorkDay + timeAfterStartOfWorkDay;
output = output + new TimeSpan(0, 0, dailyWorkSecondsToAdd);
return output;
}
}
And here is test code: Note that you just have to put this function in a class called DateHelper for the test code to work.
这里是测试代码:请注意,您只需要将这个函数放入一个名为DateHelper的类中,以便测试代码能够工作。
[TestMethod]
public void TestGetBusinessTimespanBetween()
{
var workdayStart = new TimeSpan(8, 0, 0);
var workdayEnd = new TimeSpan(17, 0, 0);
var holidays = new List<DateTime>()
{
new DateTime(2018, 1, 15), // a Monday
new DateTime(2018, 2, 15) // a Thursday
};
var testdata = new[]
{
new
{
expectedMinutes = 0,
start = new DateTime(2016, 10, 19, 9, 50, 0),
end = new DateTime(2016, 10, 19, 9, 50, 0)
},
new
{
expectedMinutes = 10,
start = new DateTime(2016, 10, 19, 9, 50, 0),
end = new DateTime(2016, 10, 19, 10, 0, 0)
},
new
{
expectedMinutes = 5,
start = new DateTime(2016, 10, 19, 7, 50, 0),
end = new DateTime(2016, 10, 19, 8, 5, 0)
},
new
{
expectedMinutes = 5,
start = new DateTime(2016, 10, 19, 16, 55, 0),
end = new DateTime(2016, 10, 19, 17, 5, 0)
},
new
{
expectedMinutes = 15,
start = new DateTime(2016, 10, 19, 16, 50, 0),
end = new DateTime(2016, 10, 20, 8, 5, 0)
},
new
{
expectedMinutes = 10,
start = new DateTime(2016, 10, 19, 16, 50, 0),
end = new DateTime(2016, 10, 20, 7, 55, 0)
},
new
{
expectedMinutes = 5,
start = new DateTime(2016, 10, 19, 17, 10, 0),
end = new DateTime(2016, 10, 20, 8, 5, 0)
},
new
{
expectedMinutes = 0,
start = new DateTime(2016, 10, 19, 17, 10, 0),
end = new DateTime(2016, 10, 20, 7, 5, 0)
},
new
{
expectedMinutes = 545,
start = new DateTime(2016, 10, 19, 12, 10, 0),
end = new DateTime(2016, 10, 20, 12, 15, 0)
},
// Spanning multiple weekdays
new
{
expectedMinutes = 835,
start = new DateTime(2016, 10, 19, 12, 10, 0),
end = new DateTime(2016, 10, 21, 8, 5, 0)
},
// Spanning multiple weekdays
new
{
expectedMinutes = 1375,
start = new DateTime(2016, 10, 18, 12, 10, 0),
end = new DateTime(2016, 10, 21, 8, 5, 0)
},
// Spanning from a Thursday to a Tuesday, 5 mins short of complete day.
new
{
expectedMinutes = 1615,
start = new DateTime(2016, 10, 20, 12, 10, 0),
end = new DateTime(2016, 10, 25, 12, 5, 0)
},
// Spanning from a Thursday to a Tuesday, 5 mins beyond complete day.
new
{
expectedMinutes = 1625,
start = new DateTime(2016, 10, 20, 12, 10, 0),
end = new DateTime(2016, 10, 25, 12, 15, 0)
},
// Spanning from a Friday to a Monday, 5 mins beyond complete day.
new
{
expectedMinutes = 545,
start = new DateTime(2016, 10, 21, 12, 10, 0),
end = new DateTime(2016, 10, 24, 12, 15, 0)
},
// Spanning from a Friday to a Monday, 5 mins short complete day.
new
{
expectedMinutes = 535,
start = new DateTime(2016, 10, 21, 12, 10, 0),
end = new DateTime(2016, 10, 24, 12, 5, 0)
},
// Spanning from a Saturday to a Monday, 5 mins short complete day.
new
{
expectedMinutes = 245,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2016, 10, 24, 12, 5, 0)
},
// Spanning from a Saturday to a Sunday, 5 mins beyond complete day.
new
{
expectedMinutes = 0,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2016, 10, 23, 12, 15, 0)
},
// Times within the same Saturday.
new
{
expectedMinutes = 0,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2016, 10, 23, 12, 15, 0)
},
// Spanning from a Saturday to the Sunday next week.
new
{
expectedMinutes = 2700,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2016, 10, 30, 12, 15, 0)
},
// Spanning a year.
new
{
expectedMinutes = 143355,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2017, 10, 30, 12, 15, 0)
},
// Spanning a year with 2 holidays.
new
{
expectedMinutes = 142815,
start = new DateTime(2017, 10, 22, 12, 10, 0),
end = new DateTime(2018, 10, 30, 12, 15, 0)
},
};
foreach (var item in testdata)
{
Assert.AreEqual(item.expectedMinutes,
DateHelper.GetBusinessTimespanBetween(
item.start, item.end,
workdayStart, workdayEnd,
holidays)
.TotalMinutes);
}
}
#8
3
This solution avoids iteration, works for both +ve and -ve weekday differences and includes a unit test suite to regression against the slower method of counting weekdays. I've also include a concise method to add weekdays also works in the same non-iterative way.
这一解决方案避免了迭代,既适用于+ve和-ve工作日的差异,还包括一个单元测试套件,以与较慢的计算工作日的方法进行回归。我还包括了一个简单的添加工作日的方法,同样以非迭代的方式工作。
Unit tests cover a few thousand date combinations in order to exhaustively test all start/end weekday combinations with both small and large date ranges.
单元测试涵盖几千个日期组合,以详尽地测试所有的开始/结束工作日的组合,同时包含小的和大的日期范围。
Important: We make the assumption that we are counting days by excluding the start date and including the end date. This is important when counting weekdays as the specific start/end days that you include/exclude affect the result. This also ensures that the difference between two equal days is always zero and that we only include full working days as typically you want the answer to be correct for any time on the current start date (often today) and include the full end date (e.g. a due date).
重要的是:我们假定我们在计算天数的时候不包括开始日期,包括结束日期。这一点在计算工作日时是很重要的,因为包含/排除的特定的开始/结束日期会影响结果。这也确保了两个相等的天数之间的差值总是为零,而且我们只包含了完整的工作日,通常你希望在当前的开始日期(通常是今天)的任何时候都正确,并包括完整的结束日期(例如,截止日期)。
NOTE: This code needs an additional adjustment for holidays but in keeping with the above assumption, this code must exclude holidays on the start date.
注:此代码需要额外的假期调整,但按照上述假设,此代码必须在开始日期不包含假日。
Add weekdays:
增加工作日:
private static readonly int[,] _addOffset =
{
// 0 1 2 3 4
{0, 1, 2, 3, 4}, // Su 0
{0, 1, 2, 3, 4}, // M 1
{0, 1, 2, 3, 6}, // Tu 2
{0, 1, 4, 5, 6}, // W 3
{0, 1, 4, 5, 6}, // Th 4
{0, 3, 4, 5, 6}, // F 5
{0, 2, 3, 4, 5}, // Sa 6
};
public static DateTime AddWeekdays(this DateTime date, int weekdays)
{
int extraDays = weekdays % 5;
int addDays = weekdays >= 0
? (weekdays / 5) * 7 + _addOffset[(int)date.DayOfWeek, extraDays]
: (weekdays / 5) * 7 - _addOffset[6 - (int)date.DayOfWeek, -extraDays];
return date.AddDays(addDays);
}
Compute weekday difference:
计算工作日的区别:
static readonly int[,] _diffOffset =
{
// Su M Tu W Th F Sa
{0, 1, 2, 3, 4, 5, 5}, // Su
{4, 0, 1, 2, 3, 4, 4}, // M
{3, 4, 0, 1, 2, 3, 3}, // Tu
{2, 3, 4, 0, 1, 2, 2}, // W
{1, 2, 3, 4, 0, 1, 1}, // Th
{0, 1, 2, 3, 4, 0, 0}, // F
{0, 1, 2, 3, 4, 5, 0}, // Sa
};
public static int GetWeekdaysDiff(this DateTime dtStart, DateTime dtEnd)
{
int daysDiff = (int)(dtEnd - dtStart).TotalDays;
return daysDiff >= 0
? 5 * (daysDiff / 7) + _diffOffset[(int) dtStart.DayOfWeek, (int) dtEnd.DayOfWeek]
: 5 * (daysDiff / 7) - _diffOffset[6 - (int) dtStart.DayOfWeek, 6 - (int) dtEnd.DayOfWeek];
}
I found that most other solutions on stack overflow were either slow (iterative) or overly complex and many were just plain incorrect. Moral of the story is ... Don't trust it unless you've exhaustively tested it!!
我发现,stack overflow上的大多数其他解决方案要么是缓慢的(迭代的)要么是过于复杂的,而且很多都是不正确的。这个故事的寓意是……除非你对它进行了详尽的测试,否则不要相信它!!
Unit tests based on NUnit Combinatorial testing and ShouldBe NUnit extension.
单元测试基于NUnit组合测试,应该是NUnit扩展。
[TestFixture]
public class DateTimeExtensionsTests
{
/// <summary>
/// Exclude start date, Include end date
/// </summary>
/// <param name="dtStart"></param>
/// <param name="dtEnd"></param>
/// <returns></returns>
private IEnumerable<DateTime> GetDateRange(DateTime dtStart, DateTime dtEnd)
{
Console.WriteLine(@"dtStart={0:yy-MMM-dd ddd}, dtEnd={1:yy-MMM-dd ddd}", dtStart, dtEnd);
TimeSpan diff = dtEnd - dtStart;
Console.WriteLine(diff);
if (dtStart <= dtEnd)
{
for (DateTime dt = dtStart.AddDays(1); dt <= dtEnd; dt = dt.AddDays(1))
{
Console.WriteLine(@"dt={0:yy-MMM-dd ddd}", dt);
yield return dt;
}
}
else
{
for (DateTime dt = dtStart.AddDays(-1); dt >= dtEnd; dt = dt.AddDays(-1))
{
Console.WriteLine(@"dt={0:yy-MMM-dd ddd}", dt);
yield return dt;
}
}
}
[Test, Combinatorial]
public void TestGetWeekdaysDiff(
[Values(1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 30)]
int startDay,
[Values(1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 30)]
int endDay,
[Values(7)]
int startMonth,
[Values(7)]
int endMonth)
{
// Arrange
DateTime dtStart = new DateTime(2016, startMonth, startDay);
DateTime dtEnd = new DateTime(2016, endMonth, endDay);
int nDays = GetDateRange(dtStart, dtEnd)
.Count(dt => dt.DayOfWeek != DayOfWeek.Saturday && dt.DayOfWeek != DayOfWeek.Sunday);
if (dtEnd < dtStart) nDays = -nDays;
Console.WriteLine(@"countBusDays={0}", nDays);
// Act / Assert
dtStart.GetWeekdaysDiff(dtEnd).ShouldBe(nDays);
}
[Test, Combinatorial]
public void TestAddWeekdays(
[Values(1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 30)]
int startDay,
[Values(0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 30)]
int weekdays)
{
DateTime dtStart = new DateTime(2016, 7, startDay);
DateTime dtEnd1 = dtStart.AddWeekdays(weekdays); // ADD
dtStart.GetWeekdaysDiff(dtEnd1).ShouldBe(weekdays);
DateTime dtEnd2 = dtStart.AddWeekdays(-weekdays); // SUBTRACT
dtStart.GetWeekdaysDiff(dtEnd2).ShouldBe(-weekdays);
}
}
#9
1
I think none of the above answers are actually correct. None of them solves all the special cases such as when the dates starts and ends on the middle of a weekend, when the date starts on a Friday and ends on next Monday, etc. On top of that, they all round the calculations to whole days, so if the start date is in the middle of a saturday for example, it will substract a whole day from the working days, giving wrong results...
我认为以上的答案都不正确。没有人解决时所有的特殊情况,如日期开始和结束在一个周末,当日期开始在周五将于下周一结束,等。最重要的是,他们都在计算整个天,如果开始日期是在周六为例,它将减去一天工作日,给出错误的结果……
Anyway, here is my solution that is quite efficient and simple and works for all cases. The trick is just to find the previous Monday for start and end dates, and then do a small compensation when start and end happens during the weekend:
无论如何,这是我的解决方案,它非常高效,简单,适用于所有情况。诀窍就在于找到周一开始和结束的日期,然后在周末开始和结束时做一个小小的补偿:
public double WorkDays(DateTime startDate, DateTime endDate){
double weekendDays;
double days = endDate.Subtract(startDate).TotalDays;
if(days<0) return 0;
DateTime startMonday = startDate.AddDays(DayOfWeek.Monday - startDate.DayOfWeek).Date;
DateTime endMonday = endDate.AddDays(DayOfWeek.Monday - endDate.DayOfWeek).Date;
weekendDays = ((endMonday.Subtract(startMonday).TotalDays) / 7) * 2;
// compute fractionary part of weekend days
double diffStart = startDate.Subtract(startMonday).TotalDays - 5;
double diffEnd = endDate.Subtract(endMonday).TotalDays - 5;
// compensate weekenddays
if(diffStart>0) weekendDays -= diffStart;
if(diffEnd>0) weekendDays += diffEnd;
return days - weekendDays;
}
#10
1
Here's a quick sample code. It's a class method, so will only work inside of your class. If you want it to be static
, change the signature to private static
(or public static
).
这里有一个快速的示例代码。这是一个类方法,所以只在类内部工作。如果您希望它是静态的,请将签名更改为私有静态(或公共静态)。
private IEnumerable<DateTime> GetWorkingDays(DateTime sd, DateTime ed)
{
for (var d = sd; d <= ed; d.AddDays(1))
if (d.DayOfWeek != DayOfWeek.Saturday && d.DayOfWeek != DayOfWeek.Sunday)
yield return d;
}
This method creates a loop variable d
, initializes it to the start day, sd
, then increments by one day each iteration (d.AddDays(1)
).
这个方法创建一个循环变量d,初始化它到开始日,sd,然后每一次迭代递增一天(d. adddays(1))。
It returns the desired values using yield
, which creates an iterator
. The cool thing about iterators is that they don't hold all of the values of the IEnumerable
in memory, only calling each one sequentially. This means that you can call this method from the dawn of time to now without having to worry about running out of memory.
它使用yield(创建迭代器)返回所需的值。迭代器最酷的地方是它们不包含内存中IEnumerable的所有值,只是按顺序调用它们。这意味着您可以从时间的黎明调用此方法,而不必担心内存耗尽。
#11
0
I'll just share my solution. It worked for me, maybe I just don't notice/know that theres a bug. I started by getting the first incomplete week if there's any. a complete week was from sunday for saturday, so if the (int)_now.DayOfWeek was not 0(Sunday), the first week was incomplete.
我来分享我的解决方案。它对我起作用了,也许我只是没注意到/知道有bug。我从第一个不完整的周开始,如果有的话。一个完整的星期是从星期天开始的星期六,所以如果(int)现在。周日不是0(星期日),第一周是不完整的。
I just subtract 1 to first weeks count for the first week's saturday then add it to new count;
我只是把第一周的第一个星期减去1,然后把它加到新的数里;
Then I get the last incomplete week, then subtract 1 for it's sunday then add to new count.
然后我得到最后一个不完整的星期,然后减去1,因为它是星期天,然后增加新的计数。
Then finally, the number of complete weeks multiply by 5(weekdays) was added to new count.
最后,将完整的周数乘以5(工作日)增加到新的计数。
public int RemoveNonWorkingDays(int numberOfDays){
int workingDays = 0;
int firstWeek = 7 - (int)_now.DayOfWeek;
if(firstWeek < 7){
if(firstWeek > numberOfDays)
return numberOfDays;
workingDays += firstWeek-1;
numberOfDays -= firstWeek;
}
int lastWeek = numberOfDays % 7;
if(lastWeek > 0){
numberOfDays -= lastWeek;
workingDays += lastWeek - 1;
}
workingDays += (numberOfDays/7)*5;
return workingDays;
}
#12
0
I was having trouble finding a solid TSQL version of this code. Below is essentially a conversion of the C# code here with addition of the Holiday table which should be used to pre-calculate holidays.
我很难找到一个可靠的TSQL版本的代码。下面是c#代码的转换,添加了假日表,应该用来提前计算假期。
CREATE TABLE dbo.Holiday
(
HolidayDt DATE NOT NULL,
Name NVARCHAR(50) NOT NULL,
IsWeekday BIT NOT NULL,
CONSTRAINT PK_Holiday PRIMARY KEY (HolidayDt)
)
GO
CREATE INDEX IDX_Holiday ON Holiday (HolidayDt, IsWeekday)
GO
CREATE function dbo.GetBusinessDays
(
@FirstDay datetime,
@LastDay datetime
)
RETURNS INT
AS
BEGIN
DECLARE @BusinessDays INT, @FullWeekCount INT
SELECT @FirstDay = CONVERT(DATETIME,CONVERT(DATE,@FirstDay))
, @LastDay = CONVERT(DATETIME,CONVERT(DATE,@LastDay))
IF @FirstDay > @LastDay
RETURN NULL;
SELECT @BusinessDays = DATEDIFF(DAY, @FirstDay, @LastDay) + 1
SELECT @FullWeekCount = @BusinessDays / 7;
-- find out if there are weekends during the time exceedng the full weeks
IF @BusinessDays > (@FullWeekCount * 7)
BEGIN
-- we are here to find out if there is a 1-day or 2-days weekend
-- in the time interval remaining after subtracting the complete weeks
DECLARE @firstDayOfWeek INT, @lastDayOfWeek INT;
SELECT @firstDayOfWeek = DATEPART(DW, @FirstDay), @lastDayOfWeek = DATEPART(DW, @LastDay);
IF @lastDayOfWeek < @firstDayOfWeek
SELECT @lastDayOfWeek = @lastDayOfWeek + 7;
IF @firstDayOfWeek <= 6
BEGIN
IF (@lastDayOfWeek >= 7) --Both Saturday and Sunday are in the remaining time interval
BEGIN
SELECT @BusinessDays = @BusinessDays - 2
END
ELSE IF @lastDayOfWeek>=6 --Only Saturday is in the remaining time interval
BEGIN
SELECT @BusinessDays = @BusinessDays - 1
END
END
ELSE IF @firstDayOfWeek <= 7 AND @lastDayOfWeek >=7 -- Only Sunday is in the remaining time interval
BEGIN
SELECT @BusinessDays = @BusinessDays - 1
END
END
-- subtract the weekends during the full weeks in the interval
DECLARE @Holidays INT;
SELECT @Holidays = COUNT(*)
FROM Holiday
WHERE HolidayDt BETWEEN @FirstDay AND @LastDay
AND IsWeekday = CAST(1 AS BIT)
SELECT @BusinessDays = @BusinessDays - (@FullWeekCount + @FullWeekCount) -- - @Holidays
RETURN @BusinessDays
END
#13
0
int BusinessDayDifference(DateTime Date1, DateTime Date2)
{
int Sign = 1;
if (Date2 > Date1)
{
Sign = -1;
DateTime TempDate = Date1;
Date1 = Date2;
Date2 = TempDate;
}
int BusDayDiff = (int)(Date1.Date - Date2.Date).TotalDays;
if (Date1.DayOfWeek == DayOfWeek.Saturday)
BusDayDiff -= 1;
if (Date2.DayOfWeek == DayOfWeek.Sunday)
BusDayDiff -= 1;
int Week1 = GetWeekNum(Date1);
int Week2 = GetWeekNum(Date2);
int WeekDiff = Week1 - Week2;
BusDayDiff -= WeekDiff * 2;
foreach (DateTime Holiday in Holidays)
if (Date1 >= Holiday && Date2 <= Holiday)
BusDayDiff--;
BusDayDiff *= Sign;
return BusDayDiff;
}
private int GetWeekNum(DateTime Date)
{
return (int)(Date.AddDays(-(int)Date.DayOfWeek).Ticks / TimeSpan.TicksPerDay / 7);
}
#14
0
Here is one very simple solution for this problem. We have starting date, end date and "for loop" for encreasing the day and calculating to see if it's a workday or a weekend by converting to string DayOfWeek.
这里有一个非常简单的解决方法。我们有开始日期、结束日期和“for循环”,以确定日期和计算,看看它是一个工作日还是一个周末,通过转换为string DayOfWeek。
class Program
{
static void Main(string[] args)
{
DateTime day = new DateTime();
Console.Write("Inser your end date (example: 01/30/2015): ");
DateTime endDate = DateTime.Parse(Console.ReadLine());
int numberOfDays = 0;
for (day = DateTime.Now.Date; day.Date < endDate.Date; day = day.Date.AddDays(1))
{
string dayToString = Convert.ToString(day.DayOfWeek);
if (dayToString != "Saturday" && dayToString != "Sunday") numberOfDays++;
}
Console.WriteLine("Number of working days (not including local holidays) between two dates is "+numberOfDays);
}
}
#15
0
Based on the comment marked as answer and patch recommended , as well as -> This version wants to convert the Days to Business-Hours ... Considers Same day hours as well.
根据所推荐的答案和补丁,以及->,这个版本希望将这些天转换成营业时间……同时考虑当天的工作时间。
/// <summary>
/// Calculates number of business days, taking into account:
/// - weekends (Saturdays and Sundays)
/// - bank holidays in the middle of the week
/// </summary>
/// <param name="firstDay">First day in the time interval</param>
/// <param name="lastDay">Last day in the time interval</param>
/// <param name="bankHolidays">List of bank holidays excluding weekends</param>
/// <returns>Number of business hours during the 'span'</returns>
public static int BusinessHoursUntil(DateTime firstDay, DateTime lastDay, params DateTime[] bankHolidays)
{
var original_firstDay = firstDay;
var original_lastDay = lastDay;
firstDay = firstDay.Date;
lastDay = lastDay.Date;
if (firstDay > lastDay)
return -1; //// throw new ArgumentException("Incorrect last day " + lastDay);
TimeSpan span = lastDay - firstDay;
int businessDays = span.Days + 1;
int fullWeekCount = businessDays / 7;
// find out if there are weekends during the time exceedng the full weeks
if (businessDays > fullWeekCount * 7)
{
// we are here to find out if there is a 1-day or 2-days weekend
// in the time interval remaining after subtracting the complete weeks
int firstDayOfWeek = firstDay.DayOfWeek == DayOfWeek.Sunday ? 7 : (int)firstDay.DayOfWeek;
int lastDayOfWeek = lastDay.DayOfWeek == DayOfWeek.Sunday ? 7 : (int)lastDay.DayOfWeek;
if (lastDayOfWeek < firstDayOfWeek)
lastDayOfWeek += 7;
if (firstDayOfWeek <= 6)
{
if (lastDayOfWeek >= 7)// Both Saturday and Sunday are in the remaining time interval
businessDays -= 2;
else if (lastDayOfWeek >= 6)// Only Saturday is in the remaining time interval
businessDays -= 1;
}
else if (firstDayOfWeek <= 7 && lastDayOfWeek >= 7)// Only Sunday is in the remaining time interval
businessDays -= 1;
}
// subtract the weekends during the full weeks in the interval
businessDays -= fullWeekCount + fullWeekCount;
if (bankHolidays != null && bankHolidays.Any())
{
// subtract the number of bank holidays during the time interval
foreach (DateTime bankHoliday in bankHolidays)
{
DateTime bh = bankHoliday.Date;
if (firstDay <= bh && bh <= lastDay)
--businessDays;
}
}
int total_business_hours = 0;
if (firstDay.Date == lastDay.Date)
{//If on the same day, go granular with Hours from the Orginial_*Day values
total_business_hours = (int)(original_lastDay - original_firstDay).TotalHours;
}
else
{//Convert Business-Days to TotalHours
total_business_hours = (int)(firstDay.AddDays(businessDays).AddHours(firstDay.Hour) - firstDay).TotalHours;
}
return total_business_hours;
}
#16
0
using System;
namespace ConsoleApplication1
{
class Program
{
static void Main(string[] args)
{
DateTime start = new DateTime(2014, 1, 1);
DateTime stop = new DateTime(2014, 12, 31);
int totalWorkingDays = GetNumberOfWorkingDays(start, stop);
Console.WriteLine("There are {0} working days.", totalWorkingDays);
}
private static int GetNumberOfWorkingDays(DateTime start, DateTime stop)
{
TimeSpan interval = stop - start;
int totalWeek = interval.Days / 7;
int totalWorkingDays = 5 * totalWeek;
int remainingDays = interval.Days % 7;
for (int i = 0; i <= remainingDays; i++)
{
DayOfWeek test = (DayOfWeek)(((int)start.DayOfWeek + i) % 7);
if (test >= DayOfWeek.Monday && test <= DayOfWeek.Friday)
totalWorkingDays++;
}
return totalWorkingDays;
}
}
}
#17
0
I just improved @Alexander and @Slauma answer to support a business week as a parameter, for cases where saturday is a business day, or even cases where there is just a couple of days of the week that are considered business days:
我只是改进了@Alexander和@Slauma的答案来支持商业周刊作为一个参数,在星期六是工作日的情况下,甚至是一周中有几天被视为工作日的情况:
/// <summary>
/// Calculate the number of business days between two dates, considering:
/// - Days of the week that are not considered business days.
/// - Holidays between these two dates.
/// </summary>
/// <param name="fDay">First day of the desired 'span'.</param>
/// <param name="lDay">Last day of the desired 'span'.</param>
/// <param name="BusinessDaysOfWeek">Days of the week that are considered to be business days, if NULL considers monday, tuesday, wednesday, thursday and friday as business days of the week.</param>
/// <param name="Holidays">Holidays, if NULL, considers no holiday.</param>
/// <returns>Number of business days during the 'span'</returns>
public static int BusinessDaysUntil(this DateTime fDay, DateTime lDay, DayOfWeek[] BusinessDaysOfWeek = null, DateTime[] Holidays = null)
{
if (BusinessDaysOfWeek == null)
BusinessDaysOfWeek = new DayOfWeek[] { DayOfWeek.Monday, DayOfWeek.Tuesday, DayOfWeek.Wednesday, DayOfWeek.Thursday, DayOfWeek.Friday };
if (Holidays == null)
Holidays = new DateTime[] { };
fDay = fDay.Date;
lDay = lDay.Date;
if (fDay > lDay)
throw new ArgumentException("Incorrect last day " + lDay);
int bDays = (lDay - fDay).Days + 1;
int fullWeekCount = bDays / 7;
int fullWeekCountMult = 7 - WeekDays.Length;
// Find out if there are weekends during the time exceedng the full weeks
if (bDays > (fullWeekCount * 7))
{
int fDayOfWeek = (int)fDay.DayOfWeek;
int lDayOfWeek = (int)lDay.DayOfWeek;
if (fDayOfWeek > lDayOfWeek)
lDayOfWeek += 7;
// If they are the same, we already covered it right before the Holiday subtraction
if (lDayOfWeek != fDayOfWeek)
{
// Here we need to see if any of the days between are considered business days
for (int i = fDayOfWeek; i <= lDayOfWeek; i++)
if (!WeekDays.Contains((DayOfWeek)(i > 6 ? i - 7 : i)))
bDays -= 1;
}
}
// Subtract the days that are not in WeekDays[] during the full weeks in the interval
bDays -= (fullWeekCount * fullWeekCountMult);
// Subtract the number of bank holidays during the time interval
bDays = bDays - Holidays.Select(x => x.Date).Count(x => fDay <= x && x <= lDay);
return bDays;
}
#18
0
Here is the function which we can use to calculate business days between two date. I'm not using holiday list as it can vary accross country/region.
这是我们可以用来计算两个日期之间的工作日的函数。我不使用假期清单,因为它可以改变国家/地区。
If we want to use it anyway we can take third argument as list of holiday and before incrementing count we should check that list does not contains d
如果我们想要使用它,我们可以将第三个参数作为假日列表,在增加计数之前,我们应该检查这个列表不包含d。
public static int GetBussinessDaysBetweenTwoDates(DateTime StartDate, DateTime EndDate)
{
if (StartDate > EndDate)
return -1;
int bd = 0;
for (DateTime d = StartDate; d < EndDate; d = d.AddDays(1))
{
if (d.DayOfWeek != DayOfWeek.Saturday && d.DayOfWeek != DayOfWeek.Sunday)
bd++;
}
return bd;
}
#19
0
I believe this could be a simpler way:
我相信这是一种更简单的方法:
public int BusinessDaysUntil(DateTime start, DateTime end, params DateTime[] bankHolidays)
{
int tld = (int)((end - start).TotalDays) + 1; //including end day
int not_buss_day = 2 * (tld / 7); //Saturday and Sunday
int rest = tld % 7; //rest.
if (rest > 0)
{
int tmp = (int)start.DayOfWeek - 1 + rest;
if (tmp == 6 || start.DayOfWeek == DayOfWeek.Sunday) not_buss_day++; else if (tmp > 6) not_buss_day += 2;
}
foreach (DateTime bankHoliday in bankHolidays)
{
DateTime bh = bankHoliday.Date;
if (!(bh.DayOfWeek == DayOfWeek.Saturday || bh.DayOfWeek == DayOfWeek.Sunday) && (start <= bh && bh <= end))
{
not_buss_day++;
}
}
return tld - not_buss_day;
}
#20
0
Here's yet another idea - this method allows to specify any working week and holidays.
这是另一个想法——这个方法可以指定任何工作周和假期。
The idea here is that we find the core of the date range from the first first working day of the week to the last weekend day of the week. This enables us to calculate the whole weeks easily (without iterating over all of the dates). All we need to do then is to add the working days that fall before the start and end of this core range.
这里的想法是,我们找到了日期范围的核心,从一周的第一个工作日,到周末的最后一个周末。这使我们能够轻松计算整个星期(不迭代所有日期)。我们需要做的就是添加在这个核心范围开始和结束之前的工作天。
public static int CalculateWorkingDays(
DateTime startDate,
DateTime endDate,
IList<DateTime> holidays,
DayOfWeek firstDayOfWeek,
DayOfWeek lastDayOfWeek)
{
// Make sure the defined working days run contiguously
if (lastDayOfWeek < firstDayOfWeek)
{
throw new Exception("Last day of week cannot fall before first day of week!");
}
// Create a list of the days of the week that make-up the weekend by working back
// from the firstDayOfWeek and forward from lastDayOfWeek to get the start and end
// the weekend
var weekendStart = lastDayOfWeek == DayOfWeek.Saturday ? DayOfWeek.Sunday : lastDayOfWeek + 1;
var weekendEnd = firstDayOfWeek == DayOfWeek.Sunday ? DayOfWeek.Saturday : firstDayOfWeek - 1;
var weekendDays = new List<DayOfWeek>();
var w = weekendStart;
do {
weekendDays.Add(w);
if (w == weekendEnd) break;
w = (w == DayOfWeek.Saturday) ? DayOfWeek.Sunday : w + 1;
} while (true);
// Force simple dates - no time
startDate = startDate.Date;
endDate = endDate.Date;
// Ensure a progessive date range
if (endDate < startDate)
{
var t = startDate;
startDate = endDate;
endDate = t;
}
// setup some working variables and constants
const int daysInWeek = 7; // yeah - really!
var actualStartDate = startDate; // this will end up on startOfWeek boundary
var actualEndDate = endDate; // this will end up on weekendEnd boundary
int workingDaysInWeek = daysInWeek - weekendDays.Count;
int workingDays = 0; // the result we are trying to find
int leadingDays = 0; // the number of working days leading up to the firstDayOfWeek boundary
int trailingDays = 0; // the number of working days counting back to the weekendEnd boundary
// Calculate leading working days
// if we aren't on the firstDayOfWeek we need to step forward to the nearest
if (startDate.DayOfWeek != firstDayOfWeek)
{
var d = startDate;
do {
if (d.DayOfWeek == firstDayOfWeek || d >= endDate)
{
actualStartDate = d;
break;
}
if (!weekendDays.Contains(d.DayOfWeek))
{
leadingDays++;
}
d = d.AddDays(1);
} while(true);
}
// Calculate trailing working days
// if we aren't on the weekendEnd we step back to the nearest
if (endDate >= actualStartDate && endDate.DayOfWeek != weekendEnd)
{
var d = endDate;
do {
if (d.DayOfWeek == weekendEnd || d < actualStartDate)
{
actualEndDate = d;
break;
}
if (!weekendDays.Contains(d.DayOfWeek))
{
trailingDays++;
}
d = d.AddDays(-1);
} while(true);
}
// Calculate the inclusive number of days between the actualStartDate and the actualEndDate
var coreDays = (actualEndDate - actualStartDate).Days + 1;
var noWeeks = coreDays / daysInWeek;
// add together leading, core and trailing days
workingDays += noWeeks * workingDaysInWeek;
workingDays += leadingDays;
workingDays += trailingDays;
// Finally remove any holidays that fall within the range.
if (holidays != null)
{
workingDays -= holidays.Count(h => h >= startDate && (h <= endDate));
}
return workingDays;
}
#21
0
Since I can't comment. There is one more issue with the accepted solution where bank holidays are subtracted even when they are situated in the weekend. Seeing how other input is checked, it is only fitting that this is as well.
因为我不能评论。还有一个问题是,即使是在周末,银行假日也会被取消。看到其他输入是如何被检查的,这也是很合适的。
The foreach should therefore be:
因此,foreach应该是:
// subtract the number of bank holidays during the time interval
foreach (DateTime bankHoliday in bankHolidays)
{
DateTime bh = bankHoliday.Date;
// Do not subtract bank holidays when they fall in the weekend to avoid double subtraction
if (bh.DayOfWeek == DayOfWeek.Saturday || bh.DayOfWeek == DayOfWeek.Sunday)
continue;
if (firstDay <= bh && bh <= lastDay)
--businessDays;
}
#22
0
I searched a lot for a, easy to digest, algorithm to calculate the working days between 2 dates, and also to exclude the national holidays, and finally I decide to go with this approach:
我搜索了很多,很容易消化,算法计算了两个日期之间的工作天,也排除了国家假期,最后我决定采用这种方法:
public static int NumberOfWorkingDaysBetween2Dates(DateTime start,DateTime due,IEnumerable<DateTime> holidays)
{
var dic = new Dictionary<DateTime, DayOfWeek>();
var totalDays = (due - start).Days;
for (int i = 0; i < totalDays + 1; i++)
{
if (!holidays.Any(x => x == start.AddDays(i)))
dic.Add(start.AddDays(i), start.AddDays(i).DayOfWeek);
}
return dic.Where(x => x.Value != DayOfWeek.Saturday && x.Value != DayOfWeek.Sunday).Count();
}
Basically I wanted to go with each date and evaluate my conditions:
基本上,我想和每个日期一起去评估我的条件:
- Is not Saturday
- 不是星期六
- Is not Sunday
- 不是星期天
- Is not national holiday
- 不是国定假日
but also I wanted to avoid iterating dates.
但我也想避免重复日期。
By running and measuring the time need it to evaluate 1 full year, I go the following result:
通过跑步和测量时间需要它来评估一整年,我的结果如下:
static void Main(string[] args)
{
var start = new DateTime(2017, 1, 1);
var due = new DateTime(2017, 12, 31);
var sw = Stopwatch.StartNew();
var days = NumberOfWorkingDaysBetween2Dates(start, due,NationalHolidays());
sw.Stop();
Console.WriteLine($"Total working days = {days} --- time: {sw.Elapsed}");
Console.ReadLine();
// result is:
// Total working days = 249-- - time: 00:00:00.0269087
}
#23
-1
This is a generic solution.
这是一个通用的解决方案。
startdayvalue is day number of start date.
startdayvalue是开始日期的日期。
weekendday_1 is day numner of week end.
weekendday_1是周末的天数。
day number - MON - 1, TUE - 2, ... SAT - 6, SUN -7.
日数- MON - 1, TUE - 2,…SAT - 6, SUN -7。
difference is difference between two dates..
区别是两个日期的差。
Example : Start Date : 4 April, 2013, End Date : 14 April, 2013
例子:开始日期:2013年4月4日,结束日期:2013年4月14日。
Difference : 10, startdayvalue : 4, weekendday_1 : 7 (if SUNDAY is a weekend for you.)
区别:10,startdayvalue: 4, weekendday_1: 7(如果周日是你的周末)。
This will give you number of holidays.
这会给你一些假期。
No of business day = (Difference + 1) - holiday1
没有工作日=(差+ 1)-假期。
if (startdayvalue > weekendday_1)
{
if (difference > ((7 - startdayvalue) + weekendday_1))
{
holiday1 = (difference - ((7 - startdayvalue) + weekendday_1)) / 7;
holiday1 = holiday1 + 1;
}
else
{
holiday1 = 0;
}
}
else if (startdayvalue < weekendday_1)
{
if (difference > (weekendday_1 - startdayvalue))
{
holiday1 = (difference - (weekendday_1 - startdayvalue)) / 7;
holiday1 = holiday1 + 1;
}
else if (difference == (weekendday_1 - startdayvalue))
{
holiday1 = 1;
}
else
{
holiday1 = 0;
}
}
else
{
holiday1 = difference / 7;
holiday1 = holiday1 + 1;
}
#24
-1
public enum NonWorkingDays { SaturdaySunday = 0, FridaySaturday = 1 };
public int getBusinessDates(DateTime dateSt, DateTime dateNd, NonWorkingDays nonWorkingDays = NonWorkingDays.SaturdaySunday)
{
List<DateTime> datelist = new List<DateTime>();
while (dateSt.Date < dateNd.Date)
{
datelist.Add((dateSt = dateSt.AddDays(1)));
}
if (nonWorkingDays == NonWorkingDays.SaturdaySunday)
{
return datelist.Count(d => d.DayOfWeek != DayOfWeek.Saturday &&
d.DayOfWeek != DayOfWeek.Friday);
}
else
{
return datelist.Count(d => d.DayOfWeek != DayOfWeek.Friday &&
d.DayOfWeek != DayOfWeek.Saturday);
}
}
#1
98
I've had such a task before and I've got the solution. I would avoid enumerating all days in between when it's avoidable, which is the case here. I don't even mention creating a bunch of DateTime instances, as I saw in one of the answers above. This is really waste of processing power. Especially in the real world situation, when you have to examine time intervals of several months. See my code, with comments, below.
我以前有过这样的任务,我有解决办法。我要避免在可以避免的情况下列举所有的日子,这就是我要说的。我甚至没有提到创建一些DateTime实例,正如我在上面的一个答案中所看到的。这真是浪费了处理能力。特别是在现实世界中,当你需要检查几个月的时间间隔时。查看我的代码,下面是注释。
/// <summary>
/// Calculates number of business days, taking into account:
/// - weekends (Saturdays and Sundays)
/// - bank holidays in the middle of the week
/// </summary>
/// <param name="firstDay">First day in the time interval</param>
/// <param name="lastDay">Last day in the time interval</param>
/// <param name="bankHolidays">List of bank holidays excluding weekends</param>
/// <returns>Number of business days during the 'span'</returns>
public static int BusinessDaysUntil(this DateTime firstDay, DateTime lastDay, params DateTime[] bankHolidays)
{
firstDay = firstDay.Date;
lastDay = lastDay.Date;
if (firstDay > lastDay)
throw new ArgumentException("Incorrect last day " + lastDay);
TimeSpan span = lastDay - firstDay;
int businessDays = span.Days + 1;
int fullWeekCount = businessDays / 7;
// find out if there are weekends during the time exceedng the full weeks
if (businessDays > fullWeekCount*7)
{
// we are here to find out if there is a 1-day or 2-days weekend
// in the time interval remaining after subtracting the complete weeks
int firstDayOfWeek = (int) firstDay.DayOfWeek;
int lastDayOfWeek = (int) lastDay.DayOfWeek;
if (lastDayOfWeek < firstDayOfWeek)
lastDayOfWeek += 7;
if (firstDayOfWeek <= 6)
{
if (lastDayOfWeek >= 7)// Both Saturday and Sunday are in the remaining time interval
businessDays -= 2;
else if (lastDayOfWeek >= 6)// Only Saturday is in the remaining time interval
businessDays -= 1;
}
else if (firstDayOfWeek <= 7 && lastDayOfWeek >= 7)// Only Sunday is in the remaining time interval
businessDays -= 1;
}
// subtract the weekends during the full weeks in the interval
businessDays -= fullWeekCount + fullWeekCount;
// subtract the number of bank holidays during the time interval
foreach (DateTime bankHoliday in bankHolidays)
{
DateTime bh = bankHoliday.Date;
if (firstDay <= bh && bh <= lastDay)
--businessDays;
}
return businessDays;
}
Edit by Slauma, August 2011
由Slauma编辑,2011年8月。
Great answer! There is little bug though. I take the freedom to edit this answer since the answerer is absent since 2009.
很棒的回答!不过也有小错误。自从2009年以来,我一直没有回答这个问题,所以我可以*地编辑这个答案。
The code above assumes that DayOfWeek.Sunday
has the value 7
which is not the case. The value is actually 0
. It leads to a wrong calculation if for example firstDay
and lastDay
are both the same Sunday. The method returns 1
in this case but it should be 0
.
上面的代码假设是在那天。周日的值是7,而不是这个情况。这个值实际上是0。如果第一天和最后一天都是同一个星期天,那就会导致错误的计算。这个方法返回1,但它应该是0。
Easiest fix for this bug: Replace in the code above the lines where firstDayOfWeek
and lastDayOfWeek
are declared by the following:
最简单的解决方法是:将代码替换为第一天和最后一周的第一天和最后一周的代码:
int firstDayOfWeek = firstDay.DayOfWeek == DayOfWeek.Sunday
? 7 : (int)firstDay.DayOfWeek;
int lastDayOfWeek = lastDay.DayOfWeek == DayOfWeek.Sunday
? 7 : (int)lastDay.DayOfWeek;
Now the result is:
现在的结果是:
- Friday to Friday -> 1
- 周五至周五-> 1。
- Saturday to Saturday -> 0
- 周六到周六-> 0。
- Sunday to Sunday -> 0
- 周日到周日->。
- Friday to Saturday -> 1
- 周五到周六-> 1。
- Friday to Sunday -> 1
- 周五至周日-> 1。
- Friday to Monday -> 2
- 周五到周一-> 2。
- Saturday to Monday -> 1
- 周六至周一-> 1。
- Sunday to Monday -> 1
- 周日至周一-> 1。
- Monday to Monday -> 1
- 周一至周一-> 1。
#2
72
Ok. I think it's time to post the right answer:
好的。我认为是时候公布正确答案了:
public static double GetBusinessDays(DateTime startD, DateTime endD)
{
double calcBusinessDays =
1 + ((endD - startD).TotalDays * 5 -
(startD.DayOfWeek - endD.DayOfWeek) * 2) / 7;
if (endD.DayOfWeek == DayOfWeek.Saturday) calcBusinessDays--;
if (startD.DayOfWeek == DayOfWeek.Sunday) calcBusinessDays--;
return calcBusinessDays;
}
Original Source:
原始资料来源:
http://alecpojidaev.wordpress.com/2009/10/29/work-days-calculation-with-c/
http://alecpojidaev.wordpress.com/2009/10/29/work-days-calculation-with-c/
P.S. Solutions posted above making me sic for some reason.
P.S.的解决方案让我有了一些理由。
#3
33
I know this question is already solved, but I thought I could provide a more straightforward-looking answer that may help other visitors in the future.
我知道这个问题已经解决了,但是我想我可以提供一个更直观的答案,可以帮助未来的其他游客。
Here's my take at it:
这是我的看法:
public int GetWorkingDays(DateTime from, DateTime to)
{
var dayDifference = (int)to.Subtract(from).TotalDays;
return Enumerable
.Range(1, dayDifference)
.Select(x => from.AddDays(x))
.Count(x => x.DayOfWeek != DayOfWeek.Saturday && x.DayOfWeek != DayOfWeek.Sunday);
}
This was my original submission:
这是我最初的作品:
public int GetWorkingDays(DateTime from, DateTime to)
{
var totalDays = 0;
for (var date = from; date < to; date = date.AddDays(1))
{
if (date.DayOfWeek != DayOfWeek.Saturday
&& date.DayOfWeek != DayOfWeek.Sunday)
totalDays++;
}
return totalDays;
}
#4
21
Define an Extension Method on DateTime like so:
在DateTime上定义一个扩展方法:
public static class DateTimeExtensions
{
public static bool IsWorkingDay(this DateTime date)
{
return date.DayOfWeek != DayOfWeek.Saturday
&& date.DayOfWeek != DayOfWeek.Sunday;
}
}
Then, use is within a Where clause to filter a broader list of dates:
然后,使用在Where子句中筛选更广泛的日期列表:
var allDates = GetDates(); // method which returns a list of dates
// filter dates by working day's
var countOfWorkDays = allDates
.Where(day => day.IsWorkingDay())
.Count() ;
#5
9
I used the following code to also take in to account bank holidays:
我用下面的代码也考虑到银行假期:
public class WorkingDays
{
public List<DateTime> GetHolidays()
{
var client = new WebClient();
var json = client.DownloadString("https://www.gov.uk/bank-holidays.json");
var js = new JavaScriptSerializer();
var holidays = js.Deserialize <Dictionary<string, Holidays>>(json);
return holidays["england-and-wales"].events.Select(d => d.date).ToList();
}
public int GetWorkingDays(DateTime from, DateTime to)
{
var totalDays = 0;
var holidays = GetHolidays();
for (var date = from.AddDays(1); date <= to; date = date.AddDays(1))
{
if (date.DayOfWeek != DayOfWeek.Saturday
&& date.DayOfWeek != DayOfWeek.Sunday
&& !holidays.Contains(date))
totalDays++;
}
return totalDays;
}
}
public class Holidays
{
public string division { get; set; }
public List<Event> events { get; set; }
}
public class Event
{
public DateTime date { get; set; }
public string notes { get; set; }
public string title { get; set; }
}
And Unit Tests:
和单元测试:
[TestClass]
public class WorkingDays
{
[TestMethod]
public void SameDayIsZero()
{
var service = new WorkingDays();
var from = new DateTime(2013, 8, 12);
Assert.AreEqual(0, service.GetWorkingDays(from, from));
}
[TestMethod]
public void CalculateDaysInWorkingWeek()
{
var service = new WorkingDays();
var from = new DateTime(2013, 8, 12);
var to = new DateTime(2013, 8, 16);
Assert.AreEqual(4, service.GetWorkingDays(from, to), "Mon - Fri = 4");
Assert.AreEqual(1, service.GetWorkingDays(from, new DateTime(2013, 8, 13)), "Mon - Tues = 1");
}
[TestMethod]
public void NotIncludeWeekends()
{
var service = new WorkingDays();
var from = new DateTime(2013, 8, 9);
var to = new DateTime(2013, 8, 16);
Assert.AreEqual(5, service.GetWorkingDays(from, to), "Fri - Fri = 5");
Assert.AreEqual(2, service.GetWorkingDays(from, new DateTime(2013, 8, 13)), "Fri - Tues = 2");
Assert.AreEqual(1, service.GetWorkingDays(from, new DateTime(2013, 8, 12)), "Fri - Mon = 1");
}
[TestMethod]
public void AccountForHolidays()
{
var service = new WorkingDays();
var from = new DateTime(2013, 8, 23);
Assert.AreEqual(0, service.GetWorkingDays(from, new DateTime(2013, 8, 26)), "Fri - Mon = 0");
Assert.AreEqual(1, service.GetWorkingDays(from, new DateTime(2013, 8, 27)), "Fri - Tues = 1");
}
}
#6
4
Here's some code for that purpose, with swedish holidays but you can adapt what holidays to count. Note that I added a limit you might want to remove, but it was for a web-based system and I didnt want anyone to enter some huge date to hog the process
这里有一些关于这个目的的代码,瑞典的假期,但是你可以适应假期的计算。注意,我添加了一个您可能想要删除的限制,但它是基于一个基于web的系统,我不希望任何人输入某个重要的日期来占用这个过程。
public static int GetWorkdays(DateTime from ,DateTime to)
{
int limit = 9999;
int counter = 0;
DateTime current = from;
int result = 0;
if (from > to)
{
DateTime temp = from;
from = to;
to = temp;
}
if (from >= to)
{
return 0;
}
while (current <= to && counter < limit)
{
if (IsSwedishWorkday(current))
{
result++;
}
current = current.AddDays(1);
counter++;
}
return result;
}
public static bool IsSwedishWorkday(DateTime date)
{
return (!IsSwedishHoliday(date) && date.DayOfWeek != DayOfWeek.Saturday && date.DayOfWeek != DayOfWeek.Sunday);
}
public static bool IsSwedishHoliday(DateTime date)
{
return (
IsSameDay(GetEpiphanyDay(date.Year), date) ||
IsSameDay(GetMayDay(date.Year), date) ||
IsSameDay(GetSwedishNationalDay(date.Year), date) ||
IsSameDay(GetChristmasDay(date.Year), date) ||
IsSameDay(GetBoxingDay(date.Year), date) ||
IsSameDay(GetGoodFriday(date.Year), date) ||
IsSameDay(GetAscensionDay(date.Year), date) ||
IsSameDay(GetAllSaintsDay(date.Year), date) ||
IsSameDay(GetMidsummersDay(date.Year), date) ||
IsSameDay(GetPentecostDay(date.Year), date) ||
IsSameDay(GetEasterMonday(date.Year), date) ||
IsSameDay(GetNewYearsDay(date.Year), date) ||
IsSameDay(GetEasterDay(date.Year), date)
);
}
// Trettondagen
public static DateTime GetEpiphanyDay(int year)
{
return new DateTime(year, 1, 6);
}
// Första maj
public static DateTime GetMayDay(int year)
{
return new DateTime(year,5,1);
}
// Juldagen
public static DateTime GetSwedishNationalDay(int year)
{
return new DateTime(year, 6, 6);
}
// Juldagen
public static DateTime GetNewYearsDay(int year)
{
return new DateTime(year,1,1);
}
// Juldagen
public static DateTime GetChristmasDay(int year)
{
return new DateTime(year,12,25);
}
// Annandag jul
public static DateTime GetBoxingDay(int year)
{
return new DateTime(year, 12, 26);
}
// Långfredagen
public static DateTime GetGoodFriday(int year)
{
return GetEasterDay(year).AddDays(-3);
}
// Kristi himmelsfärdsdag
public static DateTime GetAscensionDay(int year)
{
return GetEasterDay(year).AddDays(5*7+4);
}
// Midsommar
public static DateTime GetAllSaintsDay(int year)
{
DateTime result = new DateTime(year,10,31);
while (result.DayOfWeek != DayOfWeek.Saturday)
{
result = result.AddDays(1);
}
return result;
}
// Midsommar
public static DateTime GetMidsummersDay(int year)
{
DateTime result = new DateTime(year, 6, 20);
while (result.DayOfWeek != DayOfWeek.Saturday)
{
result = result.AddDays(1);
}
return result;
}
// Pingstdagen
public static DateTime GetPentecostDay(int year)
{
return GetEasterDay(year).AddDays(7 * 7);
}
// Annandag påsk
public static DateTime GetEasterMonday(int year)
{
return GetEasterDay(year).AddDays(1);
}
public static DateTime GetEasterDay(int y)
{
double c;
double n;
double k;
double i;
double j;
double l;
double m;
double d;
c = System.Math.Floor(y / 100.0);
n = y - 19 * System.Math.Floor(y / 19.0);
k = System.Math.Floor((c - 17) / 25.0);
i = c - System.Math.Floor(c / 4) - System.Math.Floor((c - k) / 3) + 19 * n + 15;
i = i - 30 * System.Math.Floor(i / 30);
i = i - System.Math.Floor(i / 28) * (1 - System.Math.Floor(i / 28) * System.Math.Floor(29 / (i + 1)) * System.Math.Floor((21 - n) / 11));
j = y + System.Math.Floor(y / 4.0) + i + 2 - c + System.Math.Floor(c / 4);
j = j - 7 * System.Math.Floor(j / 7);
l = i - j;
m = 3 + System.Math.Floor((l + 40) / 44);// month
d = l + 28 - 31 * System.Math.Floor(m / 4);// day
double days = ((m == 3) ? d : d + 31);
DateTime result = new DateTime(y, 3, 1).AddDays(days-1);
return result;
}
#7
4
Well this has been beaten to death. :) However I'm still going to provide another answer because I needed something a bit different. This solution is different in that it returns a Business TimeSpan between the start and end, and you can set the business hours of the day, and add holidays. So you can use it to calculate if it happens within a day, across days, over weekends, and even holidays. And you can get just the business days or not by just getting what you need from the returned TimeSpan object. And the way it uses lists of days, you can see how very easy it would be to add the list of non-work days if it's not the typical Sat and Sun. And I tested for a year, and it seems super fast.
这已经被打死了。但是我还是会提供另一个答案,因为我需要一些不同的东西。这个解决方案不同,它在开始和结束之间返回一个业务时间间隔,您可以设置一天的营业时间,并添加假日。所以你可以用它来计算它是否发生在一天之内,几天,周末,甚至节假日。你只需要从返回的TimeSpan对象中得到你需要的东西就可以得到营业时间。它使用天数列表的方式,你可以看到,如果不是典型的Sat和Sun,就可以很容易地添加非工作日列表。我做了一年的测试,看起来非常快。
I just hope the pasting of the code is accurate. But I know it works.
我只是希望代码的粘贴是准确的。但我知道这行得通。
public static TimeSpan GetBusinessTimespanBetween(
DateTime start, DateTime end,
TimeSpan workdayStartTime, TimeSpan workdayEndTime,
List<DateTime> holidays = null)
{
if (end < start)
throw new ArgumentException("start datetime must be before end datetime.");
// Just create an empty list for easier coding.
if (holidays == null) holidays = new List<DateTime>();
if (holidays.Where(x => x.TimeOfDay.Ticks > 0).Any())
throw new ArgumentException("holidays can not have a TimeOfDay, only the Date.");
var nonWorkDays = new List<DayOfWeek>() { DayOfWeek.Saturday, DayOfWeek.Sunday };
var startTime = start.TimeOfDay;
// If the start time is before the starting hours, set it to the starting hour.
if (startTime < workdayStartTime) startTime = workdayStartTime;
var timeBeforeEndOfWorkDay = workdayEndTime - startTime;
// If it's after the end of the day, then this time lapse doesn't count.
if (timeBeforeEndOfWorkDay.TotalSeconds < 0) timeBeforeEndOfWorkDay = new TimeSpan();
// If start is during a non work day, it doesn't count.
if (nonWorkDays.Contains(start.DayOfWeek)) timeBeforeEndOfWorkDay = new TimeSpan();
else if (holidays.Contains(start.Date)) timeBeforeEndOfWorkDay = new TimeSpan();
var endTime = end.TimeOfDay;
// If the end time is after the ending hours, set it to the ending hour.
if (endTime > workdayEndTime) endTime = workdayEndTime;
var timeAfterStartOfWorkDay = endTime - workdayStartTime;
// If it's before the start of the day, then this time lapse doesn't count.
if (timeAfterStartOfWorkDay.TotalSeconds < 0) timeAfterStartOfWorkDay = new TimeSpan();
// If end is during a non work day, it doesn't count.
if (nonWorkDays.Contains(end.DayOfWeek)) timeAfterStartOfWorkDay = new TimeSpan();
else if (holidays.Contains(end.Date)) timeAfterStartOfWorkDay = new TimeSpan();
// Easy scenario if the times are during the day day.
if (start.Date.CompareTo(end.Date) == 0)
{
if (nonWorkDays.Contains(start.DayOfWeek)) return new TimeSpan();
else if (holidays.Contains(start.Date)) return new TimeSpan();
return endTime - startTime;
}
else
{
var timeBetween = end - start;
var daysBetween = (int)Math.Floor(timeBetween.TotalDays);
var dailyWorkSeconds = (int)Math.Floor((workdayEndTime - workdayStartTime).TotalSeconds);
var businessDaysBetween = 0;
// Now the fun begins with calculating the actual Business days.
if (daysBetween > 0)
{
var nextStartDay = start.AddDays(1).Date;
var dayBeforeEnd = end.AddDays(-1).Date;
for (DateTime d = nextStartDay; d <= dayBeforeEnd; d = d.AddDays(1))
{
if (nonWorkDays.Contains(d.DayOfWeek)) continue;
else if (holidays.Contains(d.Date)) continue;
businessDaysBetween++;
}
}
var dailyWorkSecondsToAdd = dailyWorkSeconds * businessDaysBetween;
var output = timeBeforeEndOfWorkDay + timeAfterStartOfWorkDay;
output = output + new TimeSpan(0, 0, dailyWorkSecondsToAdd);
return output;
}
}
And here is test code: Note that you just have to put this function in a class called DateHelper for the test code to work.
这里是测试代码:请注意,您只需要将这个函数放入一个名为DateHelper的类中,以便测试代码能够工作。
[TestMethod]
public void TestGetBusinessTimespanBetween()
{
var workdayStart = new TimeSpan(8, 0, 0);
var workdayEnd = new TimeSpan(17, 0, 0);
var holidays = new List<DateTime>()
{
new DateTime(2018, 1, 15), // a Monday
new DateTime(2018, 2, 15) // a Thursday
};
var testdata = new[]
{
new
{
expectedMinutes = 0,
start = new DateTime(2016, 10, 19, 9, 50, 0),
end = new DateTime(2016, 10, 19, 9, 50, 0)
},
new
{
expectedMinutes = 10,
start = new DateTime(2016, 10, 19, 9, 50, 0),
end = new DateTime(2016, 10, 19, 10, 0, 0)
},
new
{
expectedMinutes = 5,
start = new DateTime(2016, 10, 19, 7, 50, 0),
end = new DateTime(2016, 10, 19, 8, 5, 0)
},
new
{
expectedMinutes = 5,
start = new DateTime(2016, 10, 19, 16, 55, 0),
end = new DateTime(2016, 10, 19, 17, 5, 0)
},
new
{
expectedMinutes = 15,
start = new DateTime(2016, 10, 19, 16, 50, 0),
end = new DateTime(2016, 10, 20, 8, 5, 0)
},
new
{
expectedMinutes = 10,
start = new DateTime(2016, 10, 19, 16, 50, 0),
end = new DateTime(2016, 10, 20, 7, 55, 0)
},
new
{
expectedMinutes = 5,
start = new DateTime(2016, 10, 19, 17, 10, 0),
end = new DateTime(2016, 10, 20, 8, 5, 0)
},
new
{
expectedMinutes = 0,
start = new DateTime(2016, 10, 19, 17, 10, 0),
end = new DateTime(2016, 10, 20, 7, 5, 0)
},
new
{
expectedMinutes = 545,
start = new DateTime(2016, 10, 19, 12, 10, 0),
end = new DateTime(2016, 10, 20, 12, 15, 0)
},
// Spanning multiple weekdays
new
{
expectedMinutes = 835,
start = new DateTime(2016, 10, 19, 12, 10, 0),
end = new DateTime(2016, 10, 21, 8, 5, 0)
},
// Spanning multiple weekdays
new
{
expectedMinutes = 1375,
start = new DateTime(2016, 10, 18, 12, 10, 0),
end = new DateTime(2016, 10, 21, 8, 5, 0)
},
// Spanning from a Thursday to a Tuesday, 5 mins short of complete day.
new
{
expectedMinutes = 1615,
start = new DateTime(2016, 10, 20, 12, 10, 0),
end = new DateTime(2016, 10, 25, 12, 5, 0)
},
// Spanning from a Thursday to a Tuesday, 5 mins beyond complete day.
new
{
expectedMinutes = 1625,
start = new DateTime(2016, 10, 20, 12, 10, 0),
end = new DateTime(2016, 10, 25, 12, 15, 0)
},
// Spanning from a Friday to a Monday, 5 mins beyond complete day.
new
{
expectedMinutes = 545,
start = new DateTime(2016, 10, 21, 12, 10, 0),
end = new DateTime(2016, 10, 24, 12, 15, 0)
},
// Spanning from a Friday to a Monday, 5 mins short complete day.
new
{
expectedMinutes = 535,
start = new DateTime(2016, 10, 21, 12, 10, 0),
end = new DateTime(2016, 10, 24, 12, 5, 0)
},
// Spanning from a Saturday to a Monday, 5 mins short complete day.
new
{
expectedMinutes = 245,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2016, 10, 24, 12, 5, 0)
},
// Spanning from a Saturday to a Sunday, 5 mins beyond complete day.
new
{
expectedMinutes = 0,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2016, 10, 23, 12, 15, 0)
},
// Times within the same Saturday.
new
{
expectedMinutes = 0,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2016, 10, 23, 12, 15, 0)
},
// Spanning from a Saturday to the Sunday next week.
new
{
expectedMinutes = 2700,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2016, 10, 30, 12, 15, 0)
},
// Spanning a year.
new
{
expectedMinutes = 143355,
start = new DateTime(2016, 10, 22, 12, 10, 0),
end = new DateTime(2017, 10, 30, 12, 15, 0)
},
// Spanning a year with 2 holidays.
new
{
expectedMinutes = 142815,
start = new DateTime(2017, 10, 22, 12, 10, 0),
end = new DateTime(2018, 10, 30, 12, 15, 0)
},
};
foreach (var item in testdata)
{
Assert.AreEqual(item.expectedMinutes,
DateHelper.GetBusinessTimespanBetween(
item.start, item.end,
workdayStart, workdayEnd,
holidays)
.TotalMinutes);
}
}
#8
3
This solution avoids iteration, works for both +ve and -ve weekday differences and includes a unit test suite to regression against the slower method of counting weekdays. I've also include a concise method to add weekdays also works in the same non-iterative way.
这一解决方案避免了迭代,既适用于+ve和-ve工作日的差异,还包括一个单元测试套件,以与较慢的计算工作日的方法进行回归。我还包括了一个简单的添加工作日的方法,同样以非迭代的方式工作。
Unit tests cover a few thousand date combinations in order to exhaustively test all start/end weekday combinations with both small and large date ranges.
单元测试涵盖几千个日期组合,以详尽地测试所有的开始/结束工作日的组合,同时包含小的和大的日期范围。
Important: We make the assumption that we are counting days by excluding the start date and including the end date. This is important when counting weekdays as the specific start/end days that you include/exclude affect the result. This also ensures that the difference between two equal days is always zero and that we only include full working days as typically you want the answer to be correct for any time on the current start date (often today) and include the full end date (e.g. a due date).
重要的是:我们假定我们在计算天数的时候不包括开始日期,包括结束日期。这一点在计算工作日时是很重要的,因为包含/排除的特定的开始/结束日期会影响结果。这也确保了两个相等的天数之间的差值总是为零,而且我们只包含了完整的工作日,通常你希望在当前的开始日期(通常是今天)的任何时候都正确,并包括完整的结束日期(例如,截止日期)。
NOTE: This code needs an additional adjustment for holidays but in keeping with the above assumption, this code must exclude holidays on the start date.
注:此代码需要额外的假期调整,但按照上述假设,此代码必须在开始日期不包含假日。
Add weekdays:
增加工作日:
private static readonly int[,] _addOffset =
{
// 0 1 2 3 4
{0, 1, 2, 3, 4}, // Su 0
{0, 1, 2, 3, 4}, // M 1
{0, 1, 2, 3, 6}, // Tu 2
{0, 1, 4, 5, 6}, // W 3
{0, 1, 4, 5, 6}, // Th 4
{0, 3, 4, 5, 6}, // F 5
{0, 2, 3, 4, 5}, // Sa 6
};
public static DateTime AddWeekdays(this DateTime date, int weekdays)
{
int extraDays = weekdays % 5;
int addDays = weekdays >= 0
? (weekdays / 5) * 7 + _addOffset[(int)date.DayOfWeek, extraDays]
: (weekdays / 5) * 7 - _addOffset[6 - (int)date.DayOfWeek, -extraDays];
return date.AddDays(addDays);
}
Compute weekday difference:
计算工作日的区别:
static readonly int[,] _diffOffset =
{
// Su M Tu W Th F Sa
{0, 1, 2, 3, 4, 5, 5}, // Su
{4, 0, 1, 2, 3, 4, 4}, // M
{3, 4, 0, 1, 2, 3, 3}, // Tu
{2, 3, 4, 0, 1, 2, 2}, // W
{1, 2, 3, 4, 0, 1, 1}, // Th
{0, 1, 2, 3, 4, 0, 0}, // F
{0, 1, 2, 3, 4, 5, 0}, // Sa
};
public static int GetWeekdaysDiff(this DateTime dtStart, DateTime dtEnd)
{
int daysDiff = (int)(dtEnd - dtStart).TotalDays;
return daysDiff >= 0
? 5 * (daysDiff / 7) + _diffOffset[(int) dtStart.DayOfWeek, (int) dtEnd.DayOfWeek]
: 5 * (daysDiff / 7) - _diffOffset[6 - (int) dtStart.DayOfWeek, 6 - (int) dtEnd.DayOfWeek];
}
I found that most other solutions on stack overflow were either slow (iterative) or overly complex and many were just plain incorrect. Moral of the story is ... Don't trust it unless you've exhaustively tested it!!
我发现,stack overflow上的大多数其他解决方案要么是缓慢的(迭代的)要么是过于复杂的,而且很多都是不正确的。这个故事的寓意是……除非你对它进行了详尽的测试,否则不要相信它!!
Unit tests based on NUnit Combinatorial testing and ShouldBe NUnit extension.
单元测试基于NUnit组合测试,应该是NUnit扩展。
[TestFixture]
public class DateTimeExtensionsTests
{
/// <summary>
/// Exclude start date, Include end date
/// </summary>
/// <param name="dtStart"></param>
/// <param name="dtEnd"></param>
/// <returns></returns>
private IEnumerable<DateTime> GetDateRange(DateTime dtStart, DateTime dtEnd)
{
Console.WriteLine(@"dtStart={0:yy-MMM-dd ddd}, dtEnd={1:yy-MMM-dd ddd}", dtStart, dtEnd);
TimeSpan diff = dtEnd - dtStart;
Console.WriteLine(diff);
if (dtStart <= dtEnd)
{
for (DateTime dt = dtStart.AddDays(1); dt <= dtEnd; dt = dt.AddDays(1))
{
Console.WriteLine(@"dt={0:yy-MMM-dd ddd}", dt);
yield return dt;
}
}
else
{
for (DateTime dt = dtStart.AddDays(-1); dt >= dtEnd; dt = dt.AddDays(-1))
{
Console.WriteLine(@"dt={0:yy-MMM-dd ddd}", dt);
yield return dt;
}
}
}
[Test, Combinatorial]
public void TestGetWeekdaysDiff(
[Values(1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 30)]
int startDay,
[Values(1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 30)]
int endDay,
[Values(7)]
int startMonth,
[Values(7)]
int endMonth)
{
// Arrange
DateTime dtStart = new DateTime(2016, startMonth, startDay);
DateTime dtEnd = new DateTime(2016, endMonth, endDay);
int nDays = GetDateRange(dtStart, dtEnd)
.Count(dt => dt.DayOfWeek != DayOfWeek.Saturday && dt.DayOfWeek != DayOfWeek.Sunday);
if (dtEnd < dtStart) nDays = -nDays;
Console.WriteLine(@"countBusDays={0}", nDays);
// Act / Assert
dtStart.GetWeekdaysDiff(dtEnd).ShouldBe(nDays);
}
[Test, Combinatorial]
public void TestAddWeekdays(
[Values(1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 30)]
int startDay,
[Values(0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 30)]
int weekdays)
{
DateTime dtStart = new DateTime(2016, 7, startDay);
DateTime dtEnd1 = dtStart.AddWeekdays(weekdays); // ADD
dtStart.GetWeekdaysDiff(dtEnd1).ShouldBe(weekdays);
DateTime dtEnd2 = dtStart.AddWeekdays(-weekdays); // SUBTRACT
dtStart.GetWeekdaysDiff(dtEnd2).ShouldBe(-weekdays);
}
}
#9
1
I think none of the above answers are actually correct. None of them solves all the special cases such as when the dates starts and ends on the middle of a weekend, when the date starts on a Friday and ends on next Monday, etc. On top of that, they all round the calculations to whole days, so if the start date is in the middle of a saturday for example, it will substract a whole day from the working days, giving wrong results...
我认为以上的答案都不正确。没有人解决时所有的特殊情况,如日期开始和结束在一个周末,当日期开始在周五将于下周一结束,等。最重要的是,他们都在计算整个天,如果开始日期是在周六为例,它将减去一天工作日,给出错误的结果……
Anyway, here is my solution that is quite efficient and simple and works for all cases. The trick is just to find the previous Monday for start and end dates, and then do a small compensation when start and end happens during the weekend:
无论如何,这是我的解决方案,它非常高效,简单,适用于所有情况。诀窍就在于找到周一开始和结束的日期,然后在周末开始和结束时做一个小小的补偿:
public double WorkDays(DateTime startDate, DateTime endDate){
double weekendDays;
double days = endDate.Subtract(startDate).TotalDays;
if(days<0) return 0;
DateTime startMonday = startDate.AddDays(DayOfWeek.Monday - startDate.DayOfWeek).Date;
DateTime endMonday = endDate.AddDays(DayOfWeek.Monday - endDate.DayOfWeek).Date;
weekendDays = ((endMonday.Subtract(startMonday).TotalDays) / 7) * 2;
// compute fractionary part of weekend days
double diffStart = startDate.Subtract(startMonday).TotalDays - 5;
double diffEnd = endDate.Subtract(endMonday).TotalDays - 5;
// compensate weekenddays
if(diffStart>0) weekendDays -= diffStart;
if(diffEnd>0) weekendDays += diffEnd;
return days - weekendDays;
}
#10
1
Here's a quick sample code. It's a class method, so will only work inside of your class. If you want it to be static
, change the signature to private static
(or public static
).
这里有一个快速的示例代码。这是一个类方法,所以只在类内部工作。如果您希望它是静态的,请将签名更改为私有静态(或公共静态)。
private IEnumerable<DateTime> GetWorkingDays(DateTime sd, DateTime ed)
{
for (var d = sd; d <= ed; d.AddDays(1))
if (d.DayOfWeek != DayOfWeek.Saturday && d.DayOfWeek != DayOfWeek.Sunday)
yield return d;
}
This method creates a loop variable d
, initializes it to the start day, sd
, then increments by one day each iteration (d.AddDays(1)
).
这个方法创建一个循环变量d,初始化它到开始日,sd,然后每一次迭代递增一天(d. adddays(1))。
It returns the desired values using yield
, which creates an iterator
. The cool thing about iterators is that they don't hold all of the values of the IEnumerable
in memory, only calling each one sequentially. This means that you can call this method from the dawn of time to now without having to worry about running out of memory.
它使用yield(创建迭代器)返回所需的值。迭代器最酷的地方是它们不包含内存中IEnumerable的所有值,只是按顺序调用它们。这意味着您可以从时间的黎明调用此方法,而不必担心内存耗尽。
#11
0
I'll just share my solution. It worked for me, maybe I just don't notice/know that theres a bug. I started by getting the first incomplete week if there's any. a complete week was from sunday for saturday, so if the (int)_now.DayOfWeek was not 0(Sunday), the first week was incomplete.
我来分享我的解决方案。它对我起作用了,也许我只是没注意到/知道有bug。我从第一个不完整的周开始,如果有的话。一个完整的星期是从星期天开始的星期六,所以如果(int)现在。周日不是0(星期日),第一周是不完整的。
I just subtract 1 to first weeks count for the first week's saturday then add it to new count;
我只是把第一周的第一个星期减去1,然后把它加到新的数里;
Then I get the last incomplete week, then subtract 1 for it's sunday then add to new count.
然后我得到最后一个不完整的星期,然后减去1,因为它是星期天,然后增加新的计数。
Then finally, the number of complete weeks multiply by 5(weekdays) was added to new count.
最后,将完整的周数乘以5(工作日)增加到新的计数。
public int RemoveNonWorkingDays(int numberOfDays){
int workingDays = 0;
int firstWeek = 7 - (int)_now.DayOfWeek;
if(firstWeek < 7){
if(firstWeek > numberOfDays)
return numberOfDays;
workingDays += firstWeek-1;
numberOfDays -= firstWeek;
}
int lastWeek = numberOfDays % 7;
if(lastWeek > 0){
numberOfDays -= lastWeek;
workingDays += lastWeek - 1;
}
workingDays += (numberOfDays/7)*5;
return workingDays;
}
#12
0
I was having trouble finding a solid TSQL version of this code. Below is essentially a conversion of the C# code here with addition of the Holiday table which should be used to pre-calculate holidays.
我很难找到一个可靠的TSQL版本的代码。下面是c#代码的转换,添加了假日表,应该用来提前计算假期。
CREATE TABLE dbo.Holiday
(
HolidayDt DATE NOT NULL,
Name NVARCHAR(50) NOT NULL,
IsWeekday BIT NOT NULL,
CONSTRAINT PK_Holiday PRIMARY KEY (HolidayDt)
)
GO
CREATE INDEX IDX_Holiday ON Holiday (HolidayDt, IsWeekday)
GO
CREATE function dbo.GetBusinessDays
(
@FirstDay datetime,
@LastDay datetime
)
RETURNS INT
AS
BEGIN
DECLARE @BusinessDays INT, @FullWeekCount INT
SELECT @FirstDay = CONVERT(DATETIME,CONVERT(DATE,@FirstDay))
, @LastDay = CONVERT(DATETIME,CONVERT(DATE,@LastDay))
IF @FirstDay > @LastDay
RETURN NULL;
SELECT @BusinessDays = DATEDIFF(DAY, @FirstDay, @LastDay) + 1
SELECT @FullWeekCount = @BusinessDays / 7;
-- find out if there are weekends during the time exceedng the full weeks
IF @BusinessDays > (@FullWeekCount * 7)
BEGIN
-- we are here to find out if there is a 1-day or 2-days weekend
-- in the time interval remaining after subtracting the complete weeks
DECLARE @firstDayOfWeek INT, @lastDayOfWeek INT;
SELECT @firstDayOfWeek = DATEPART(DW, @FirstDay), @lastDayOfWeek = DATEPART(DW, @LastDay);
IF @lastDayOfWeek < @firstDayOfWeek
SELECT @lastDayOfWeek = @lastDayOfWeek + 7;
IF @firstDayOfWeek <= 6
BEGIN
IF (@lastDayOfWeek >= 7) --Both Saturday and Sunday are in the remaining time interval
BEGIN
SELECT @BusinessDays = @BusinessDays - 2
END
ELSE IF @lastDayOfWeek>=6 --Only Saturday is in the remaining time interval
BEGIN
SELECT @BusinessDays = @BusinessDays - 1
END
END
ELSE IF @firstDayOfWeek <= 7 AND @lastDayOfWeek >=7 -- Only Sunday is in the remaining time interval
BEGIN
SELECT @BusinessDays = @BusinessDays - 1
END
END
-- subtract the weekends during the full weeks in the interval
DECLARE @Holidays INT;
SELECT @Holidays = COUNT(*)
FROM Holiday
WHERE HolidayDt BETWEEN @FirstDay AND @LastDay
AND IsWeekday = CAST(1 AS BIT)
SELECT @BusinessDays = @BusinessDays - (@FullWeekCount + @FullWeekCount) -- - @Holidays
RETURN @BusinessDays
END
#13
0
int BusinessDayDifference(DateTime Date1, DateTime Date2)
{
int Sign = 1;
if (Date2 > Date1)
{
Sign = -1;
DateTime TempDate = Date1;
Date1 = Date2;
Date2 = TempDate;
}
int BusDayDiff = (int)(Date1.Date - Date2.Date).TotalDays;
if (Date1.DayOfWeek == DayOfWeek.Saturday)
BusDayDiff -= 1;
if (Date2.DayOfWeek == DayOfWeek.Sunday)
BusDayDiff -= 1;
int Week1 = GetWeekNum(Date1);
int Week2 = GetWeekNum(Date2);
int WeekDiff = Week1 - Week2;
BusDayDiff -= WeekDiff * 2;
foreach (DateTime Holiday in Holidays)
if (Date1 >= Holiday && Date2 <= Holiday)
BusDayDiff--;
BusDayDiff *= Sign;
return BusDayDiff;
}
private int GetWeekNum(DateTime Date)
{
return (int)(Date.AddDays(-(int)Date.DayOfWeek).Ticks / TimeSpan.TicksPerDay / 7);
}
#14
0
Here is one very simple solution for this problem. We have starting date, end date and "for loop" for encreasing the day and calculating to see if it's a workday or a weekend by converting to string DayOfWeek.
这里有一个非常简单的解决方法。我们有开始日期、结束日期和“for循环”,以确定日期和计算,看看它是一个工作日还是一个周末,通过转换为string DayOfWeek。
class Program
{
static void Main(string[] args)
{
DateTime day = new DateTime();
Console.Write("Inser your end date (example: 01/30/2015): ");
DateTime endDate = DateTime.Parse(Console.ReadLine());
int numberOfDays = 0;
for (day = DateTime.Now.Date; day.Date < endDate.Date; day = day.Date.AddDays(1))
{
string dayToString = Convert.ToString(day.DayOfWeek);
if (dayToString != "Saturday" && dayToString != "Sunday") numberOfDays++;
}
Console.WriteLine("Number of working days (not including local holidays) between two dates is "+numberOfDays);
}
}
#15
0
Based on the comment marked as answer and patch recommended , as well as -> This version wants to convert the Days to Business-Hours ... Considers Same day hours as well.
根据所推荐的答案和补丁,以及->,这个版本希望将这些天转换成营业时间……同时考虑当天的工作时间。
/// <summary>
/// Calculates number of business days, taking into account:
/// - weekends (Saturdays and Sundays)
/// - bank holidays in the middle of the week
/// </summary>
/// <param name="firstDay">First day in the time interval</param>
/// <param name="lastDay">Last day in the time interval</param>
/// <param name="bankHolidays">List of bank holidays excluding weekends</param>
/// <returns>Number of business hours during the 'span'</returns>
public static int BusinessHoursUntil(DateTime firstDay, DateTime lastDay, params DateTime[] bankHolidays)
{
var original_firstDay = firstDay;
var original_lastDay = lastDay;
firstDay = firstDay.Date;
lastDay = lastDay.Date;
if (firstDay > lastDay)
return -1; //// throw new ArgumentException("Incorrect last day " + lastDay);
TimeSpan span = lastDay - firstDay;
int businessDays = span.Days + 1;
int fullWeekCount = businessDays / 7;
// find out if there are weekends during the time exceedng the full weeks
if (businessDays > fullWeekCount * 7)
{
// we are here to find out if there is a 1-day or 2-days weekend
// in the time interval remaining after subtracting the complete weeks
int firstDayOfWeek = firstDay.DayOfWeek == DayOfWeek.Sunday ? 7 : (int)firstDay.DayOfWeek;
int lastDayOfWeek = lastDay.DayOfWeek == DayOfWeek.Sunday ? 7 : (int)lastDay.DayOfWeek;
if (lastDayOfWeek < firstDayOfWeek)
lastDayOfWeek += 7;
if (firstDayOfWeek <= 6)
{
if (lastDayOfWeek >= 7)// Both Saturday and Sunday are in the remaining time interval
businessDays -= 2;
else if (lastDayOfWeek >= 6)// Only Saturday is in the remaining time interval
businessDays -= 1;
}
else if (firstDayOfWeek <= 7 && lastDayOfWeek >= 7)// Only Sunday is in the remaining time interval
businessDays -= 1;
}
// subtract the weekends during the full weeks in the interval
businessDays -= fullWeekCount + fullWeekCount;
if (bankHolidays != null && bankHolidays.Any())
{
// subtract the number of bank holidays during the time interval
foreach (DateTime bankHoliday in bankHolidays)
{
DateTime bh = bankHoliday.Date;
if (firstDay <= bh && bh <= lastDay)
--businessDays;
}
}
int total_business_hours = 0;
if (firstDay.Date == lastDay.Date)
{//If on the same day, go granular with Hours from the Orginial_*Day values
total_business_hours = (int)(original_lastDay - original_firstDay).TotalHours;
}
else
{//Convert Business-Days to TotalHours
total_business_hours = (int)(firstDay.AddDays(businessDays).AddHours(firstDay.Hour) - firstDay).TotalHours;
}
return total_business_hours;
}
#16
0
using System;
namespace ConsoleApplication1
{
class Program
{
static void Main(string[] args)
{
DateTime start = new DateTime(2014, 1, 1);
DateTime stop = new DateTime(2014, 12, 31);
int totalWorkingDays = GetNumberOfWorkingDays(start, stop);
Console.WriteLine("There are {0} working days.", totalWorkingDays);
}
private static int GetNumberOfWorkingDays(DateTime start, DateTime stop)
{
TimeSpan interval = stop - start;
int totalWeek = interval.Days / 7;
int totalWorkingDays = 5 * totalWeek;
int remainingDays = interval.Days % 7;
for (int i = 0; i <= remainingDays; i++)
{
DayOfWeek test = (DayOfWeek)(((int)start.DayOfWeek + i) % 7);
if (test >= DayOfWeek.Monday && test <= DayOfWeek.Friday)
totalWorkingDays++;
}
return totalWorkingDays;
}
}
}
#17
0
I just improved @Alexander and @Slauma answer to support a business week as a parameter, for cases where saturday is a business day, or even cases where there is just a couple of days of the week that are considered business days:
我只是改进了@Alexander和@Slauma的答案来支持商业周刊作为一个参数,在星期六是工作日的情况下,甚至是一周中有几天被视为工作日的情况:
/// <summary>
/// Calculate the number of business days between two dates, considering:
/// - Days of the week that are not considered business days.
/// - Holidays between these two dates.
/// </summary>
/// <param name="fDay">First day of the desired 'span'.</param>
/// <param name="lDay">Last day of the desired 'span'.</param>
/// <param name="BusinessDaysOfWeek">Days of the week that are considered to be business days, if NULL considers monday, tuesday, wednesday, thursday and friday as business days of the week.</param>
/// <param name="Holidays">Holidays, if NULL, considers no holiday.</param>
/// <returns>Number of business days during the 'span'</returns>
public static int BusinessDaysUntil(this DateTime fDay, DateTime lDay, DayOfWeek[] BusinessDaysOfWeek = null, DateTime[] Holidays = null)
{
if (BusinessDaysOfWeek == null)
BusinessDaysOfWeek = new DayOfWeek[] { DayOfWeek.Monday, DayOfWeek.Tuesday, DayOfWeek.Wednesday, DayOfWeek.Thursday, DayOfWeek.Friday };
if (Holidays == null)
Holidays = new DateTime[] { };
fDay = fDay.Date;
lDay = lDay.Date;
if (fDay > lDay)
throw new ArgumentException("Incorrect last day " + lDay);
int bDays = (lDay - fDay).Days + 1;
int fullWeekCount = bDays / 7;
int fullWeekCountMult = 7 - WeekDays.Length;
// Find out if there are weekends during the time exceedng the full weeks
if (bDays > (fullWeekCount * 7))
{
int fDayOfWeek = (int)fDay.DayOfWeek;
int lDayOfWeek = (int)lDay.DayOfWeek;
if (fDayOfWeek > lDayOfWeek)
lDayOfWeek += 7;
// If they are the same, we already covered it right before the Holiday subtraction
if (lDayOfWeek != fDayOfWeek)
{
// Here we need to see if any of the days between are considered business days
for (int i = fDayOfWeek; i <= lDayOfWeek; i++)
if (!WeekDays.Contains((DayOfWeek)(i > 6 ? i - 7 : i)))
bDays -= 1;
}
}
// Subtract the days that are not in WeekDays[] during the full weeks in the interval
bDays -= (fullWeekCount * fullWeekCountMult);
// Subtract the number of bank holidays during the time interval
bDays = bDays - Holidays.Select(x => x.Date).Count(x => fDay <= x && x <= lDay);
return bDays;
}
#18
0
Here is the function which we can use to calculate business days between two date. I'm not using holiday list as it can vary accross country/region.
这是我们可以用来计算两个日期之间的工作日的函数。我不使用假期清单,因为它可以改变国家/地区。
If we want to use it anyway we can take third argument as list of holiday and before incrementing count we should check that list does not contains d
如果我们想要使用它,我们可以将第三个参数作为假日列表,在增加计数之前,我们应该检查这个列表不包含d。
public static int GetBussinessDaysBetweenTwoDates(DateTime StartDate, DateTime EndDate)
{
if (StartDate > EndDate)
return -1;
int bd = 0;
for (DateTime d = StartDate; d < EndDate; d = d.AddDays(1))
{
if (d.DayOfWeek != DayOfWeek.Saturday && d.DayOfWeek != DayOfWeek.Sunday)
bd++;
}
return bd;
}
#19
0
I believe this could be a simpler way:
我相信这是一种更简单的方法:
public int BusinessDaysUntil(DateTime start, DateTime end, params DateTime[] bankHolidays)
{
int tld = (int)((end - start).TotalDays) + 1; //including end day
int not_buss_day = 2 * (tld / 7); //Saturday and Sunday
int rest = tld % 7; //rest.
if (rest > 0)
{
int tmp = (int)start.DayOfWeek - 1 + rest;
if (tmp == 6 || start.DayOfWeek == DayOfWeek.Sunday) not_buss_day++; else if (tmp > 6) not_buss_day += 2;
}
foreach (DateTime bankHoliday in bankHolidays)
{
DateTime bh = bankHoliday.Date;
if (!(bh.DayOfWeek == DayOfWeek.Saturday || bh.DayOfWeek == DayOfWeek.Sunday) && (start <= bh && bh <= end))
{
not_buss_day++;
}
}
return tld - not_buss_day;
}
#20
0
Here's yet another idea - this method allows to specify any working week and holidays.
这是另一个想法——这个方法可以指定任何工作周和假期。
The idea here is that we find the core of the date range from the first first working day of the week to the last weekend day of the week. This enables us to calculate the whole weeks easily (without iterating over all of the dates). All we need to do then is to add the working days that fall before the start and end of this core range.
这里的想法是,我们找到了日期范围的核心,从一周的第一个工作日,到周末的最后一个周末。这使我们能够轻松计算整个星期(不迭代所有日期)。我们需要做的就是添加在这个核心范围开始和结束之前的工作天。
public static int CalculateWorkingDays(
DateTime startDate,
DateTime endDate,
IList<DateTime> holidays,
DayOfWeek firstDayOfWeek,
DayOfWeek lastDayOfWeek)
{
// Make sure the defined working days run contiguously
if (lastDayOfWeek < firstDayOfWeek)
{
throw new Exception("Last day of week cannot fall before first day of week!");
}
// Create a list of the days of the week that make-up the weekend by working back
// from the firstDayOfWeek and forward from lastDayOfWeek to get the start and end
// the weekend
var weekendStart = lastDayOfWeek == DayOfWeek.Saturday ? DayOfWeek.Sunday : lastDayOfWeek + 1;
var weekendEnd = firstDayOfWeek == DayOfWeek.Sunday ? DayOfWeek.Saturday : firstDayOfWeek - 1;
var weekendDays = new List<DayOfWeek>();
var w = weekendStart;
do {
weekendDays.Add(w);
if (w == weekendEnd) break;
w = (w == DayOfWeek.Saturday) ? DayOfWeek.Sunday : w + 1;
} while (true);
// Force simple dates - no time
startDate = startDate.Date;
endDate = endDate.Date;
// Ensure a progessive date range
if (endDate < startDate)
{
var t = startDate;
startDate = endDate;
endDate = t;
}
// setup some working variables and constants
const int daysInWeek = 7; // yeah - really!
var actualStartDate = startDate; // this will end up on startOfWeek boundary
var actualEndDate = endDate; // this will end up on weekendEnd boundary
int workingDaysInWeek = daysInWeek - weekendDays.Count;
int workingDays = 0; // the result we are trying to find
int leadingDays = 0; // the number of working days leading up to the firstDayOfWeek boundary
int trailingDays = 0; // the number of working days counting back to the weekendEnd boundary
// Calculate leading working days
// if we aren't on the firstDayOfWeek we need to step forward to the nearest
if (startDate.DayOfWeek != firstDayOfWeek)
{
var d = startDate;
do {
if (d.DayOfWeek == firstDayOfWeek || d >= endDate)
{
actualStartDate = d;
break;
}
if (!weekendDays.Contains(d.DayOfWeek))
{
leadingDays++;
}
d = d.AddDays(1);
} while(true);
}
// Calculate trailing working days
// if we aren't on the weekendEnd we step back to the nearest
if (endDate >= actualStartDate && endDate.DayOfWeek != weekendEnd)
{
var d = endDate;
do {
if (d.DayOfWeek == weekendEnd || d < actualStartDate)
{
actualEndDate = d;
break;
}
if (!weekendDays.Contains(d.DayOfWeek))
{
trailingDays++;
}
d = d.AddDays(-1);
} while(true);
}
// Calculate the inclusive number of days between the actualStartDate and the actualEndDate
var coreDays = (actualEndDate - actualStartDate).Days + 1;
var noWeeks = coreDays / daysInWeek;
// add together leading, core and trailing days
workingDays += noWeeks * workingDaysInWeek;
workingDays += leadingDays;
workingDays += trailingDays;
// Finally remove any holidays that fall within the range.
if (holidays != null)
{
workingDays -= holidays.Count(h => h >= startDate && (h <= endDate));
}
return workingDays;
}
#21
0
Since I can't comment. There is one more issue with the accepted solution where bank holidays are subtracted even when they are situated in the weekend. Seeing how other input is checked, it is only fitting that this is as well.
因为我不能评论。还有一个问题是,即使是在周末,银行假日也会被取消。看到其他输入是如何被检查的,这也是很合适的。
The foreach should therefore be:
因此,foreach应该是:
// subtract the number of bank holidays during the time interval
foreach (DateTime bankHoliday in bankHolidays)
{
DateTime bh = bankHoliday.Date;
// Do not subtract bank holidays when they fall in the weekend to avoid double subtraction
if (bh.DayOfWeek == DayOfWeek.Saturday || bh.DayOfWeek == DayOfWeek.Sunday)
continue;
if (firstDay <= bh && bh <= lastDay)
--businessDays;
}
#22
0
I searched a lot for a, easy to digest, algorithm to calculate the working days between 2 dates, and also to exclude the national holidays, and finally I decide to go with this approach:
我搜索了很多,很容易消化,算法计算了两个日期之间的工作天,也排除了国家假期,最后我决定采用这种方法:
public static int NumberOfWorkingDaysBetween2Dates(DateTime start,DateTime due,IEnumerable<DateTime> holidays)
{
var dic = new Dictionary<DateTime, DayOfWeek>();
var totalDays = (due - start).Days;
for (int i = 0; i < totalDays + 1; i++)
{
if (!holidays.Any(x => x == start.AddDays(i)))
dic.Add(start.AddDays(i), start.AddDays(i).DayOfWeek);
}
return dic.Where(x => x.Value != DayOfWeek.Saturday && x.Value != DayOfWeek.Sunday).Count();
}
Basically I wanted to go with each date and evaluate my conditions:
基本上,我想和每个日期一起去评估我的条件:
- Is not Saturday
- 不是星期六
- Is not Sunday
- 不是星期天
- Is not national holiday
- 不是国定假日
but also I wanted to avoid iterating dates.
但我也想避免重复日期。
By running and measuring the time need it to evaluate 1 full year, I go the following result:
通过跑步和测量时间需要它来评估一整年,我的结果如下:
static void Main(string[] args)
{
var start = new DateTime(2017, 1, 1);
var due = new DateTime(2017, 12, 31);
var sw = Stopwatch.StartNew();
var days = NumberOfWorkingDaysBetween2Dates(start, due,NationalHolidays());
sw.Stop();
Console.WriteLine($"Total working days = {days} --- time: {sw.Elapsed}");
Console.ReadLine();
// result is:
// Total working days = 249-- - time: 00:00:00.0269087
}
#23
-1
This is a generic solution.
这是一个通用的解决方案。
startdayvalue is day number of start date.
startdayvalue是开始日期的日期。
weekendday_1 is day numner of week end.
weekendday_1是周末的天数。
day number - MON - 1, TUE - 2, ... SAT - 6, SUN -7.
日数- MON - 1, TUE - 2,…SAT - 6, SUN -7。
difference is difference between two dates..
区别是两个日期的差。
Example : Start Date : 4 April, 2013, End Date : 14 April, 2013
例子:开始日期:2013年4月4日,结束日期:2013年4月14日。
Difference : 10, startdayvalue : 4, weekendday_1 : 7 (if SUNDAY is a weekend for you.)
区别:10,startdayvalue: 4, weekendday_1: 7(如果周日是你的周末)。
This will give you number of holidays.
这会给你一些假期。
No of business day = (Difference + 1) - holiday1
没有工作日=(差+ 1)-假期。
if (startdayvalue > weekendday_1)
{
if (difference > ((7 - startdayvalue) + weekendday_1))
{
holiday1 = (difference - ((7 - startdayvalue) + weekendday_1)) / 7;
holiday1 = holiday1 + 1;
}
else
{
holiday1 = 0;
}
}
else if (startdayvalue < weekendday_1)
{
if (difference > (weekendday_1 - startdayvalue))
{
holiday1 = (difference - (weekendday_1 - startdayvalue)) / 7;
holiday1 = holiday1 + 1;
}
else if (difference == (weekendday_1 - startdayvalue))
{
holiday1 = 1;
}
else
{
holiday1 = 0;
}
}
else
{
holiday1 = difference / 7;
holiday1 = holiday1 + 1;
}
#24
-1
public enum NonWorkingDays { SaturdaySunday = 0, FridaySaturday = 1 };
public int getBusinessDates(DateTime dateSt, DateTime dateNd, NonWorkingDays nonWorkingDays = NonWorkingDays.SaturdaySunday)
{
List<DateTime> datelist = new List<DateTime>();
while (dateSt.Date < dateNd.Date)
{
datelist.Add((dateSt = dateSt.AddDays(1)));
}
if (nonWorkingDays == NonWorkingDays.SaturdaySunday)
{
return datelist.Count(d => d.DayOfWeek != DayOfWeek.Saturday &&
d.DayOfWeek != DayOfWeek.Friday);
}
else
{
return datelist.Count(d => d.DayOfWeek != DayOfWeek.Friday &&
d.DayOfWeek != DayOfWeek.Saturday);
}
}